메뉴 건너뛰기




Volumn 54, Issue 1, 2007, Pages 145-155

Exploiting the order book for mass customized manufacturing control systems with capacity limitations

Author keywords

Dynamic analysis; Make to order; Mass customized supply chains; Performance measurement; Simulation

Indexed keywords

COMPUTER SIMULATION; DYNAMIC ANALYSIS; SUPPLY CHAIN MANAGEMENT;

EID: 33947220287     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2006.889073     Document Type: Article
Times cited : (65)

References (55)
  • 1
    • 3543086756 scopus 로고
    • "Shared computer-integrated manufacturing for various types of production environment"
    • T. Ari-Samadhi and K. Hoang, "Shared computer-integrated manufacturing for various types of production environment," Int. J. Operations Production Manage., vol. 15, pp. 95-108, 1995.
    • (1995) Int. J. Operations Production Manage. , vol.15 , pp. 95-108
    • Ari-Samadhi, T.1    Hoang, K.2
  • 2
    • 0032132183 scopus 로고    scopus 로고
    • "Make-to-order versus make-to-stock in a production-inventory system with general production times"
    • A. Arreola-Risa and G. DeCroix, "Make-to-order versus make-to-stock in a production-inventory system with general production times," IIE Trans., vol. 30, pp. 705-713, 1998.
    • (1998) IIE Trans. , vol.30 , pp. 705-713
    • Arreola-Risa, A.1    DeCroix, G.2
  • 3
    • 0343948047 scopus 로고
    • "The myth of aggregate planning"
    • G. Buxey, "The myth of aggregate planning," Production Planning Control, vol. 1, pp. 222-234, 1990.
    • (1990) Production Planning Control , vol.1 , pp. 222-234
    • Buxey, G.1
  • 4
    • 0039338851 scopus 로고
    • "Achieving rigid flexibility: Factory focus for the 1990s"
    • R. Collins and R. Schmenner, "Achieving rigid flexibility: Factory focus for the 1990s," Eur. Manage. J., vol. 11, pp. 443-447, 1993.
    • (1993) Eur. Manage. J. , vol.11 , pp. 443-447
    • Collins, R.1    Schmenner, R.2
  • 5
    • 3543069272 scopus 로고
    • "Trade-offs? What trade-offs? Competence and competitiveness in manufacturing strategy"
    • Summer
    • C. Corbett and L. V. Wassenhove, "Trade-offs? what trade-offs? competence and competitiveness in manufacturing strategy," Calif. Manage. Rev., pp. 107-122, Summer, 1993.
    • (1993) Calif. Manage. Rev. , pp. 107-122
    • Corbett, C.1    Wassenhove, L.V.2
  • 8
    • 0004211809 scopus 로고
    • Reading, MA: Addison-Wesley
    • S. Davis, Future Perfect. Reading, MA: Addison-Wesley, 1987.
    • (1987) Future Perfect
    • Davis, S.1
  • 9
    • 0037449229 scopus 로고    scopus 로고
    • "Measuring and avoiding the bullwhip effect: A control theoretic approach"
    • J. Dejonckheere, S. Disney, M. Lambrecht, and D. Towill, "Measuring and avoiding the bullwhip effect: A control theoretic approach," Eur. J. Operational Res., vol. 147, pp. 567-590, 2003.
    • (2003) Eur. J. Operational Res. , vol.147 , pp. 567-590
    • Dejonckheere, J.1    Disney, S.2    Lambrecht, M.3    Towill, D.4
  • 10
    • 0025508136 scopus 로고
    • "A knowledge based system simulation framework for production distribution system design"
    • A. del Vecchio and D. Towill, "A knowledge based system simulation framework for production distribution system design," Comput. Ind., vol. 5, pp. 27-40, 1990.
