-
1
-
-
0037118759
-
An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
-
DOI 10.1016/S0377-2217(02)00077-2, PII S0377221702000772
-
Alcaide, A, Rodriguez-Gonzalez, A, and, Sicilia, J. 2002. An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. European Journal of Operational Research, 140 (2): 384-398. (Pubitemid 34435040)
-
(2002)
European Journal of Operational Research
, vol.140
, Issue.2
, pp. 384-398
-
-
Alcaide, D.1
Rodriguez-Gonzalez, A.2
Sicilia, J.3
-
2
-
-
70449686075
-
Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: A case study
-
Alfieri, A. 2009. Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: a case study. International Journal of Production Research, 47 (18): 5129-5145.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.18
, pp. 5129-5145
-
-
Alfieri, A.1
-
3
-
-
0037410252
-
The two- and m -machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
-
Allahverdi, A. 2003. The two- and m -machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. European Journal of Operational Research, 147 (2): 373-396.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.2
, pp. 373-396
-
-
Allahverdi, A.1
-
4
-
-
33749548509
-
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
-
DOI 10.1080/00207540600621029, PII J0534L5672T6N812
-
Allahverdi, A, and, Al-Anzi, FS. 2006. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research, 44 (22): 4713-4735. (Pubitemid 44536479)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.22
, pp. 4713-4735
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
5
-
-
43249106280
-
The two-stage assembly flow shop scheduling problem with bicriteria of makespan and mean completion time
-
Allahverdi, A, and, Al-Anzi, FS. 2007. The two-stage assembly flow shop scheduling problem with bicriteria of makespan and mean completion time. International Journal of Advanced Manufacturing Technology, 37 (1): 166-177.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.1
, pp. 166-177
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
6
-
-
43249106280
-
The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
-
DOI 10.1007/s00170-007-0950-y
-
Allahverdi, A, and, Al-Anzi, FS. 2008. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time. The International Journal of Advanced Manufacturing Technology, 37 (1/2): 166-177. (Pubitemid 351651608)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.1-2
, pp. 166-177
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
7
-
-
0030269849
-
Simulation of different rules in stochastic flowshops
-
Allahverdi, A, and, Tatari, MF. 1996. Simulation of different rules in stochastic flowshops. Computers and Industrial Engineering, 31 (1/2): 209-212. (Pubitemid 126380020)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.1-2
, pp. 209-212
-
-
Allahverdi, A.1
Tatari, M.F.2
-
8
-
-
10444260511
-
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
-
Allaoui, H, and, Artiba, A. 2004. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering, 47 (4): 431-450.
-
(2004)
Computers and Industrial Engineering
, vol.47
, Issue.4
, pp. 431-450
-
-
Allaoui, H.1
Artiba, A.2
-
9
-
-
15344340038
-
Using computer simulation in a heavy electromotors assembly line unit
-
Azadeh, MA, Karimizad, K, and, Shakeri, SH. 2000. Using computer simulation in a heavy electromotors assembly line unit. Journal of Faculty Engineering, University of Tehran, 34 (2): 127-139.
-
(2000)
Journal of Faculty Engineering, University of Tehran
, vol.34
, Issue.2
, pp. 127-139
-
-
Azadeh, M.A.1
Karimizad, K.2
Shakeri, S.H.3
-
10
-
-
78650297118
-
A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flowshop with multiple processors
-
Azadeh, A. 2010a. A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flowshop with multiple processors. International Journal of Advanced Manufacturing Technology, 50 (5-8): 699-715.
-
(2010)
International Journal of Advanced Manufacturing Technology
, vol.50
, Issue.58
, pp. 699-715
-
-
Azadeh, A.1
-
11
-
-
74249087070
-
Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness
-
Azadeh, A. 2010b. Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness. International Journal of Advanced Manufacturing, 46 (5-8): 431-444.
-
(2010)
International Journal of Advanced Manufacturing
, vol.46
, Issue.58
, pp. 431-444
-
-
Azadeh, A.1
-
12
-
-
84962024041
-
Two-stage hybrid flow shop with recirculation
-
Boudhar, M, and, Meziani, N. 2009. Two-stage hybrid flow shop with recirculation. International Transactions in Operational Research, 17 (2): 239-255.
