Volumn 50, Issue 24, 2012, Pages 7271-7284

An integrated neural network-simulation algorithm for performance optimisation of the bi-criteria two-stage assembly flow-shop scheduling problem with stochastic activities

Author keywords

scheduling; simulation applications

Indexed keywords

BI-CRITERIA; DECISION MAKERS; FLOW SHOP SCHEDULING PROBLEM; JOB SCHEDULING; MAKESPAN; MEAN COMPLETION TIME; META MODEL; MULTILAYERED NEURAL NETWORKS; OBJECTIVE FUNCTION VALUES; ON-MACHINES; OPTIMUM VALUE; PERFORMANCE OPTIMISATION; PROCESSING TIME; RUNTIMES; SET-UP TIME; SIMULATION APPLICATIONS; SIMULATION MODEL; SIMULATION SOFTWARE; STOCHASTIC MACHINE BREAKDOWN; VISUAL SLAM; WEIGHTED SUM;

EID: 84868682252     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.645511     Document Type: Article
Times cited : (24)

References (47)
  • 1
    • 0037118759 scopus 로고    scopus 로고
    • An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
    • DOI 10.1016/S0377-2217(02)00077-2, PII S0377221702000772
    • Alcaide, A, Rodriguez-Gonzalez, A, and, Sicilia, J. 2002. An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. European Journal of Operational Research, 140 (2): 384-398. (Pubitemid 34435040)
    • (2002) European Journal of Operational Research , vol.140 , Issue.2 , pp. 384-398
    • Alcaide, D.1    Rodriguez-Gonzalez, A.2    Sicilia, J.3
  • 2
    • 70449686075 scopus 로고    scopus 로고
    • Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: A case study
    • Alfieri, A. 2009. Workload simulation and optimization in multi-criteria hybrid flowshop scheduling: a case study. International Journal of Production Research, 47 (18): 5129-5145.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5129-5145
    • Alfieri, A.1
  • 3
    • 0037410252 scopus 로고    scopus 로고
    • The two- and m -machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
    • Allahverdi, A. 2003. The two- and m -machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. European Journal of Operational Research, 147 (2): 373-396.
    • (2003) European Journal of Operational Research , vol.147 , Issue.2 , pp. 373-396
    • Allahverdi, A.1
  • 4
    • 33749548509 scopus 로고    scopus 로고
    • Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    • DOI 10.1080/00207540600621029, PII J0534L5672T6N812
    • Allahverdi, A, and, Al-Anzi, FS. 2006. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research, 44 (22): 4713-4735. (Pubitemid 44536479)
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4713-4735
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 5
    • 43249106280 scopus 로고    scopus 로고
    • The two-stage assembly flow shop scheduling problem with bicriteria of makespan and mean completion time
    • Allahverdi, A, and, Al-Anzi, FS. 2007. The two-stage assembly flow shop scheduling problem with bicriteria of makespan and mean completion time. International Journal of Advanced Manufacturing Technology, 37 (1): 166-177.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.37 , Issue.1 , pp. 166-177
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 6
    • 43249106280 scopus 로고    scopus 로고
    • The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
    • DOI 10.1007/s00170-007-0950-y
    • Allahverdi, A, and, Al-Anzi, FS. 2008. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time. The International Journal of Advanced Manufacturing Technology, 37 (1/2): 166-177. (Pubitemid 351651608)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.37 , Issue.1-2 , pp. 166-177
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 7
    • 0030269849 scopus 로고    scopus 로고
    • Simulation of different rules in stochastic flowshops
    • Allahverdi, A, and, Tatari, MF. 1996. Simulation of different rules in stochastic flowshops. Computers and Industrial Engineering, 31 (1/2): 209-212. (Pubitemid 126380020)
    • (1996) Computers and Industrial Engineering , vol.31 , Issue.1-2 , pp. 209-212
    • Allahverdi, A.1    Tatari, M.F.2
  • 8
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • Allaoui, H, and, Artiba, A. 2004. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering, 47 (4): 431-450.
    • (2004) Computers and Industrial Engineering , vol.47 , Issue.4 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 10
    • 78650297118 scopus 로고    scopus 로고
    • A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flowshop with multiple processors
    • Azadeh, A. 2010a. A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flowshop with multiple processors. International Journal of Advanced Manufacturing Technology, 50 (5-8): 699-715.
    • (2010) International Journal of Advanced Manufacturing Technology , vol.50 , Issue.58 , pp. 699-715
    • Azadeh, A.1
  • 11
    • 74249087070 scopus 로고    scopus 로고
    • Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness
    • Azadeh, A. 2010b. Integration of simulation, design of experiment and goal programming for minimization of makespan and tardiness. International Journal of Advanced Manufacturing, 46 (5-8): 431-444.
    • (2010) International Journal of Advanced Manufacturing , vol.46 , Issue.58 , pp. 431-444
    • Azadeh, A.1
  • 13
    • 56349119327 scopus 로고    scopus 로고
    • A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness
    • Braglia, M, and, Grassi, A. 2009. A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness. International Journal of Production Research, 47 (1): 273-288.
    • (2009) International Journal of Production Research , vol.47 , Issue.1 , pp. 273-288
    • Braglia, M.1    Grassi, A.2
  • 15
    • 69649105066 scopus 로고    scopus 로고
    • An evolutionary algorithm for assembly job shop with part sharing
    • Chan, FTS, Wong, TC, and, Chan, LY. 2009. An evolutionary algorithm for assembly job shop with part sharing. Computers and Industrial Engineering, 57 (3): 641-651.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 641-651
    • Chan, F.T.S.1    Wong, T.C.2    Chan, L.Y.3
  • 16
    • 0032628881 scopus 로고    scopus 로고
    • Scheduling the fabrication and assembly of components in a two-machine flowshop
    • Cheng, TCE, and, Wang, G. 1999. Scheduling the fabrication and assembly of components in a two-machine flowshop. IIE Transactions, 31 (2): 135-443.
    • (1999) IIE Transactions , vol.31 , Issue.2 , pp. 135-443
    • Cheng, T.C.E.1    Wang, G.2
  • 18
    • 0031543097 scopus 로고    scopus 로고
    • Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    • Gupta, JND, Hariri, AMA, and, Potts, CN. 1997. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Annals of Operations Research, 69 (0): 171-191. (Pubitemid 127503103)
    • (1997) Annals of Operations Research , vol.69 , pp. 171-191
    • Gupta, J.N.D.1    Hariri, A.M.A.2    Potts, C.N.3
  • 19
    • 27144557995 scopus 로고    scopus 로고
    • A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation
    • DOI 10.1016/j.ejor.2004.08.045, PII S0377221705001402
    • Kalczynski, PJ, and, Kamburowski, J. 2006. A heuristic for minimizing the expected makespan in two-machine flow shops with consistent coefficients of variation. European Journal of Operational Research, 169 (3): 742-750. (Pubitemid 41492012)
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 742-750
    • Kalczynski, P.J.1    Kamburowski, J.2
  • 20
    • 0346302274 scopus 로고    scopus 로고
    • Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops
    • Koulamas, C, and, Kyparisis, GJ. 2000. Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops. Naval Research Logistics, 47 (3): 259-268.
    • (2000) Naval Research Logistics , vol.47 , Issue.3 , pp. 259-268
    • Koulamas, C.1    Kyparisis, G.J.2
  • 21
    • 0035371718 scopus 로고    scopus 로고
    • The three-stage assembly flowshop scheduling problem
    • DOI 10.1016/S0305-0548(00)00004-6, PII S0305054800000046
    • Koulamas, C, and, Kyparisis, GJ. 2001. The three stage assembly flowshop scheduling problem. Computers and Operations Research, 28 (7): 689-704. (Pubitemid 32379144)
    • (2001) Computers and Operations Research , vol.28 , Issue.7 , pp. 689-704
    • Koulamas, C.1    Kyparisis, G.2
  • 22
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • Lee, CY, Cheng, TCE, and, Lin, BMT. 1993. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science, 39 (5): 616-625. (Pubitemid 23710442)
    • (1993) Management Science , vol.39 , Issue.5 , pp. 616-625
    • Lee Chung-Yee1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 23
    • 34548462907 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    • DOI 10.1016/j.cor.2006.04.004, PII S0305054806001237
    • Low, C, Hsu, CJ, and, Su, CT. 2008. A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines. Computers and Operations Research, 35 (3): 845-853. (Pubitemid 47368842)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 845-853
    • Low, C.1    Hsu, C.-J.2    Su, C.-T.3
  • 24
    • 61349174124 scopus 로고    scopus 로고
    • Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
    • Manjeshwar, PK, Damodaran, P, and, Srihari, K. 2009. Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing. Robotics and Computer-Integrated Manufacturing, 25 (3): 667-679.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.3 , pp. 667-679
    • Manjeshwar, P.K.1    Damodaran, P.2    Srihari, K.3
  • 25
    • 0030505165 scopus 로고    scopus 로고
    • A flow-shop manufacturing scheduling system with interactive computer graphics
    • Onwubolu, GC. 1996. A flow-shop manufacturing scheduling system with interactive computer graphics. International Journal of Operations & Production Management, 16 (9): 74-84.
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.9 , pp. 74-84
    • Onwubolu, G.C.1