    • (1990) Comput. Ind. , vol.5 , pp. 27-40
    • del Vecchio, A.1    Towill, D.2
  • 11
    • 0037050385 scopus 로고    scopus 로고
    • "A discrete transfer function model to determine the dynamic stability of vendor managed inventory supply chains"
    • S. Disney and D. Towill, "A discrete transfer function model to determine the dynamic stability of vendor managed inventory supply chains," Int. J. Production Res., vol. 40, pp. 179-204, 2002.
    • (2002) Int. J. Production Res. , vol.40 , pp. 179-204
    • Disney, S.1    Towill, D.2
  • 13
    • 0034325988 scopus 로고    scopus 로고
    • "Approaches to mass customization: Configurations and empirical validation"
    • R. Duray, P. Ward, G. Milligan, and W. Berry, "Approaches to mass customization: Configurations and empirical validation," J. Operations Manage., vol. 18, pp. 605-625, 2000.
    • (2000) J. Operations Manage. , vol.18 , pp. 605-625
    • Duray, R.1    Ward, P.2    Milligan, G.3    Berry, W.4
  • 14
    • 26544444439 scopus 로고
    • "The application of aggregate industrial dynamic techniques to manufacturing systems"
    • Ph.D. dissertation, Univ.Wales College of Cardiff, Cardiff, U.K
    • J. Edghill, "The application of aggregate industrial dynamic techniques to manufacturing systems," Ph.D. dissertation, Univ.Wales College of Cardiff, Cardiff, U.K., 1990.
    • (1990)
    • Edghill, J.1
  • 15
    • 0001025322 scopus 로고
    • "Dynamic behaviour of fundamental manufacturing system design strategies"
    • J. Edghill and D. Towill, "Dynamic behaviour of fundamental manufacturing system design strategies," in Ann. CIRP, 1989, vol. 38, pp. 465-468.
    • (1989) Ann. CIRP , vol.38 , pp. 465-468
    • Edghill, J.1    Towill, D.2
  • 16
    • 0032157298 scopus 로고    scopus 로고
    • "Application of a simulation methodology to the redesign of a logistical control system"
    • G. Evans, M. Naim, and D. Towill, "Application of a simulation methodology to the redesign of a logistical control system," Int. J. Production Econ., vol. 56-57, pp. 157-168, 1998.
    • (1998) Int. J. Production Econ. , vol.56-57 , pp. 157-168
    • Evans, G.1    Naim, M.2    Towill, D.3
  • 17
    • 0031238099 scopus 로고    scopus 로고
    • "Analysis ad design of an adaptive, minimum inventory control system"
    • G. Evans, P. Cheema, and D. Towill, "Analysis ad design of an adaptive, minimum inventory control system," Production Planning Control, vol. 8, pp. 545-557, 1997.
    • (1997) Production Planning Control , vol.8 , pp. 545-557
    • Evans, G.1    Cheema, P.2    Towill, D.3
  • 18
    • 0001037391 scopus 로고
    • "Lasting improvements in manufacturing performance: In search of a new theory"
    • K. Ferdows and A. DeMeyer, "Lasting improvements in manufacturing performance: In search of a new theory," J. Operations Manage., vol. 9, pp. 168-184, 1990.
    • (1990) J. Operations Manage. , vol.9 , pp. 168-184
    • Ferdows, K.1    DeMeyer, A.2
  • 19
    • 0012696839 scopus 로고
    • "Benchmarking a generic family of dynamic manufacturing ordering and control models"
    • J. Ferris and D. Towill, "Benchmarking a generic family of dynamic manufacturing ordering and control models," J. Syst. Eng., vol. 3, pp. 170-182, 1993.
    • (1993) J. Syst. Eng. , vol.3 , pp. 170-182
    • Ferris, J.1    Towill, D.2
  • 20
    • 0012696839 scopus 로고
    • "Benchmarking a generic family of dynamic manufacturing ordering and control models"
    • J. Ferris and D. Towill, "Benchmarking a generic family of dynamic manufacturing ordering and control models," J. Syst. Eng., vol. 3, pp. 170-182, 1993.
