-
1
-
-
77957774233
-
Optimal economic ordering policy with deteriorating items under different supplier trade credits for finite horizon case
-
Balkhi, Z.T., 2011. Optimal economic ordering policy with deteriorating items under different supplier trade credits for finite horizon case. International Journal of Production Economics, 133 (1), 216-223.
-
(2011)
International Journal of Production Economics
, vol.133
, Issue.1
, pp. 216-223
-
-
Balkhi, Z.T.1
-
2
-
-
0242333836
-
Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
-
Ben-Daya, M. and Rahim, A., 2003. Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. International Journal of Production Research, 41 (1), 65-79.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.1
, pp. 65-79
-
-
Ben-Daya, M.1
Rahim, A.2
-
3
-
-
34548812552
-
Production lot sizing with process deterioration and machine breakdown
-
Chakraborty, T., Giri, B.C., and Chaudhuri, K.S., 2008. Production lot sizing with process deterioration and machine breakdown. European Journal of Operational Research, 185 (2), 606-618.
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 606-618
-
-
Chakraborty, T.1
Giri, B.C.2
Chaudhuri, K.S.3
-
4
-
-
77955470503
-
Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits
-
Chang, C.T., Teng, J.T., and Chern, M.S., 2010. Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits. International Journal of Production Economics, 127 (1), 197-202.
-
(2010)
International Journal of Production Economics
, vol.127
, Issue.1
, pp. 197-202
-
-
Chang, C.T.1
Teng, J.T.2
Chern, M.S.3
-
5
-
-
85015681703
-
A note on the price of trade credit
-
Chludek, A.K., 2011. A note on the price of trade credit. Managerial Finance, 37 (6), 565-574.
-
(2011)
Managerial Finance
, vol.37
, Issue.6
, pp. 565-574
-
-
Chludek, A.K.1
-
6
-
-
34247518131
-
The profit maximisation model for a multi-item distribution channel
-
Chen, J.M. and Chen, T.H., 2007. The profit maximisation model for a multi-item distribution channel. Transportation Research Part E: Logistics and Transportation Review, 43 (4), 338-354.
-
(2007)
Transportation Research Part E: Logistics and Transportation Review
, vol.43
, Issue.4
, pp. 338-354
-
-
Chen, J.M.1
Chen, T.H.2
-
7
-
-
0038515381
-
The optimal cycle time for EPQ inventory model under permissible delay in payments
-
Chung, K.J. and Huang, Y.F., 2003. The optimal cycle time for EPQ inventory model under permissible delay in payments. International Journal of Production Economics, 84, 307-318.
-
(2003)
International Journal of Production Economics
, vol.84
, pp. 307-318
-
-
Chung, K.J.1
Huang, Y.F.2
-
8
-
-
79953815017
-
Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs
-
Dehayem Nodem, F.I., Gharbi, A., and Kenné, J.P., 2011. Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs. International Journal of Production Research, 49 (12), 3543-3563.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.12
, pp. 3543-3563
-
-
Dehayem Nodem, F.I.1
Gharbi, A.2
Kenné, J.P.3
-
9
-
-
33750030697
-
Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy
-
Huang, Y.F., 2007. Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 176 (3), 1577-1591.
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.3
, pp. 1577-1591
-
-
Huang, Y.F.1
-
10
-
-
40849142278
-
Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives
-
Huang, Y.F. and Huang, H.F., 2008. Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives. International Journal of Systems Science, 39 (5), 539-546.
-
(2008)
International Journal of Systems Science
, vol.39
, Issue.5
, pp. 539-546
-
-
Huang, Y.F.1
Huang, H.F.2
-
11
-
-
39649083996
-
An EOQ model under retailer partial trade credit policy in supply chain
-
Huang, Y.F. and Hsu, K.H., 2008. An EOQ model under retailer partial trade credit policy in supply chain. International Journal of Production Economics, 112 (2), 655-664.
