-
1
-
-
84871278508
-
-
New Developments. I Tech Education And Publishing, Vienna, Austria:
-
ÇAkar T, Yazgan Hr, KöKer R (2008) Parallel Manipulators, New Developments. I Tech Education And Publishing, Vienna, Austria: 153-170.
-
(2008)
Parallel Manipulators
, pp. 153-170
-
-
ÇAkar, T.1
Yazgan, H.R.2
KöKer, R.3
-
2
-
-
77956843429
-
Development of a vision based object classification system for an industrial robotic manipulator
-
Circuits And Systems Malta
-
KöKer R, Oz C, Ferikoglu A (2001) Development Of A Vision Based Object Classification System For An Industrial Robotic Manipulator. 8Th Ieee International Conference On Electronics, Circuits And Systems, Vol.3, Malta: 1281-1284.
-
(2001)
8Th IEEE International Conference On Electronics
, vol.3
, pp. 1281-1284
-
-
KöKer, R.1
Oz, C.2
Ferikoglu, A.3
-
3
-
-
51349104946
-
Scheduling optimization of component mounting in printed circuit board assembly by prioritizing simultaneous pickup
-
On Intelligent Robots And Systems, San Diego, Ca:
-
Tsuchiya T (2007) Scheduling Optimization Of Component Mounting In Printed Circuit Board Assembly By Prioritizing Simultaneous Pickup. International Conf. On Intelligent Robots And Systems, San Diego, Ca: 2913 - 2918.
-
(2007)
International Conf.
, pp. 2913-2918
-
-
Tsuchiya, T.1
-
4
-
-
0347622799
-
On the integer-valued variables in the linear vertex packing problem
-
Picard J-C, Queyranne M (1977) On The Integer-Valued Variables In The Linear Vertex Packing Problem. Mathematical Programming 12(1):97-101.
-
(1977)
Mathematical Programming
, vol.12
, Issue.1
, pp. 97-101
-
-
Picard, J.-C.1
Queyranne, M.2
-
5
-
-
0019585243
-
A review of production scheduling
-
Graves Sc (1981) A Review Of Production Scheduling. Operations Research 29(4):646-675.
-
(1981)
Operations Research
, vol.29
, Issue.4
, pp. 646-675
-
-
Graves, S.C.1
-
6
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta Jnd, Aldowaisan T (1999) A Review Of Scheduling Research Involving Setup Considerations. Omega 27(2):219-239.
-
(1999)
Omega
, vol.27
, Issue.2
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.2
Aldowaisan, T.3
-
8
-
-
0037061463
-
A heuristic for job shop scheduling to minimize total weighted tardiness
-
Asano M, Ohta H (2002) A Heuristic For Job Shop Scheduling To Minimize Total Weighted Tardiness. Computers And Industrial Engineering 42(2-4):137- 147.
-
(2002)
Computers And Industrial Engineering
, vol.42
, Issue.2-4
, pp. 137-147
-
-
Asano, M.1
Ohta, H.2
-
9
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
Brucker P, Knust S, Schoo A, Thiele O (1998) A Branch And Bound Algorithm For The Resource-Constrained Project Scheduling Problem. European Journal Of Operational Research 107(2):272-288.
-
(1998)
European Journal Of Operational Research
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
10
-
-
12244304898
-
Heuristic methods for the identical parallel machine flow time problem with set-up times
-
Dunstall S, Wirth A (2005) Heuristic Methods For The Identical Parallel Machine Flow Time Problem With Set-Up Times. Computers And Operations Research 32(9):2479-2491.
-
(2005)
Computers And Operations Research
, vol.32
, Issue.9
, pp. 2479-2491
-
-
Dunstall, S.1
Wirth, A.2
-
11
-
-
0035841877
-
Heuristic scheduling of parallel machines with sequence dependent set-up times
-
Kurz Me, Askin Rg (2001) Heuristic Scheduling Of Parallel Machines With Sequence Dependent Set-Up Times. International Journal Of Production Research 39(16):3747-3769.