    • (1993) J. Syst. Eng. , vol.3 , pp. 170-182
    • Ferris, J.1    Towill, D.2
  • 22
    • 0030206041 scopus 로고    scopus 로고
    • "Inventory trigger control policies developed in terms of control theory"
    • R. Grubbström and J. Wikner, "Inventory trigger control policies developed in terms of control theory," Int. J. Production Econ., vol. 45, pp. 397-406, 1996.
    • (1996) Int. J. Production Econ. , vol.45 , pp. 397-406
    • Grubbström, R.1    Wikner, J.2
  • 23
    • 0000376862 scopus 로고
    • "Customer-order information, leadtimes, and inventories"
    • R. Hariharan and P. Zipkin, "Customer-order information, leadtimes, and inventories," Manage. Sci., vol. 41, pp. 1599-1606, 1995.
    • (1995) Manage. Sci. , vol.41 , pp. 1599-1606
    • Hariharan, R.1    Zipkin, P.2
  • 24
    • 3543121742 scopus 로고
    • "Mass customization: Conceptual underpinnings, opportunities and limits"
    • C. Hart, "Mass customization: Conceptual underpinnings, opportunities and limits," Int. J. Service Ind. Manage., vol. 6, pp. 36-45, 1995.
    • (1995) Int. J. Service Ind. Manage. , vol.6 , pp. 36-45
    • Hart, C.1
  • 27
    • 0029378131 scopus 로고
    • "Managing seasonal fluctuations in demand. Practice and experience of selected industrial enterprises"
    • J. Johansen and J. Riis, "Managing seasonal fluctuations in demand. Practice and experience of selected industrial enterprises," Production Planning Control, vol. 6, pp. 461-468, 1995.
    • (1995) Production Planning Control , vol.6 , pp. 461-468
    • Johansen, J.1    Riis, J.2
  • 28
    • 0000016519 scopus 로고
    • "Dynamic analysis of a WIP compensated decision support system"
    • S. John, M. Naim, and D. Towill, "Dynamic analysis of a WIP compensated decision support system," Int. J. Manuf. Syst. Des., vol. 1, pp. 283-297, 1994.
    • (1994) Int. J. Manuf. Syst. Des. , vol.1 , pp. 283-297
    • John, S.1    Naim, M.2    Towill, D.3
  • 29
    • 85125334963 scopus 로고
    • "Subcontracting, co-ordination, flexibility, and production smoothing in aggregate planning"
    • M. Kaimen and L. Li, "Subcontracting, co-ordination, flexibility, and production smoothing in aggregate planning," Manage. Sci., vol. 36, pp. 1352-1363, 1990.
    • (1990) Manage. Sci. , vol.36 , pp. 1352-1363
    • Kaimen, M.1    Li, L.2
  • 31
    • 84993009244 scopus 로고    scopus 로고
    • "Using the information decoupling point to improve supply chain performance"
    • R. Mason-Jones and D. Towill, "Using the information decoupling point to improve supply chain performance," Int. J. Logistics Manage., vol. 10, pp. 13-26, 1999.
    • (1999) Int. J. Logistics Manage. , vol.10 , pp. 13-26
    • Mason-Jones, R.1    Towill, D.2
  • 33
    • 0026928408 scopus 로고
    • "Aggregate production planning - A survey of models and methodologies"
    • S. Nam and R. Logendran, "Aggregate production planning - A survey of models and methodologies," Eur. J. Operational Res., vol. 61, pp. 255-272, 1992.
    • (1992) Eur. J. Operational Res. , vol.61 , pp. 255-272
    • Nam, S.1    Logendran, R.2
  • 34
    • 0344240982 scopus 로고    scopus 로고
    • "Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain"
    • J. Naylor, M. Naim, and D. Berry, "Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain," Int. J. Production Econ., vol. 62, pp. 107-118, 1999.