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.2
, pp. 655-664
-
-
Huang, Y.F.1
Hsu, K.H.2
-
12
-
-
77950188775
-
The optimal replenishment decisions under two levels of trade credit policy depending on the order quantity
-
Kreng, V.B. and Tan, S.J., 2010. The optimal replenishment decisions under two levels of trade credit policy depending on the order quantity. Expert Systems with Applications, 37, 5514-5522.
-
(2010)
Expert Systems with Applications
, vol.37
, pp. 5514-5522
-
-
Kreng, V.B.1
Tan, S.J.2
-
13
-
-
84868582471
-
The optimisation of maintenance service levels to support the product service system
-
DOI:10.1080/00207543.2011.616916
-
Kuo, T.C. and Wang, M.L., 2012. The optimisation of maintenance service levels to support the product service system. International Journal of Production Research, DOI:10.1080/00207543.2011.616916.
-
(2012)
International Journal of Production Research
-
-
Kuo, T.C.1
Wang, M.L.2
-
14
-
-
0024914068
-
A production and maintenance planning model with restoration cost depending on detection delay
-
Lee, H.L. and Rosenblatt, M.J., 1989. A production and maintenance planning model with restoration cost depending on detection delay. IIE Transactions, 21 (4), 368-375.
-
(1989)
IIE Transactions
, vol.21
, Issue.4
, pp. 368-375
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
15
-
-
43549120249
-
An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit
-
Liao, J.J., 2008. An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit. International Journal of Production Economics, 113 (2), 852-861.
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.2
, pp. 852-861
-
-
Liao, J.J.1
-
16
-
-
79551629459
-
An integrated production and maintenance planning model with time windows and shortage cost
-
Najid, N.M., Alaoui-Selsouli, M., and Mohafid, A., 2011. An integrated production and maintenance planning model with time windows and shortage cost. International Journal of Production Research, 49 (19), 2265-2283.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.19
, pp. 2265-2283
-
-
Najid, N.M.1
Alaoui-Selsouli, M.2
Mohafid, A.3
-
17
-
-
33751160850
-
A study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments
-
Ouyang, L.Y., Chang, C.T., and Teng, J.T., 2006. A study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments. Computers and Industrial Engineering, 51 (4), 637-651.
-
(2006)
Computers and Industrial Engineering
, vol.51
, Issue.4
, pp. 637-651
-
-
Ouyang, L.Y.1
Chang, C.T.2
Teng, J.T.3
-
18
-
-
34249311990
-
An optimal batch sise for an imperfect production system with quality assurance and rework
-
Ojha, D., Sarker, B.R., and Biswas, P., 2007. An optimal batch sise for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45 (14), 3191-3214.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.14
, pp. 3191-3214
-
-
Ojha, D.1
Sarker, B.R.2
Biswas, P.3
-
19
-
-
56749150314
-
Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
-
Radhoui, M., Reza, N., and Chelbi, A., 2009. Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems. International Journal of Production Research, 47 (2), 389-402.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.2
, pp. 389-402
-
-
Radhoui, M.1
Reza, N.2
Chelbi, A.3
-
20
-
-
70249126214
-
An economic production lot size model in an imperfect production system
-
Sana, S.S., 2010. An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201 (1), 158-170.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.1
, pp. 158-170
-
-
Sana, S.S.1
-
21
-
-
77952896087
-
An EMQ model in an imperfect production process
-
Sana, S.S. and Chaudhuri, K., 2010. An EMQ model in an imperfect production process. International Journal of Systems Science, 41 (6), 635-646.
-
(2010)
International Journal of Systems Science
, vol.41
, Issue.6
, pp. 635-646
-
-
Sana, S.S.1
Chaudhuri, K.2
-
22
-
-
59049085905
-
Retailer's optimal ordering and discounting policies under advance booking discount and trade credits
-
Tsao, Y.C., 2009a. Retailer's optimal ordering and discounting policies under advance booking discount and trade credits. Computers and Industrial Engineering, 56 (1), 208-215.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.1
, pp. 208-215
-
-
Tsao, Y.C.1
-
23
-
-
67549144900
-
Production and payment policies for an imperfect manufacturing system with machine maintenance and credit policies
-
Tsao, Y.C., 2009b. Production and payment policies for an imperfect manufacturing system with machine maintenance and credit policies. International Journal of Technology Management, 48 (2), 240-257.
