메뉴 건너뛰기




Volumn 64, Issue 5-8, 2013, Pages 951-959

Scheduling optimization of flexible manufacturing system using cuckoo search-based approach

Author keywords

Cuckoo search (CS); Flexible manufacturing system; Scheduling optimization

Indexed keywords

CUCKOO SEARCHES; FMS SCHEDULING; LEVY FLIGHTS; MACHINE UTILIZATION; OPTIMIZATION APPROACH; PENALTY COST; SCHEDULING OPTIMIZATION; SEARCH-BASED;

EID: 84873707256     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4061-z     Document Type: Article
Times cited : (130)

References (26)
  • 2
    • 18144391228 scopus 로고    scopus 로고
    • Scheduling optimisation of flexible manufacturing systems using particle swarm optimisation algorithm
    • 10.1007/s00170-003-1933-2
    • Jerald J (2005) Scheduling optimisation of flexible manufacturing systems using particle swarm optimisation algorithm. Int J Adv Manuf Technol 25:964-971
    • (2005) Int J Adv Manuf Technol , vol.25 , pp. 964-971
    • Jerald, J.1
  • 3
    • 0142185333 scopus 로고    scopus 로고
    • A multiobjective genetic algorithm for scheduling a flexible manufacturing system
    • 10.1007/s00170-002-1464-2
    • Sankar S et al (2003) A multiobjective genetic algorithm for scheduling a flexible manufacturing system. Int J Adv Manuf Technol 22:229-236
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 229-236
    • Sankar, S.1
  • 4
    • 84858985277 scopus 로고    scopus 로고
    • Engineering optimization by cuckoo search
    • 05829530
    • Yang XS, Deb S (2010) Engineering optimization by cuckoo search. Int J Math Model Numer Optim 1(4):330-343
    • (2010) Int J Math Model Numer Optim , vol.1 , Issue.4 , pp. 330-343
    • Yang, X.S.1    Deb, S.2
  • 5
    • 0020718128 scopus 로고
    • Formulation and solution of non-linear integer production planning problem for flexible manufacturing system
    • 0517.90035 10.1287/mnsc.29.3.273
    • Stecke KE (1983) Formulation and solution of non-linear integer production planning problem for flexible manufacturing system. Manag Sci 29:273-288
    • (1983) Manag Sci , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 6
    • 0023385664 scopus 로고
    • Loading a flexible manufacturing system
    • 10.1080/00207548708919895
    • O'Grady PJ, Menon U (1987) Loading a flexible manufacturing system. Int J Prod Res 25:1053-1068
    • (1987) Int J Prod Res , vol.25 , pp. 1053-1068
    • O'Grady, P.J.1    Menon, U.2
  • 8
    • 33846121916 scopus 로고    scopus 로고
    • FMS scheduling based on timed petro net model and reactive graph search
    • 1144.90383 10.1016/j.apm.2006.10.023
    • Kim, Suzuki, Narikiyo (2007) FMS scheduling based on timed petro net model and reactive graph search. Appl Math Model 31:955-970
    • (2007) Appl Math Model , vol.31 , pp. 955-970
    • Kim1    Suzuki2    Narikiyo3
  • 9
    • 0032639332 scopus 로고    scopus 로고
    • Machine loading and part type selection in flexible manufacturing systems
    • 0949.90509 10.1080/002075499191265
    • Guerrero F, Lozano S, Koltai T, Larraneta J (1999) Machine loading and part type selection in flexible manufacturing systems. Int J Prod Res 37(6):1303-1317
    • (1999) Int J Prod Res , vol.37 , Issue.6 , pp. 1303-1317
    • Guerrero, F.1    Lozano, S.2    Koltai, T.3    Larraneta, J.4
  • 10
    • 34250114086 scopus 로고
    • A large scale machine-loading problem in flexible assembly
    • 10.1007/BF02023747
    • Ammons JC, Lofgren CB, McGinnis (1985) A large scale machine-loading problem in flexible assembly. Ann Oper Res 3:319-322
    • (1985) Ann Oper Res , vol.3 , pp. 319-322
    • Ammons, J.C.1    Lofgren, C.B.2    McGinnis3
  • 11
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • 0571.90036 10.1080/00207548508904730
    • Shanker K, Tzen YJ (1985) A loading and dispatching problem in a random flexible manufacturing system. Int J Prod Res 23(3):579-595
    • (1985) Int J Prod Res , vol.23 , Issue.3 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.2
  • 12
    • 0024673709 scopus 로고
    • Some solution methodologies for loading problems in a flexible manufacturing system
    • 10.1080/00207548908942605
    • Shanker K, Srinivasulu A (1989) Some solution methodologies for loading problems in a flexible manufacturing system. Int J Prod Res 27(6):1019-1034
    • (1989) Int J Prod Res , vol.27 , Issue.6 , pp. 1019-1034
    • Shanker, K.1    Srinivasulu, A.2
  • 13
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach
    • 10.1016/j.rcim.2003.09.001
    • Swamkar R, Tiwari MK (2004) Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robot Comput Integrat Manuf 20:199-209
    • (2004) Robot Comput Integrat Manuf , vol.20 , pp. 199-209
    • Swamkar, R.1    Tiwari, M.K.2
  • 14
    • 84952242943 scopus 로고
    • Loading and control policies for flexible manufacturing system
    • 10.1080/00207548108956679
    • Stecke KE, Solberg JJ (1981) Loading and control policies for flexible manufacturing system. Int J Prod Res 19:481-490