    • (1999) Int. J. Production Econ. , vol.62 , pp. 107-118
    • Naylor, J.1    Naim, M.2    Berry, D.3
  • 35
    • 0037575175 scopus 로고
    • "On the positioning of the customer order decoupling point"
    • Jakarta in
    • J. Olhager, "On the positioning of the customer order decoupling point," in Proc. Pacific Conf. Manufacturing, Jakarta, 1994, pp. 1093-1100.
    • (1994) Proc. Pacific Conf. Manufacturing , pp. 1093-1100
    • Olhager, J.1
  • 36
    • 33947226054 scopus 로고    scopus 로고
    • "Strategic positioning of the order penetration point"
    • presented at the Prague
    • J. Olhager, "Strategic positioning of the order penetration point," presented at the ICPR-16, Prague, 2001.
    • (2001) ICPR-16
    • Olhager, J.1
  • 37
    • 0035152163 scopus 로고    scopus 로고
    • "Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning"
    • J. Olhager, M. Rudberg, and J. Wikner, "Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning," Int. J. Production Econ., vol. 69, pp. 215-225, 2001.
    • (2001) Int. J. Production Econ. , vol.69 , pp. 215-225
    • Olhager, J.1    Rudberg, M.2    Wikner, J.3
  • 38
    • 0032658519 scopus 로고    scopus 로고
    • "Manufacturing classifications: Relationships with production control systems"
    • K. Porter, D. Little, P. Matthew, and R. Rollins, "Manufacturing classifications: Relationships with production control systems," Integr. Manuf. Syst., vol. 10, pp. 189-198, 1999.
    • (1999) Integr. Manuf. Syst. , vol.10 , pp. 189-198
    • Porter, K.1    Little, D.2    Matthew, P.3    Rollins, R.4
  • 39
    • 33749548651 scopus 로고    scopus 로고
    • "Utilizing a production system archetype to attenuate bullwhip in a grocery supply chain"
    • in Seville, Spain, Jul. 6-8
    • A. Potter, M. Naim, and S. Disney, "Utilizing a production system archetype to attenuate bullwhip in a grocery supply chain," in Proc. 8th Int. Symp. Logistics, Seville, Spain, Jul. 6-8, 2003, pp. 131-140.
    • (2003) Proc. 8th Int. Symp. Logistics , pp. 131-140
    • Potter, A.1    Naim, M.2    Disney, S.3
  • 40
    • 0036475271 scopus 로고    scopus 로고
    • "Make to order or make to stock: Model and application"
    • S. Rajagopalan, "Make to order or make to stock: Model and application," Manage. Sci., vol. 48, pp. 241-256, 2002.
    • (2002) Manage. Sci. , vol.48 , pp. 241-256
    • Rajagopalan, S.1
  • 41
    • 3142674870 scopus 로고    scopus 로고
    • "Mass customization in terms of the customer order decoupling point"
    • M. Rudberg and J. Wikner, "Mass customization in terms of the customer order decoupling point," Production Planning Control, vol. 13, pp. 445-458, 2004.
    • (2004) Production Planning Control , vol.13 , pp. 445-458
    • Rudberg, M.1    Wikner, J.2
  • 42
    • 0002249048 scopus 로고
    • "The rediscovery of logistics"
    • G. Sharman, "The rediscovery of logistics," Harvard Bus. Rev., vol. 62, no. 5, pp. 71-80, 1984.
    • (1984) Harvard Bus. Rev. , vol.62 , Issue.5 , pp. 71-80
    • Sharman, G.1
  • 43
    • 0001221156 scopus 로고
    • "The focused factory"
    • W. Skinner, "The focused factory," Harvard Bus. Rev., vol. 52, pp. 113-121, 1974.
    • (1974) Harvard Bus. Rev. , vol.52 , pp. 113-121
    • Skinner, W.1
  • 44
    • 0036541991 scopus 로고    scopus 로고
    • "Order-based backorders and their implications in multi-item inventory systems"
    • J. Song, "Order-based backorders and their implications in multi-item inventory systems," Manage. Sci., vol. 48, pp. 499-516, 2002.