-
(2009)
International Transactions in Operational Research
, vol.17
, Issue.2
, pp. 239-255
-
-
Boudhar, M.1
Meziani, N.2
-
13
-
-
56349119327
-
A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness
-
Braglia, M, and, Grassi, A. 2009. A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness. International Journal of Production Research, 47 (1): 273-288.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.1
, pp. 273-288
-
-
Braglia, M.1
Grassi, A.2
-
14
-
-
3543129498
-
Makespan distributions in flow shop scheduling
-
DOI 10.1108/01443579510080553
-
Caffrey, J, and, Hitchings, G. 1995. Makespan distributions in flow shop scheduling. International Journal of Operations & Production Management, 15 (3): 50-58. (Pubitemid 39032494)
-
(1995)
International Journal of Operations and Production Management
, vol.15
, Issue.3
, pp. 50-58
-
-
Caffrey, J.1
Hitchings, G.2
-
15
-
-
69649105066
-
An evolutionary algorithm for assembly job shop with part sharing
-
Chan, FTS, Wong, TC, and, Chan, LY. 2009. An evolutionary algorithm for assembly job shop with part sharing. Computers and Industrial Engineering, 57 (3): 641-651.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.3
, pp. 641-651
-
-
Chan, F.T.S.1
Wong, T.C.2
Chan, L.Y.3
-
16
-
-
0032628881
-
Scheduling the fabrication and assembly of components in a two-machine flowshop
-
Cheng, TCE, and, Wang, G. 1999. Scheduling the fabrication and assembly of components in a two-machine flowshop. IIE Transactions, 31 (2): 135-443.
-
(1999)
IIE Transactions
, vol.31
, Issue.2
, pp. 135-443
-
-
Cheng, T.C.E.1
Wang, G.2
-
17
-
-
0032599551
-
Generic simulation model for hybrid flow shop
-
Grangeon, N, Tanguy, A, and, Tchernev, N. 1999. Generic simulation model for hybrid flow shop. Computers and Industrial Engineering, 137 (1/2): 207-210.
-
(1999)
Computers and Industrial Engineering
, vol.137
, Issue.12
, pp. 207-210
-
-
Grangeon, N.1
Tanguy, A.2
Tchernev, N.3
-
18
-
-
0031543097
-
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
-
Gupta, JND, Hariri, AMA, and, Potts, CN. 1997. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Annals of Operations Research, 69 (0): 171-191. (Pubitemid 127503103)
-
(1997)
Annals of Operations Research
, vol.69
, pp. 171-191
-
-
Gupta, J.N.D.1
Hariri, A.M.A.2
Potts, C.N.3
-
19
-
-
27144557995
-
A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation
-
DOI 10.1016/j.ejor.2004.08.045, PII S0377221705001402
-
Kalczynski, PJ, and, Kamburowski, J. 2006. A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation. European Journal of Operational Research, 169 (3): 742-750. (Pubitemid 41492012)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 742-750
-
-
Kalczynski, P.J.1
Kamburowski, J.2
-
20
-
-
0346302274
-
Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops
-
Koulamas, C, and, Kyparisis, GJ. 2000. Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops. Naval Research Logistics, 47 (3): 259-268.
-
(2000)
Naval Research Logistics
, vol.47
, Issue.3
, pp. 259-268
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
21
-
-
0035371718
-
The three-stage assembly flowshop scheduling problem
-
DOI 10.1016/S0305-0548(00)00004-6, PII S0305054800000046
-
Koulamas, C, and, Kyparisis, GJ. 2001. The three stage assembly flowshop scheduling problem. Computers and Operations Research, 28 (7): 689-704. (Pubitemid 32379144)
-
(2001)
Computers and Operations Research
, vol.28
, Issue.7
, pp. 689-704
-
-
Koulamas, C.1
Kyparisis, G.2
-
22
-
-
0027590319
-
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
-
Lee, CY, Cheng, TCE, and, Lin, BMT. 1993. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science, 39 (5): 616-625. (Pubitemid 23710442)
-
(1993)
Management Science
, vol.39
, Issue.5
, pp. 616-625
-
-
Lee Chung-Yee1
Cheng, T.C.E.2
Lin, B.M.T.3
-
23
-
-
34548462907
-
A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
-
DOI 10.1016/j.cor.2006.04.004, PII S0305054806001237
-
Low, C, Hsu, CJ, and, Su, CT. 2008. A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines. Computers and Operations Research, 35 (3): 845-853. (Pubitemid 47368842)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.3
, pp. 845-853
-
-
Low, C.1
Hsu, C.-J.2
Su, C.-T.3
-
24
-
-
61349174124
-
Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
-
Manjeshwar, PK, Damodaran, P, and, Srihari, K. 2009. Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing. Robotics and Computer-Integrated Manufacturing, 25 (3): 667-679.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 667-679
-
-
Manjeshwar, P.K.1
Damodaran, P.2
Srihari, K.3
-
25
-
-
0030505165
-
A flow-shop manufacturing scheduling system with interactive computer graphics
-
Onwubolu, GC. 1996. A flow-shop manufacturing scheduling system with interactive computer graphics. International Journal of Operations & Production Management, 16 (9): 74-84.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.9
, pp. 74-84
-
-
Onwubolu, G.C.1
-
26
-
-
0000655488
-
The two-stage assembly scheduling problem: Complexity and approximation
-
Potts, CN. 1995. The two-stage assembly scheduling problem: complexity and approximation. Operations Research, 43 (2): 346-355.
