Volumn 39, Issue 5, 2011, Pages 363-368

Resource constraint scheduling with a fractional shared resource

Author keywords

Release dates; Resource constraint scheduling; Single shared resource; Total weighted tardiness

Indexed keywords

COMPUTATIONAL RESULTS; LAGRANGIAN RELAXATION; MATHEMATICAL FORMULATION; MINERAL PROCESSING; OFF-GRIDS; RELEASE DATE; RESOURCE CONSTRAINT; SCHEDULING PROBLEM; SHARED RESOURCES; TOTAL-WEIGHTED TARDINESS;

EID: 80052569757     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.orl.2011.06.003     Document Type: Article
Times cited : (47)

References (16)
  • 1
    • 53349118245 scopus 로고    scopus 로고
    • An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
    • F. Ballestin, and N. Trautmann An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem International Journal of Production Research 46 22 2008 6231 6249
    • (2008) International Journal of Production Research , vol.46 , Issue.22 , pp. 6231-6249
    • Ballestin, F.1    Trautmann, N.2
  • 2
    • 0013152010 scopus 로고    scopus 로고
    • The volume algorithm: Producing primal solutions with a subgradient method
    • F. Barahona, and R. Anbil The volume algorithm: producing primal solutions with a subgradient method Mathematical Programming 87 3 2000 385 399
    • (2000) Mathematical Programming , vol.87 , Issue.3 , pp. 385-399
    • Barahona, F.1    Anbil, R.2
  • 4
    • 33748545910 scopus 로고    scopus 로고
    • Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
    • DOI 10.1016/j.tcs.2006.07.011, PII S0304397506004233
    • T.C.E. Chenga, C.T. Ng, and J.J. Yuan Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs Theoretical Computer Science 362 2006 273 281 (Pubitemid 44374206)
    • (2006) Theoretical Computer Science , vol.362 , Issue.1-3 , pp. 273-281
    • Cheng, T.C.E.1    Ng, C.T.2    Yuan, J.J.3
  • 5
    • 33846864716 scopus 로고    scopus 로고
    • A market-based multi-agent system model for decentralized multi-project scheduling
    • G. Confessore, S. Giordani, and S. Rismondo A market-based multi-agent system model for decentralized multi-project scheduling Annals of Operations Research 150 1 2006 115 135
    • (2006) Annals of Operations Research , vol.150 , Issue.1 , pp. 115-135
    • Confessore, G.1    Giordani, S.2    Rismondo, S.3
  • 7
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • DOI 10.1002/nav.10029
    • S. Hartmann A self-adapting genetic algorithm for project scheduling under resource constraints Naval Research Logistics 49 2002 433 448 (Pubitemid 34878877)
    • (2002) Naval Research Logistics , vol.49 , Issue.5 , pp. 433-448
    • Hartmann, S.1
  • 9
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • R. Kolisch, and S. Hartmann Experimental investigation of heuristics for resource-constrained project scheduling: an update European Journal of Operational Research 174 1 2005 23 37
    • (2005) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 10
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolish Serial and parallel resource-constrained project scheduling methods revisited: theory and computation European Journal of Operational Research 90 1996 320 333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolish, R.1
  • 13
    • 0035838752 scopus 로고    scopus 로고
    • An agent-based production control framework for multiple-line collaborative manufacturing
    • DOI 10.1080/00207540110038478
    • T.P. Lu, and Y. Yih An agent-based production control framework for multiple-line collaborative manufacturing International Journal of Production Research 39 10 2001 2155 2176 (Pubitemid 35165587)
    • (2001) International Journal of Production Research , vol.39 , Issue.10 , pp. 2155-2176
    • Lu, T.-P.1    Yih, Y.2
  • 16
    • 0038522570 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A critical activity reordering heuristic
    • F.B.V. Valls, and S. Quintanilla Resource-constrained project scheduling: a critical activity reordering heuristic European Journal of Operational Research 149 2003 282 301
    • (2003) European Journal of Operational Research , vol.149 , pp. 282-301
    • Valls, F.B.V.1    Quintanilla, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.