    • (2002) Manage. Sci. , vol.48 , pp. 499-516
    • Song, J.1
  • 45
    • 0000361362 scopus 로고
    • "Modeling managerial behavior: Misperceptions of feedback in a dynamic decision-making experiment"
    • J. Sterman, "Modeling managerial behavior: Misperceptions of feedback in a dynamic decision-making experiment," Manage. Sci., vol. 355, pp. 321-339, 1989.
    • (1989) Manage. Sci. , vol.355 , pp. 321-339
    • Sterman, J.1
  • 47
    • 0020203589 scopus 로고
    • "Dynamic analysis of an inventory and order based production control system"
    • D. Towill, "Dynamic analysis of an inventory and order based production control system," Int. J. Production Res., vol. 20, pp. 671-687, 1982.
    • (1982) Int. J. Production Res. , vol.20 , pp. 671-687
    • Towill, D.1
  • 48
    • 0001847466 scopus 로고
    • "The application of filter theory to the study of supply chain dynamics"
    • D. Towill and A. del Vecchio, "The application of filter theory to the study of supply chain dynamics," Production Planning Control, vol. 5, pp. 82-96, 1994.
    • (1994) Production Planning Control , vol.5 , pp. 82-96
    • Towill, D.1    del Vecchio, A.2
  • 49
    • 0035852790 scopus 로고    scopus 로고
    • "Make to stock or make to order: The decoupling point in the food processing industries"
    • D. van Donk, "Make to stock or make to order: The decoupling point in the food processing industries," Int. J. Production Econ., vol. 69, pp. 297-306, 2001.
    • (2001) Int. J. Production Econ. , vol.69 , pp. 297-306
    • van Donk, D.1
  • 50
    • 0035252557 scopus 로고    scopus 로고
    • "Rediscovery of postponement a literature review and directions for research"
    • R. van Hoek, "Rediscovery of postponement a literature review and directions for research," J. Operations Manage., vol. 19, pp. 161-184, 2001.
    • (2001) J. Operations Manage. , vol.19 , pp. 161-184
    • van Hoek, R.1
  • 51
    • 24644508813 scopus 로고    scopus 로고
    • "The effect of time delays in make-to-order information on the dynamics of supply chains"
    • D. Vekstein and K. Preiss, "The effect of time delays in make-to-order information on the dynamics of supply chains," Int. J. Manuf. Technol. Manage., vol. 4, pp. 384-400, 2002.
    • (2002) Int. J. Manuf. Technol. Manage. , vol.4 , pp. 384-400
    • Vekstein, D.1    Preiss, K.2
  • 52
    • 0037943470 scopus 로고
    • "Assemble-to-order manufacturing: Implications for materials management"
    • U. Wemmerlöv, "Assemble-to-order manufacturing: Implications for materials management," J. Operations Manage., vol. 4, pp. 347-368, 1984.
    • (1984) J. Operations Manage. , vol.4 , pp. 347-368
    • Wemmerlöv, U.1
  • 53
    • 0032656380 scopus 로고    scopus 로고
    • "Strategies for integrating lead time and customer-order decisions"
    • Z. Weng, "Strategies for integrating lead time and customer-order decisions," IIE Trans., vol. 31, pp. 161-171, 1999.
    • (1999) IIE Trans. , vol.31 , pp. 161-171
    • Weng, Z.1
  • 55
    • 0032156511 scopus 로고
    • "Customer-order-driven production: An economical concept for responding to demand uncertainty?"
    • G. Zäpfel, "Customer-order-driven production: An economical concept for responding to demand uncertainty?," Int. J. Production Econ., vol. 56-57, pp. 699-709, 1988.
    • (1988) Int. J. Production Econ. , vol.56-57 , pp. 699-709
    • Zäpfel, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.