메뉴 건너뛰기




Volumn 9, Issue 2, 2011, Pages 99-108

A multi-agent system for decentralised fractional shared resource constraint scheduling

Author keywords

approximation algorithms; collaboration; decentralised scheduling; distributed optimisation; Scheduling

Indexed keywords

COLLABORATION; COLLABORATIVE SCHEDULING; COMPUTATIONAL EXPERIMENT; COORDINATION MECHANISMS; DECENTRALISED; DISTRIBUTED OPTIMISATION; LIMITED INFORMATION; OFF-GRIDS; PRIVATE INFORMATION; RESOURCE MANAGERS; SHARED RESOURCES; SOLUTION APPROACH; SOLUTION QUALITY;

EID: 79959317307     PISSN: 15701263     EISSN: None     Source Type: Journal    
DOI: 10.3233/WIA-2011-0208     Document Type: Article
Times cited : (21)

References (16)
  • 1
    • 33744757406 scopus 로고    scopus 로고
    • Multi-domain strategy coordination approach for optimal resource usage in agent based filtering framework
    • S. Albayrak and D. Milosevic, Multi-domain strategy coordination approach for optimal resource usage in agent based filtering framework, Web Intelligence and Agent Systems 4(2) (2006), 239-253. (Pubitemid 43823082)
    • (2006) Web Intelligence and Agent Systems , vol.4 , Issue.2 , pp. 239-253
    • Albayrak, S.1    Milosevic, D.2
  • 3
    • 33748545910 scopus 로고    scopus 로고
    • Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
    • DOI 10.1016/j.tcs.2006.07.011, PII S0304397506004233
    • T.C.E. Cheng, C.T. Ng and J.J. Yuan, Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs, Theoretical Computer Science 362 (2006), 273-281. (Pubitemid 44374206)
    • (2006) Theoretical Computer Science , vol.362 , Issue.1-3 , pp. 273-281
    • Cheng, T.C.E.1    Ng, C.T.2    Yuan, J.J.3
  • 4
    • 33846864716 scopus 로고    scopus 로고
    • A marketbased multi-agent system model for decentralized multiproject scheduling
    • G. Confessore, S. Giordani and S. Rismondo, A marketbased multi-agent system model for decentralized multiproject scheduling, Annals of Operations Research 150(1) (2006), 115-135.
    • (2006) Annals of Operations Research , vol.150 , Issue.1 , pp. 115-135
    • Confessore, G.1    Giordani, S.2    Rismondo, S.3
  • 5
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • DOI 10.1002/nav.10029
    • S. Hartmann, A self-adapting genetic algorithm for project scheduling under resource constraints, Naval Research Logistics 49(5) (2002), 433-448. (Pubitemid 34878877)
    • (2002) Naval Research Logistics , vol.49 , Issue.5 , pp. 433-448
    • Hartmann, S.1
  • 6
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
    • J. Homberger, A multi-agent system for the decentralized resource-constrained multi-project scheduling problem, International Transactions in Operational Research 14(6) (2007), 565-589.
    • (2007) International Transactions in Operational Research , vol.14 , Issue.6 , pp. 565-589
    • Homberger, J.1
  • 7
    • 0003676781 scopus 로고
    • An algorithm for the resource-constrained project scheduling problem
    • MIT
    • T.J.R. Johnson, An algorithm for the resource-constrained project scheduling problem, PhD thesis, MIT, 1967.
    • (1967) PhD Thesis
    • Johnson, T.J.R.1
  • 8
    • 0029733731 scopus 로고    scopus 로고
    • A collaborative process planning and scheduling system
    • DOI 10.1016/0965-9978(95)00080-1
    • J. Kempenaers, J. Pinte, J. Detand and J.P. Kruth, A collaborative process planning and scheduling system, Advances in Engineering Software 25(1) (1996), 3-8. (Pubitemid 126400098)
    • (1996) Advances in Engineering Software , vol.25 , Issue.1 , pp. 3-8
    • Kempenaers, J.1    Pinte, J.2    Detand, J.3    Kruth, J.-P.4
  • 9
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • R. Kolisch and S. Hartmann, Experimental investigation of heuristics for resource-constrained project scheduling: An update, European Journal of Operational Research 174(1) (2005), 23-37.
    • (2005) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 10
    • 0002086462 scopus 로고    scopus 로고
    • Efficient Scheduling of Arbitrary Task Graphs to Multiprocessors Using a Parallel Genetic Algorithm
    • DOI 10.1006/jpdc.1997.1395, PII S0743731597913952
    • Y. Kowk and I. Ahmad, Efficient scheduling of arbitrary task graphs to multiprocessors using a parallel genetic algorithm, Journal of Parallel and Distributed Computing 47(1) (1997), 58-77. (Pubitemid 127340845)
    • (1997) Journal of Parallel and Distributed Computing , vol.47 , Issue.1 , pp. 58-77
    • Kwok, Y.-K.1    Ahmad, I.2
  • 11
    • 0033184840 scopus 로고    scopus 로고
    • On combinatorial auction and Lagrangean relaxation for distributed resource scheduling
    • DOI 10.1023/A:1007666414678
    • E. Kutanoglu and D. Wu, On combinatorial auction and lagrangean relaxation resource scheduling, IIE Transactions 31 (1999), 813-826. (Pubitemid 32080274)
    • (1999) IIE Transactions (Institute of Industrial Engineers) , vol.31 , Issue.9 , pp. 813-826
    • Kutanoglu, E.1    Wu, S.D.2
  • 13
    • 29244458701 scopus 로고    scopus 로고
    • Hybrid negotiation for resource coordination in multiagent systems
    • X. Li and L.-K. Soh, Hybrid negotiation for resource coordination in multiagent systems, Web Intelligence and Agent Systems 3(4) (2005), 231-259. (Pubitemid 41831631)
    • (2005) Web Intelligence and Agent Systems , vol.3 , Issue.4 , pp. 231-259
    • Li, X.1    Soh, L.-K.2
  • 14
    • 0035838752 scopus 로고    scopus 로고
    • An agent-based production control framework for multiple-line collaborative manufacturing
    • DOI 10.1080/00207540110038478
    • T.P. Lu and Y. Yih, An agent-based production control framework for multiple-line collaborative manufacturing, International Journal of Production Research 39(10) (2001), 2155-2176. (Pubitemid 35165587)
    • (2001) International Journal of Production Research , vol.39 , Issue.10 , pp. 2155-2176
    • Lu, T.-P.1    Yih, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.