-
(2001)
International Journal Of Production Research
, vol.39
, Issue.16
, pp. 3747-3769
-
-
Kurz, M.E.1
Askin, R.G.2
-
12
-
-
1242320993
-
Parallel machine scheduling of machine-dependent jobs with unit length
-
Lin Y, Li W (2004) Parallel Machine Scheduling Of Machine-Dependent Jobs With Unit Length. European Journal Of Operational Research 156(1):261-266.
-
(2004)
European Journal Of Operational Research
, vol.156
, Issue.1
, pp. 261-266
-
-
Lin, Y.1
Li, W.2
-
13
-
-
0031206538
-
Scheduling jobs with uncertain setup times and sequence dependency
-
Kim Sc, Bobrowski Pm (1997) Scheduling Jobs With Uncertain Setup Times And Sequence Dependency. Omega 25(4):437-447.
-
(1997)
Omega
, vol.25
, Issue.4
, pp. 437-447
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
15
-
-
0037328729
-
Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
-
Kim Dw, Na Dg, Chen Ff (2003) Unrelated Parallel Machine Scheduling With Setup Times And A Total Weighted Tardiness Objective. Robotics And Computer Integrated Manufacturing 19(1-2):173-181.
-
(2003)
Robotics And Computer Integrated Manufacturing
, vol.19
, Issue.1-2
, pp. 173-181
-
-
Kim, D.W.1
Na, D.G.2
Chen, F.F.3
-
17
-
-
79959572853
-
Heuristic algorithms for scheduling on uniform parallel machines with head and tail
-
Li K, Yang Sl (2011) Heuristic Algorithms For Scheduling On Uniform Parallel Machines With Head And Tail. Journal Of Systems Engineering And Electronics 22(3):462-467.
-
(2011)
Journal Of Systems Engineering And Electronics
, vol.22
, Issue.3
, pp. 462-467
-
-
Li, K.1
Yang, S.L.2
-
18
-
-
79251604516
-
Dominance rule for the parallel machine total weighted tardiness scheduling problem with release dates
-
Jouglet A, Savourey D (2011) Dominance Rule For The Parallel Machine Total Weighted Tardiness Scheduling Problem With Release Dates. Computers & Operations Research 38(9):1259-1266.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.9
, pp. 1259-1266
-
-
Jouglet, A.1
Savourey, D.2
-
19
-
-
79955087599
-
Two-meta heuristics for parallel machine scheduling with job splitting to minimize total tardiness
-
Saricicek I, Celik C (2011) Two-Meta Heuristics For Parallel Machine Scheduling With Job Splitting To Minimize Total Tardiness. Applied Mathematical Modelling 35(8):4117-4126.
-
(2011)
Applied Mathematical Modelling
, vol.35
, Issue.8
, pp. 4117-4126
-
-
Saricicek, I.1
Celik, C.2
-
20
-
-
79952187971
-
Genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
-
Vallada E, Ruiz R (2011) Genetic Algorithm For The Unrelated Parallel Machine Scheduling Problem With Sequence Dependent Setup Times. European Journal Of Operation Research 211(3):612-622.
-
(2011)
European Journal Of Operation Research
, vol.211
, Issue.3
, pp. 612-622
-
-
Vallada, E.1
Ruiz, R.2
-
21
-
-
78549251688
-
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problem
-
Lin Yk, Pfund Me, Fowler Jw (2011) Heuristics For Minimizing Regular Performance Measures In Unrelated Parallel Machine Scheduling Problem. Computers & Operations Research 38(6):901-916.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.6
, pp. 901-916
-
-
Lin, Y.K.1
Pfund, M.E.2
Fowler, J.W.3
-
22
-
-
79951578965
-
Non-identical parallel machine scheduling using genetic algorithm
-
Balin S (2011) Non-Identical Parallel Machine Scheduling Using Genetic Algorithm. Expert Systems With Applications 38(6):6814-6821.
-
(2011)
Expert Systems With Applications
, vol.38
, Issue.6
, pp. 6814-6821
-
-
Balin, S.1
-
23
-
-
79955573105
-
Minimization of total tardiness on unrelated parallel machines with sequence and machine dependent setup times under due date constraints
-
4
-
Lin Sw, Lin Cc, Ying Kc (2011) Minimization Of Total Tardiness On Unrelated Parallel Machines With Sequence And Machine Dependent Setup Times Under Due Date Constraints. International Journal Of Advanced Manufacturing Technology 53(1-4):353- 361.
