메뉴 건너뛰기




Volumn 51, Issue 5, 2013, Pages 1549-1562

Effects of maintenance policy on an imperfect production system under trade credit

Author keywords

Corrective maintenance; Imperfect production system; Preventive maintenance; Process deterioration; Trade credit

Indexed keywords

CORRECTIVE MAINTENANCE; HI-TECH; IMPERFECT PRODUCTION; IN-CONTROL; MAINTENANCE POLICY; OPTIMAL PRODUCTION; OUT-OF-CONTROL STATE; PRODUCTION MODELS; PRODUCTION PROCESS; PRODUCTION RUN; SOLUTION PROCEDURE; SYSTEM RELIABILITY; TRADE CREDIT;

EID: 84871251052     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.714001     Document Type: Article
Times cited : (23)

References (33)
  • 1
    • 77957774233 scopus 로고    scopus 로고
    • Optimal economic ordering policy with deteriorating items under different supplier trade credits for finite horizon case
    • Balkhi, Z.T., 2011. Optimal economic ordering policy with deteriorating items under different supplier trade credits for finite horizon case. International Journal of Production Economics, 133 (1), 216-223.
    • (2011) International Journal of Production Economics , vol.133 , Issue.1 , pp. 216-223
    • Balkhi, Z.T.1
  • 2
    • 0242333836 scopus 로고    scopus 로고
    • Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
    • Ben-Daya, M. and Rahim, A., 2003. Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. International Journal of Production Research, 41 (1), 65-79.
    • (2003) International Journal of Production Research , vol.41 , Issue.1 , pp. 65-79
    • Ben-Daya, M.1    Rahim, A.2
  • 4
    • 77955470503 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits
    • Chang, C.T., Teng, J.T., and Chern, M.S., 2010. Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits. International Journal of Production Economics, 127 (1), 197-202.
    • (2010) International Journal of Production Economics , vol.127 , Issue.1 , pp. 197-202
    • Chang, C.T.1    Teng, J.T.2    Chern, M.S.3
  • 5
    • 85015681703 scopus 로고    scopus 로고
    • A note on the price of trade credit
    • Chludek, A.K., 2011. A note on the price of trade credit. Managerial Finance, 37 (6), 565-574.
    • (2011) Managerial Finance , vol.37 , Issue.6 , pp. 565-574
    • Chludek, A.K.1
  • 7
    • 0038515381 scopus 로고    scopus 로고
    • The optimal cycle time for EPQ inventory model under permissible delay in payments
    • Chung, K.J. and Huang, Y.F., 2003. The optimal cycle time for EPQ inventory model under permissible delay in payments. International Journal of Production Economics, 84, 307-318.
    • (2003) International Journal of Production Economics , vol.84 , pp. 307-318
    • Chung, K.J.1    Huang, Y.F.2
  • 8
    • 79953815017 scopus 로고    scopus 로고
    • Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs
    • Dehayem Nodem, F.I., Gharbi, A., and Kenné, J.P., 2011. Preventive maintenance and replacement policies for deteriorating production systems subject to imperfect repairs. International Journal of Production Research, 49 (12), 3543-3563.
    • (2011) International Journal of Production Research , vol.49 , Issue.12 , pp. 3543-3563
    • Dehayem Nodem, F.I.1    Gharbi, A.2    Kenné, J.P.3
  • 9
    • 33750030697 scopus 로고    scopus 로고
    • Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy
    • Huang, Y.F., 2007. Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 176 (3), 1577-1591.
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1577-1591
    • Huang, Y.F.1
  • 10
    • 40849142278 scopus 로고    scopus 로고
    • Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives
    • Huang, Y.F. and Huang, H.F., 2008. Optimal inventory replenishment policy for the EPQ model under trade credit derived without derivatives. International Journal of Systems Science, 39 (5), 539-546.
    • (2008) International Journal of Systems Science , vol.39 , Issue.5 , pp. 539-546
    • Huang, Y.F.1    Huang, H.F.2
  • 11
    • 39649083996 scopus 로고    scopus 로고
    • An EOQ model under retailer partial trade credit policy in supply chain
    • Huang, Y.F. and Hsu, K.H., 2008. An EOQ model under retailer partial trade credit policy in supply chain. International Journal of Production Economics, 112 (2), 655-664.
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 655-664
    • Huang, Y.F.1    Hsu, K.H.2
  • 12
    • 77950188775 scopus 로고    scopus 로고
