메뉴 건너뛰기




Volumn 141, Issue 1, 2013, Pages 230-242

Constraint-based ACO for a shared resource constrained scheduling problem

Author keywords

ACO Beam search; Constraint programming; Scheduling; Stochastic Sampling

Indexed keywords

ANT COLONY OPTIMIZATION (ACO); BEAM SEARCH; COMBINATORIAL OPTIMIZATION PROBLEMS; CONSTRAINT PROGRAMMING; CONSTRAINT-BASED; JOB SCHEDULING PROBLEM; MINING SITES; MULTIPLE MACHINE; RESOURCE CONSTRAINT; RESOURCE-CONSTRAINED; SCHEDULING PROBLEM; SHARED RESOURCES; STOCHASTIC SAMPLING; TOTAL-WEIGHTED TARDINESS;

EID: 84869500283     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.06.012     Document Type: Article
Times cited : (36)

References (28)
  • 1
    • 0033871649 scopus 로고    scopus 로고
    • High performance parametric modeling with Nimrod/G: Killer application for the global grid
    • IEEE Computer Society, Washington, DC, USA
    • Abramson, D.; Giddy, J.; Kotler, L.; 2000. High performance parametric modeling with Nimrod/G: killer application for the global grid? In: International Parallel and Distributed Processing Symposium (IPDPS), IEEE Computer Society, Washington, DC, USA, pp. 520-528.
    • (2000) International Parallel and Distributed Processing Symposium (IPDPS) , pp. 520-528
    • Abramson, D.1    Giddy, J.2    Kotler, L.3
  • 2
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • C. Artigues, and F. Roubellat A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes European Journal of Operational Research 127 2 2000 297 316
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 297-316
    • Artigues, C.1    Roubellat, F.2
  • 3
    • 53349118245 scopus 로고    scopus 로고
    • An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
    • F. Ballestin, and N. Trautmann An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem International Journal of Production Research 46 2008 6231 6249
    • (2008) International Journal of Production Research , vol.46 , pp. 6231-6249
    • Ballestin, F.1    Trautmann, N.2
  • 5
    • 9544220684 scopus 로고    scopus 로고
    • Beam-ACO: Hybridizing ant colony optimization with beam search: An application to open shop scheduling
    • C. Blum Beam-ACO: hybridizing ant colony optimization with beam search: an application to open shop scheduling Computers and Operations Research 32 2005 1565 1591
    • (2005) Computers and Operations Research , vol.32 , pp. 1565-1591
    • Blum, C.1
  • 9
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • E. Demeulemeester, and W. Herroelen A branch-and-bound procedure for the multiple resource-constrained project scheduling problem Management Science 38 12 1992 1803 1818
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 22
    • 80052569757 scopus 로고    scopus 로고
    • Resource constraint scheduling with a fractional shared resource
    • G. Singh, and A.T. Ernst Resource constraint scheduling with a fractional shared resource Operations Research Letters 39 5 2011 363 368
    • (2011) Operations Research Letters , vol.39 , Issue.5 , pp. 363-368
    • Singh, G.1    Ernst, A.T.2
  • 24
    • 79959317307 scopus 로고    scopus 로고
    • A multi-agent system for decentralised fractional shared resource constraint scheduling
    • G. Singh, and R. Weiskircher A multi-agent system for decentralised fractional shared resource constraint scheduling Web Intelligence and Agent Systems 9 2 2011 99 108
    • (2011) Web Intelligence and Agent Systems , vol.9 , Issue.2 , pp. 99-108
    • Singh, G.1    Weiskircher, R.2
  • 25
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • J.P. Stinson, E.W. Davis, and B.M. Khumawala Multiple resource-constrained scheduling using branch and bound AIIE Transactions 10 3 1978 252 259
    • (1978) AIIE Transactions , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 26
    • 71049146815 scopus 로고    scopus 로고
    • Hybridizing Beam-ACO with constraint programming for single machine job scheduling
    • Thiruvady, D.; Blum, C.; Meyer, B.; Ernst, A.T.; 2009. Hybridizing Beam-ACO with constraint programming for single machine job scheduling. In: Lecture Notes in Computer Science 5818. pp. 30-44.
    • (2009) Lecture Notes in Computer Science , vol.5818 , pp. 30-44
    • Thiruvady, D.1    Blum, C.2    Meyer, B.3    Ernst A., .T.4
  • 28


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.