-
(2009)
International Journal of Technology Management
, vol.48
, Issue.2
, pp. 240-257
-
-
Tsao, Y.C.1
-
24
-
-
77956056053
-
Managing multi-echelon multi-item channels with trade allowances under credit period
-
Tsao, Y.C., 2010. Managing multi-echelon multi-item channels with trade allowances under credit period. International Journal of Production Economics, 127 (2), 226-237.
-
(2010)
International Journal of Production Economics
, vol.127
, Issue.2
, pp. 226-237
-
-
Tsao, Y.C.1
-
25
-
-
84867483334
-
Determination of production run time and warranty length under system maintenance and trade credits
-
DOI:10.1080/00207721.2011.577245
-
Tsao, Y.C., 2011. Determination of production run time and warranty length under system maintenance and trade credits. International Journal of System Science, DOI:10.1080/00207721.2011.577245.
-
(2011)
International Journal of System Science
-
-
Tsao, Y.C.1
-
26
-
-
80055030659
-
A multi-item supply chain with credit period and weight freight cost discounts
-
Tsao, Y.C. and Sheen, G.J., 2012. A multi-item supply chain with credit period and weight freight cost discounts. International Journal of Production Economics, 135 (1), 106-115.
-
(2012)
International Journal of Production Economics
, vol.135
, Issue.1
, pp. 106-115
-
-
Tsao, Y.C.1
Sheen, G.J.2
-
27
-
-
56249101399
-
Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
-
Teng, J.T. and Chang, C.T., 2009. Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195 (2), 358-363.
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.2
, pp. 358-363
-
-
Teng, J.T.1
Chang, C.T.2
-
28
-
-
80052543129
-
Economic order quantity model with trade credit financing for non-decreasing demand
-
Teng, J.T., Min, J., and Goyal, S.K., 2012. Economic order quantity model with trade credit financing for non-decreasing demand. Omega, 40 (3), 328-335.
-
(2012)
Omega
, vol.40
, Issue.3
, pp. 328-335
-
-
Teng, J.T.1
Min, J.2
Goyal, S.K.3
-
29
-
-
0030218654
-
Optimal preventive maintenance policy for deteriorating production system
-
Tseng, S.T., 1996. Optimal preventive maintenance policy for deteriorating production system. IIE Transactions, 28 (8), 687-694.
-
(1996)
IIE Transactions
, vol.28
, Issue.8
, pp. 687-694
-
-
Tseng, S.T.1
-
30
-
-
0037121477
-
A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
-
Yang, P.C. and Wee, H.M., 2002. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. European Journal of Operational Research, 143 (3), 570-581.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 570-581
-
-
Yang, P.C.1
Wee, H.M.2
-
31
-
-
34248585354
-
Optimal threshold value of failure-rate for leased products with preventive maintenance actions
-
Yeh, R.H. and Chang, W.L., 2007. Optimal threshold value of failure-rate for leased products with preventive maintenance actions. Mathematical and Computer Modelling, 46 (5-6), 730-737.
-
(2007)
Mathematical and Computer Modelling
, vol.46
, Issue.5-6
, pp. 730-737
-
-
Yeh, R.H.1
Chang, W.L.2
-
32
-
-
78649791797
-
Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method
-
Yeh, R.H., Chang, W.L., and Lo, H.C., 2010. Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method. Annals of Operations Research, 181 (1), 171-183.
-
(2010)
Annals of Operations Research
, vol.181
, Issue.1
, pp. 171-183
-
-
Yeh, R.H.1
Chang, W.L.2
Lo, H.C.3
-
33
-
-
0035480443
-
Optimal preventive-maintenance warranty policy for repairable products
-
Yeh, R.H. and Lo, H.C., 2001. Optimal preventive-maintenance warranty policy for repairable products. European Journal of Operational Research, 134 (1), 59-69.
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.1
, pp. 59-69
-
-
Yeh, R.H.1
Lo, H.C.2
|