    • The optimal replenishment decisions under two levels of trade credit policy depending on the order quantity
    • Kreng, V.B. and Tan, S.J., 2010. The optimal replenishment decisions under two levels of trade credit policy depending on the order quantity. Expert Systems with Applications, 37, 5514-5522.
    • (2010) Expert Systems with Applications , vol.37 , pp. 5514-5522
    • Kreng, V.B.1    Tan, S.J.2
  • 13
    • 84868582471 scopus 로고    scopus 로고
    • The optimisation of maintenance service levels to support the product service system
    • DOI:10.1080/00207543.2011.616916
    • Kuo, T.C. and Wang, M.L., 2012. The optimisation of maintenance service levels to support the product service system. International Journal of Production Research, DOI:10.1080/00207543.2011.616916.
    • (2012) International Journal of Production Research
    • Kuo, T.C.1    Wang, M.L.2
  • 14
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost depending on detection delay
    • Lee, H.L. and Rosenblatt, M.J., 1989. A production and maintenance planning model with restoration cost depending on detection delay. IIE Transactions, 21 (4), 368-375.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 15
    • 43549120249 scopus 로고    scopus 로고
    • An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit
    • Liao, J.J., 2008. An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit. International Journal of Production Economics, 113 (2), 852-861.
    • (2008) International Journal of Production Economics , vol.113 , Issue.2 , pp. 852-861
    • Liao, J.J.1
  • 16
    • 79551629459 scopus 로고    scopus 로고
    • An integrated production and maintenance planning model with time windows and shortage cost
    • Najid, N.M., Alaoui-Selsouli, M., and Mohafid, A., 2011. An integrated production and maintenance planning model with time windows and shortage cost. International Journal of Production Research, 49 (19), 2265-2283.
    • (2011) International Journal of Production Research , vol.49 , Issue.19 , pp. 2265-2283
    • Najid, N.M.1    Alaoui-Selsouli, M.2    Mohafid, A.3
  • 17
    • 33751160850 scopus 로고    scopus 로고
    • A study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments
    • Ouyang, L.Y., Chang, C.T., and Teng, J.T., 2006. A study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments. Computers and Industrial Engineering, 51 (4), 637-651.
    • (2006) Computers and Industrial Engineering , vol.51 , Issue.4 , pp. 637-651
    • Ouyang, L.Y.1    Chang, C.T.2    Teng, J.T.3
  • 18
    • 34249311990 scopus 로고    scopus 로고
    • An optimal batch sise for an imperfect production system with quality assurance and rework
    • Ojha, D., Sarker, B.R., and Biswas, P., 2007. An optimal batch sise for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45 (14), 3191-3214.
    • (2007) International Journal of Production Research , vol.45 , Issue.14 , pp. 3191-3214
    • Ojha, D.1    Sarker, B.R.2    Biswas, P.3
  • 19
    • 56749150314 scopus 로고    scopus 로고
    • Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
    • Radhoui, M., Reza, N., and Chelbi, A., 2009. Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems. International Journal of Production Research, 47 (2), 389-402.
    • (2009) International Journal of Production Research , vol.47 , Issue.2 , pp. 389-402
    • Radhoui, M.1    Reza, N.2    Chelbi, A.3
  • 20
    • 70249126214 scopus 로고    scopus 로고
    • An economic production lot size model in an imperfect production system
    • Sana, S.S., 2010. An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201 (1), 158-170.
    • (2010) European Journal of Operational Research , vol.201 , Issue.1 , pp. 158-170
    • Sana, S.S.1
  • 22
    • 59049085905 scopus 로고    scopus 로고
    • Retailer's optimal ordering and discounting policies under advance booking discount and trade credits
    • Tsao, Y.C., 2009a. Retailer's optimal ordering and discounting policies under advance booking discount and trade credits. Computers and Industrial Engineering, 56 (1), 208-215.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.1 , pp. 208-215
    • Tsao, Y.C.1
  • 23
    • 67549144900 scopus 로고    scopus 로고
    • Production and payment policies for an imperfect manufacturing system with machine maintenance and credit policies