-
(2011)
International Journal Of Advanced Manufacturing Technology
, vol.1
, Issue.53
, pp. 353-361
-
-
Lin, S.W.1
Lin, C.C.2
Ying, K.C.3
-
24
-
-
78751637765
-
A simulated annealing approach to minimize the maximum lateness on uniform parallel machines
-
Li K, Yang Sl, Ma Hw (2011) A Simulated Annealing Approach To Minimize The Maximum Lateness On Uniform Parallel Machines. Mathematical And Computer Modelling 53(5-6):854-860.
-
(2011)
Mathematical And Computer Modelling
, vol.53
, Issue.5-6
, pp. 854-860
-
-
Li, K.1
Yang, S.L.2
Ma, H.W.3
-
25
-
-
77957908637
-
Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup time
-
Chang Pc, Chen Sh (2011) Integrating Dominance Properties With Genetic Algorithms For Parallel Machine Scheduling Problems With Setup Time. Applied Soft Computing 11(1):1263-1274.
-
(2011)
Applied Soft Computing
, vol.11
, Issue.1
, pp. 1263-1274
-
-
Chang, P.C.1
Chen, S.H.2
-
26
-
-
78650172145
-
Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs
-
Toksari Md, Guner E (2010) Parallel Machine Scheduling Problem To Minimize The Earliness/Tardiness Costs With Learning Effect And Deteriorating Jobs. Journal Of Intelligent Manufacturing 21(6):843-851.
-
(2010)
Journal Of Intelligent Manufacturing
, vol.21
, Issue.6
, pp. 843-851
-
-
Toksari, M.D.1
Guner, E.2
-
30
-
-
0042311378
-
Scheduling unrelated parallel machines to minimize total weighted tardiness
-
Liaw Cy, Lin Yk, Chen Cy, Chen M (2003) Scheduling Unrelated Parallel Machines To Minimize Total Weighted Tardiness. Computers & Operations Research 30(12):1777-1789.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.12
, pp. 1777-1789
-
-
Liaw, C.Y.1
Lin, Y.K.2
Chen, C.Y.3
Chen, M.4
-
32
-
-
0032140746
-
An effective heuristic for minimizing makespan on unrelated parallel machines
-
Srivastava B (1998) An Effective Heuristic For Minimizing Makespan On Unrelated Parallel Machines. Journal Of The Operational Research Society 49(8):886-894.
-
(1998)
Journal Of The Operational Research Society
, vol.49
, Issue.8
, pp. 886-894
-
-
Srivastava, B.1
-
33
-
-
0001679827
-
Exact and approximation algorithms for makespan minimization on unrelated parallel machines
-
Martello S, Soumis F, Toth P (1997) Exact And Approximation Algorithms For Makespan Minimization On Unrelated Parallel Machines, Discrete Applied Mathematics 75 (2): 169-188.
-
(1997)
Discrete Applied Mathematics
, vol.75
, Issue.2
, pp. 169-188
-
-
Martello, S.1
Soumis, F.2
Toth, P.3
-
34
-
-
0006715283
-
Solving parallel machine scheduling problems by column generation
-
Chen Z-L, Powell Wb (1999) Solving Parallel Machine Scheduling Problems By Column Generation. Informs Journal On Computing 11(1):78-94.
-
(1999)
Informs Journal On Computing
, vol.11
, Issue.1
, pp. 78-94
-
-
Chen, Z.-L.1
Powell, W.B.2
-
36
-
-
34548623540
-
Search tree based approaches for parallel machine scheduling
-
NéRon E., Tercinet F., Sourd F. (2008) Search Tree Based Approaches For Parallel Machine Scheduling. Computers And Operations Research 35(4):1127-1137.