-
(1995)
Operations Research
, vol.43
, Issue.2
, pp. 346-355
-
-
Potts, C.N.1
-
28
-
-
0029635352
-
Heuristics for scheduling in flowshop with multiple objectives
-
Rajendran, C. 1995. Heuristics for scheduling in flowshop with multiple objectives. European Journal of Operational Research, 82 (3): 540-555.
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.3
, pp. 540-555
-
-
Rajendran, C.1
-
29
-
-
75849147656
-
The hybrid flow shop scheduling problem
-
Ruiz, R, and, Vázquez-Rodrguez, JA. 2010. The hybrid flow shop scheduling problem. European Journal of Operational Research, 205 (1): 1-18.
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.1
, pp. 1-18
-
-
Ruiz, R.1
Vázquez-Rodrguez, J.A.2
-
30
-
-
0033102018
-
A bicriteria approach to the two machine flow shop scheduling problem
-
Sayin, S, and, Karabati, S. 1999. A bicriteria approach to the two machine flow shop scheduling problem. European Journal of Operational Research, 113 (2): 435-449.
-
(1999)
European Journal of Operational Research
, vol.113
, Issue.2
, pp. 435-449
-
-
Sayin, S.1
Karabati, S.2
-
31
-
-
27544470030
-
The multiobjective discrete optimization problem: A weighted min-max two-stage optimization approach and a bicriteria algorithm
-
Sayin, S, and, Kouvelis, P. 2005. The multiobjective discrete optimization problem: A weighted min-max two-stage optimization approach and a bicriteria algorithm. Management Science, 51 (10): 1572-1580.
-
(2005)
Management Science
, vol.51
, Issue.10
, pp. 1572-1580
-
-
Sayin, S.1
Kouvelis, P.2
-
32
-
-
36148996530
-
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
-
Shiau, DF, Cheng, SC, and, Huan, YM. 2008. Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm. Expert Systems with Applications, 34 (2): 1133-1143.
-
(2008)
Expert Systems with Applications
, vol.34
, Issue.2
, pp. 1133-1143
-
-
Shiau, D.F.1
Cheng, S.C.2
Huan, Y.M.3
-
33
-
-
79952750723
-
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
-
Shokrollahpour, E, Zandieh, M, and, Dorri, B. 2011. A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem. International Journal of Production Research, 49 (11): 3087-3103.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.11
, pp. 3087-3103
-
-
Shokrollahpour, E.1
Zandieh, M.2
Dorri, B.3
-
34
-
-
0032094736
-
A bicriteria two-machine permutation flowshop problem
-
PII S037722179700338X
-
Sivrikaya-Serifoglu, F, and, Ulusoy, G. 1998. A bicriteria two-machine permutation flowshop problem. European Journal of Operational Research, 107 (2): 414-430. (Pubitemid 128407554)
-
(1998)
European Journal of Operational Research
, vol.107
, Issue.2
, pp. 414-430
-
-
Sivrikaya-Serifoglu, F.1
Ulusoy, G.2
-
35
-
-
0037349179
-
A hybrid two-stage flowshop with limited waiting time constraints
-
Su, LH. 2003. A hybrid two-stage flowshop with limited waiting time constraints. Computers and Industrial Engineering, 44 (3): 409-424.