    • Tsao, Y.C., 2009b. Production and payment policies for an imperfect manufacturing system with machine maintenance and credit policies. International Journal of Technology Management, 48 (2), 240-257.
    • (2009) International Journal of Technology Management , vol.48 , Issue.2 , pp. 240-257
    • Tsao, Y.C.1
  • 24
    • 77956056053 scopus 로고    scopus 로고
    • Managing multi-echelon multi-item channels with trade allowances under credit period
    • Tsao, Y.C., 2010. Managing multi-echelon multi-item channels with trade allowances under credit period. International Journal of Production Economics, 127 (2), 226-237.
    • (2010) International Journal of Production Economics , vol.127 , Issue.2 , pp. 226-237
    • Tsao, Y.C.1
  • 25
    • 84867483334 scopus 로고    scopus 로고
    • Determination of production run time and warranty length under system maintenance and trade credits
    • DOI:10.1080/00207721.2011.577245
    • Tsao, Y.C., 2011. Determination of production run time and warranty length under system maintenance and trade credits. International Journal of System Science, DOI:10.1080/00207721.2011.577245.
    • (2011) International Journal of System Science
    • Tsao, Y.C.1
  • 26
    • 80055030659 scopus 로고    scopus 로고
    • A multi-item supply chain with credit period and weight freight cost discounts
    • Tsao, Y.C. and Sheen, G.J., 2012. A multi-item supply chain with credit period and weight freight cost discounts. International Journal of Production Economics, 135 (1), 106-115.
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 106-115
    • Tsao, Y.C.1    Sheen, G.J.2
  • 27
    • 56249101399 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
    • Teng, J.T. and Chang, C.T., 2009. Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy. European Journal of Operational Research, 195 (2), 358-363.
    • (2009) European Journal of Operational Research , vol.195 , Issue.2 , pp. 358-363
    • Teng, J.T.1    Chang, C.T.2
  • 28
    • 80052543129 scopus 로고    scopus 로고
    • Economic order quantity model with trade credit financing for non-decreasing demand
    • Teng, J.T., Min, J., and Goyal, S.K., 2012. Economic order quantity model with trade credit financing for non-decreasing demand. Omega, 40 (3), 328-335.
    • (2012) Omega , vol.40 , Issue.3 , pp. 328-335
    • Teng, J.T.1    Min, J.2    Goyal, S.K.3
  • 29
    • 0030218654 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy for deteriorating production system
    • Tseng, S.T., 1996. Optimal preventive maintenance policy for deteriorating production system. IIE Transactions, 28 (8), 687-694.
    • (1996) IIE Transactions , vol.28 , Issue.8 , pp. 687-694
    • Tseng, S.T.1
  • 30
    • 0037121477 scopus 로고    scopus 로고
    • A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
    • Yang, P.C. and Wee, H.M., 2002. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. European Journal of Operational Research, 143 (3), 570-581.
    • (2002) European Journal of Operational Research , vol.143 , Issue.3 , pp. 570-581
    • Yang, P.C.1    Wee, H.M.2
  • 31
    • 34248585354 scopus 로고    scopus 로고
    • Optimal threshold value of failure-rate for leased products with preventive maintenance actions
    • Yeh, R.H. and Chang, W.L., 2007. Optimal threshold value of failure-rate for leased products with preventive maintenance actions. Mathematical and Computer Modelling, 46 (5-6), 730-737.
    • (2007) Mathematical and Computer Modelling , vol.46 , Issue.5-6 , pp. 730-737
    • Yeh, R.H.1    Chang, W.L.2
  • 32
    • 78649791797 scopus 로고    scopus 로고
    • Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method
    • Yeh, R.H., Chang, W.L., and Lo, H.C., 2010. Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method. Annals of Operations Research, 181 (1), 171-183.
    • (2010) Annals of Operations Research , vol.181 , Issue.1 , pp. 171-183
    • Yeh, R.H.1    Chang, W.L.2    Lo, H.C.3
  • 33
    • 0035480443 scopus 로고    scopus 로고
    • Optimal preventive-maintenance warranty policy for repairable products
    • Yeh, R.H. and Lo, H.C., 2001. Optimal preventive-maintenance warranty policy for repairable products. European Journal of Operational Research, 134 (1), 59-69.
    • (2001) European Journal of Operational Research , vol.134 , Issue.1 , pp. 59-69
    • Yeh, R.H.1    Lo, H.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.