-
(2008)
Computers And Operations Research
, vol.35
, Issue.4
, pp. 1127-1137
-
-
NéRon, E.1
Tercinet, F.2
Sourd, F.3
-
37
-
-
0141957114
-
An experimental study of algorithms for weighted completion time scheduling
-
Baev Id, Meleis Wm, Eichenberger A (2002) An Experimental Study Of Algorithms For Weighted Completion Time Scheduling. Algorithmica 22:34-51.
-
(2002)
Algorithmica
, vol.22
, pp. 34-51
-
-
Baev, I.D.1
Meleis, W.M.2
Eichenberger, A.3
-
38
-
-
77955267459
-
Parallel machine scheduling through column generation: Minimax objective functions, release dates, deadlines and/or generalized precedence constraints
-
Utrecht University
-
Van Den Akker M, Hoogeven J, Kempen J (2005) Parallel Machine Scheduling Through Column Generation: Minimax Objective Functions, Release Dates, Deadlines And/Or Generalized Precedence Constraints. Technical Report, Utrecht University
-
(2005)
Technical Report
-
-
Van Den Akker, M.1
Hoogeven, J.2
Kempen, J.3
-
39
-
-
0022074147
-
Parallel processing of robot arm control computation on a multimicroprocessor system
-
Kasahara H, Narita S (1985) Parallel Processing Of Robot Arm Control Computation On A Multimicroprocessor System. Ieee J. Of Robotics Automation Ra-1(2):104-113.
-
(1985)
IEEE J. Of Robotics Automation RA
, vol.1
, Issue.2
, pp. 104-113
-
-
Kasahara, H.1
Narita, S.2
-
40
-
-
0024078868
-
Efficient scheduling algorithm algorithms for robot inverse dynamics computation on a multiprocessor system
-
Chen Cl, Lee Csg, Hou Esh (1988) Efficient Scheduling Algorithm Algorithms For Robot Inverse Dynamics Computation On A Multiprocessor System. Ieee Transaction On Systems, Man And Cybernetics 18:729-743.
-
(1988)
IEEE Transaction On Systems, Man And Cybernetics
, vol.18
, pp. 729-743
-
-
Chen, C.L.1
Lee, C.S.G.2
Hou, E.S.H.3
-
41
-
-
84989675202
-
Heuristics for minimizing mean tardiness for m parallel machines
-
Ho Jc, Chang Y-L (1991) Heuristics For Minimizing Mean Tardiness For M Parallel Machines. Naval Research Logistics 38:367-381.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 367-381
-
-
Ho, J.C.1
Chang, Y.-L.2
-
42
-
-
0015128399
-
An improved algorithm for scheduling independent jobs
-
Wilkerson Lj, Irwin Jd (1971) An Improved Algorithm For Scheduling Independent Jobs. Aiie Transactions 3:239-245.
-
(1971)
Aiie Transactions
, vol.3
, pp. 239-245
-
-
Wilkerson, L.J.1
Irwin, J.D.2
-
43
-
-
34548844749
-
Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm
-
ÇAkar T, KöKer R, Demir Hi (2008) Parallel Robot Scheduling To Minimize Mean Tardiness With Precedence Constraints Using A Genetic Algorithm. Advance In Engineering Software 39:47-54.
-
(2008)
Advance In Engineering Software
, vol.39
, pp. 47-54
-
-
ÇAkar, T.1
KöKer, R.2
Demir, H.I.3
-
44
-
-
34548847857
-
Robust scheduling in a multi robot welding system
-
Control And Information Engineers
-
Kanjo Y, Ase H (2003) Robust Scheduling In A Multi Robot Welding System. Transaction Of The Institute Of Systems, Control And Information Engineers 16(8):369-376.
-
(2003)
Transaction Of The Institute Of Systems
, vol.16
, Issue.8
, pp. 369-376
-
-
Kanjo, Y.1
Ase, H.2
-
45
-
-
34548837322
-
A genetic algorithm based approach to intelligent optimization for scheduling dual resources with robots
-
Jun Sz, Ying Zj (2002) A Genetic Algorithm Based Approach To Intelligent Optimization For Scheduling Dual Resources With Robots. Robot 24(4):342-357.
-
(2002)
Robot
, vol.24
, Issue.4
, pp. 342-357
-
-
Jun, S.Z.1
Ying, Z.J.2
|