    • (1981) Int J Prod Res , vol.19 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.J.2
  • 15
    • 0006033920 scopus 로고    scopus 로고
    • A hierarchic approach to production planning and scheduling of a flexible manufacturing system
    • 10.1016/S0736-5845(99)00034-4
    • Piero P, Walter U (1999) A hierarchic approach to production planning and scheduling of a flexible manufacturing system. Robot Comput Integrated Manuf 15:373-385
    • (1999) Robot Comput Integrated Manuf , vol.15 , pp. 373-385
    • Piero, P.1    Walter, U.2
  • 16
    • 0000639019 scopus 로고    scopus 로고
    • Scheduling algorithm for flexible manufacturing systems with partially grouped machines
    • 10.1016/S0278-6125(00)86632-7
    • Lee D-H, Yeong-Dae K (1999) Scheduling algorithm for flexible manufacturing systems with partially grouped machines. J Manuf Syst 18(4):301-309
    • (1999) J Manuf Syst , vol.18 , Issue.4 , pp. 301-309
    • Lee, D.-H.1    Yeong-Dae, K.2
  • 17
    • 0029344295 scopus 로고
    • A comparative study of some priority dispatching rules under different shop loads
    • 10.1080/09537289508930284
    • Waiker AM, Sarker BR, Lal AM (1995) A comparative study of some priority dispatching rules under different shop loads. Int J Prod Plan Cont 6(4):301-310
    • (1995) Int J Prod Plan Cont , vol.6 , Issue.4 , pp. 301-310
    • Waiker, A.M.1    Sarker, B.R.2    Lal, A.M.3
  • 18
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • 10.1016/j.cor.2007.02.014
    • Pezella F, Morganti G, Ciaschetti G (2008) A genetic algorithm for the flexible job-shop scheduling problem. Comput Oper Res 35:3202-3212
    • (2008) Comput Oper Res , vol.35 , pp. 3202-3212
    • Pezella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 19
    • 0041083148 scopus 로고    scopus 로고
    • Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms
    • 10.1016/S0278-6125(00)80011-4
    • ElMaraghy H, Patel V (2000) Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms. J Manuf Syst 19(3):186-201
    • (2000) J Manuf Syst , vol.19 , Issue.3 , pp. 186-201
    • Elmaraghy, H.1    Patel, V.2
  • 20
    • 0035917218 scopus 로고    scopus 로고
    • Machine loading problem of FMS: A fuzzy-based heuristic approach
    • 1060.90514 10.1080/00207540010010244
    • Vidyarthi NK, Tiwari MK (2001) Machine loading problem of FMS: a fuzzy-based heuristic approach. Int J Prod Res 39(5):953-979
    • (2001) Int J Prod Res , vol.39 , Issue.5 , pp. 953-979
    • Vidyarthi, N.K.1    Tiwari, M.K.2
  • 21
    • 34247624966 scopus 로고    scopus 로고
    • Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method
    • 10.1016/j.rcim.2006.06.004
    • Rossi A, Dini G (2007) Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Robot Comput Integrated Manuf 23:503-516
    • (2007) Robot Comput Integrated Manuf , vol.23 , pp. 503-516
    • Rossi, A.1    Dini, G.2
  • 22
    • 78049296921 scopus 로고    scopus 로고
    • A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems
    • 10.1016/j.rcim.2010.04.005
    • Zeballos LJ (2010) A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems. Robot Comput Integrated Manuf 26:725-743
    • (2010) Robot Comput Integrated Manuf , vol.26 , pp. 725-743
    • Zeballos, L.J.1
  • 23
    • 78049373367 scopus 로고    scopus 로고
    • Heuristic search for scheduling flexible manufacturing systems using lower bound reachability matrix
    • 10.1016/j.cie.2010.08.006
    • Lee J, Lee SJ (2010) Heuristic search for scheduling flexible manufacturing systems using lower bound reachability matrix. Comput Ind Eng 59:799-806
    • (2010) Comput Ind Eng , vol.59 , pp. 799-806
    • Lee, J.1    Lee, S.J.2
  • 24
    • 60949085988 scopus 로고    scopus 로고
    • A live subclass of Petri nets and their application in modeling flexible manufacturing system
    • 10.1007/s00170-008-1457-x
    • Liu J et al (2009) A live subclass of Petri nets and their application in modeling flexible manufacturing system. Int J Adv Manuf Technol 41:66-74
    • (2009) Int J Adv Manuf Technol , vol.41 , pp. 66-74
    • Liu, J.1
  • 25
    • 70449518313 scopus 로고    scopus 로고
    • Two types of extended RSNBs and their application in modeling flexible manufacturing system
    • 10.1007/s00170-009-1995-x
    • Liu J et al (2009) Two types of extended RSNBs and their application in modeling flexible manufacturing system. Int J Adv Manuf Technol 45:573-582
    • (2009) Int J Adv Manuf Technol , vol.45 , pp. 573-582
    • Liu, J.1
  • 26
    • 34047161047 scopus 로고    scopus 로고
    • Some fundamental aspects of Levy flights
    • 2320432 1142.82341 10.1016/j.chaos.2007.01.055
    • Metzler et al (2007) Some fundamental aspects of Levy flights. Chaos, Solitons and Fractals 34:129-142
    • (2007) Chaos, Solitons and Fractals , vol.34 , pp. 129-142
    • Metzler1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.