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.3
, pp. 409-424
-
-
Su, L.H.1
-
36
-
-
79960512575
-
A differential evolution algorithm for the no-idle flowshop scheduling problem with total tardiness criterion
-
Tasgetiren, MF. 2011. A differential evolution algorithm for the no-idle flowshop scheduling problem with total tardiness criterion. International Journal of Production Research, 49 (16): 5033-5050.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.16
, pp. 5033-5050
-
-
Tasgetiren, M.F.1
-
37
-
-
34548237317
-
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
-
DOI 10.1016/j.ins.2007.06.001, PII S0020025507002861
-
Tavakkoli-Moghaddam, R, Rahimi-Vahed, A, and, Mirzaei, AH. 2007. A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness. Information Sciences, 177 (22): 5072-5090. (Pubitemid 47331458)
-
(2007)
Information Sciences
, vol.177
, Issue.22
, pp. 5072-5090
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.2
Mirzaei, A.H.3
-
38
-
-
28044452691
-
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
-
DOI 10.1016/j.cie.2005.06.005, PII S036083520500104X
-
Thiagarajan, S, and, Rajendran, C. 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers and Industrial Engineerin g, 49 (4): 463-503. (Pubitemid 41689975)
-
(2005)
Computers and Industrial Engineering
, vol.49
, Issue.4
, pp. 463-503
-
-
Thiagarajan, S.1
Rajendran, C.2
-
39
-
-
77956619682
-
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
-
Torabzadeh, E, and, Zandieh, M. 2010. Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Advanced Engineering Software, 4 (10): 1238-1243.
-
(2010)
Advanced Engineering Software
, vol.4
, Issue.10
, pp. 1238-1243
-
-
Torabzadeh, E.1
Zandieh, M.2
-
40
-
-
0037290545
-
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
-
DOI 10.1016/S0305-0548(01)00098-3, PII S0305054801000983
-
Tozkoparan, A. Kirca, O., and Chung, C.S., 2003. A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Computers & Operations Research, 30, 2,. 309-320 (Pubitemid 35404984)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.2
, pp. 309-320
-
-
Tozkapan, A.1
Kirca, O.2
Chung, C.-S.3
-
41
-
-
38849150372
-
A note on two-stage hybrid flowshop scheduling with missing operations
-
Tseng, CT, Liao, CJ, and, Liao, TX. 2008. A note on two-stage hybrid flowshop scheduling with missing operations. Computers & Industrial Engineering, 54 (3): 695-704.
-
(2008)
Computers & Industrial Engineering
, vol.54
, Issue.3
, pp. 695-704
-
-
Tseng, C.T.1
Liao, C.J.2
Liao, T.X.3
-
42
-
-
0034421694
-
A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop
-
Tsubone, H. 2000. A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop. Decision Sciences, 31 (1): 197-222.
-
(2000)
Decision Sciences
, vol.31
, Issue.1
, pp. 197-222
-
-
Tsubone, H.1
-
43
-
-
0242289527
-
Design of efficient hybrid neural networks for flexible flow shop scheduling
-
Wang, H, Jacob, V, and, Rolland, E. 2003. Design of efficient hybrid neural networks for flexible flow shop scheduling. Expert Systems, 20 (4): 208-231.
-
(2003)
Expert Systems
, vol.20
, Issue.4
, pp. 208-231
-
-
Wang, H.1
Jacob, V.2
Rolland, E.3
-
44
-
-
69649103114
-
A resource-constrained assembly job shop scheduling problem with Lot Streaming technique
-
Wong, TC, Chan, FTS, and, Chan, LY. 2009. A resource-constrained assembly job shop scheduling problem with Lot Streaming technique. Computers and Industrial Engineering, 57 (3): 983-995.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.3
, pp. 983-995
-
-
Wong, T.C.1
Chan, F.T.S.2
Chan, L.Y.3
-
45
-
-
74549161516
-
A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
-
Yang, J. 2010. A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines. International Journal of Production Research, 48 (5): 1531-1538.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.5
, pp. 1531-1538
-
-
Yang, J.1
-
46
-
-
70349589447
-
Two-machine flow shop scheduling with common due window to minimize weighted number of early and tardy jobs
-
Yeung, WK, Ouz, C, and, Cheng, TCE. 2009. Two-machine flow shop scheduling with common due window to minimize weighted number of early and tardy jobs. Naval Research Logistics, 56 (7): 593-599.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.7
, pp. 593-599
-
-
Yeung, W.K.1
Ouz, C.2
Cheng, T.C.E.3
-
47
-
-
41449119248
-
Neural network-based simulation metamodels for predicting probability distributions
-
DOI 10.1016/j.cie.2007.08.012, PII S0360835207002446
-
Zobel, CW, and, Keeling, KB. 2008. Neural network-based simulation meta-models for predicting probability distributions. Computers and Industrial Engineering, 54 (4): 879-888. (Pubitemid 351458384)
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 879-888
-
-
Zobel, C.W.1
Keeling, K.B.2
|