  • 26
    • 0000655488 scopus 로고
    • The two-stage assembly scheduling problem: Complexity and approximation
    • Potts, CN. 1995. The two-stage assembly scheduling problem: complexity and approximation. Operations Research, 43 (2): 346-355.
    • (1995) Operations Research , vol.43 , Issue.2 , pp. 346-355
    • Potts, C.N.1
  • 28
    • 0029635352 scopus 로고
    • Heuristics for scheduling in flowshop with multiple objectives
    • Rajendran, C. 1995. Heuristics for scheduling in flowshop with multiple objectives. European Journal of Operational Research, 82 (3): 540-555.
    • (1995) European Journal of Operational Research , vol.82 , Issue.3 , pp. 540-555
    • Rajendran, C.1
  • 30
    • 0033102018 scopus 로고    scopus 로고
    • A bicriteria approach to the two machine flow shop scheduling problem
    • Sayin, S, and, Karabati, S. 1999. A bicriteria approach to the two machine flow shop scheduling problem. European Journal of Operational Research, 113 (2): 435-449.
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 435-449
    • Sayin, S.1    Karabati, S.2
  • 31
    • 27544470030 scopus 로고    scopus 로고
    • The multiobjective discrete optimization problem: A weighted min-max two-stage optimization approach and a bicriteria algorithm
    • Sayin, S, and, Kouvelis, P. 2005. The multiobjective discrete optimization problem: A weighted min-max two-stage optimization approach and a bicriteria algorithm. Management Science, 51 (10): 1572-1580.
    • (2005) Management Science , vol.51 , Issue.10 , pp. 1572-1580
    • Sayin, S.1    Kouvelis, P.2
  • 32
    • 36148996530 scopus 로고    scopus 로고
    • Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
    • Shiau, DF, Cheng, SC, and, Huan, YM. 2008. Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm. Expert Systems with Applications, 34 (2): 1133-1143.
    • (2008) Expert Systems with Applications , vol.34 , Issue.2 , pp. 1133-1143
    • Shiau, D.F.1    Cheng, S.C.2    Huan, Y.M.3
  • 33
    • 79952750723 scopus 로고    scopus 로고
    • A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
    • Shokrollahpour, E, Zandieh, M, and, Dorri, B. 2011. A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem. International Journal of Production Research, 49 (11): 3087-3103.
    • (2011) International Journal of Production Research , vol.49 , Issue.11 , pp. 3087-3103
    • Shokrollahpour, E.1    Zandieh, M.2    Dorri, B.3
  • 34
    • 0032094736 scopus 로고    scopus 로고
    • A bicriteria two-machine permutation flowshop problem
    • PII S037722179700338X
    • Sivrikaya-Serifoglu, F, and, Ulusoy, G. 1998. A bicriteria two-machine permutation flowshop problem. European Journal of Operational Research, 107 (2): 414-430. (Pubitemid 128407554)
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 414-430
    • Sivrikaya-Serifoglu, F.1    Ulusoy, G.2
  • 35
    • 0037349179 scopus 로고    scopus 로고
    • A hybrid two-stage flowshop with limited waiting time constraints
    • Su, LH. 2003. A hybrid two-stage flowshop with limited waiting time constraints. Computers and Industrial Engineering, 44 (3): 409-424.
    • (2003) Computers and Industrial Engineering , vol.44 , Issue.3 , pp. 409-424
    • Su, L.H.1
  • 36
    • 79960512575 scopus 로고    scopus 로고
    • A differential evolution algorithm for the no-idle flowshop scheduling problem with total tardiness criterion
    • Tasgetiren, MF. 2011. A differential evolution algorithm for the no-idle flowshop scheduling problem with total tardiness criterion. International Journal of Production Research, 49 (16): 5033-5050.
    • (2011) International Journal of Production Research , vol.49 , Issue.16 , pp. 5033-5050
    • Tasgetiren, M.F.1
  • 37
    • 34548237317 scopus 로고    scopus 로고
    • A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
    • DOI 10.1016/j.ins.2007.06.001, PII S0020025507002861
    • Tavakkoli-Moghaddam, R, Rahimi-Vahed, A, and, Mirzaei, AH. 2007. A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness. Information Sciences, 177 (22): 5072-5090. (Pubitemid 47331458)
    • (2007) Information Sciences , vol.177 , Issue.22 , pp. 5072-5090
    • Tavakkoli-Moghaddam, R.1    Rahimi-Vahed, A.2    Mirzaei, A.H.3
  • 38
    • 28044452691 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
    • DOI 10.1016/j.cie.2005.06.005, PII S036083520500104X
    • Thiagarajan, S, and, Rajendran, C. 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers and Industrial Engineerin g, 49 (4): 463-503. (Pubitemid 41689975)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 463-503
    • Thiagarajan, S.1    Rajendran, C.2
  • 39
    • 77956619682 scopus 로고    scopus 로고
    • Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
    • Torabzadeh, E, and, Zandieh, M. 2010. Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Advanced Engineering Software, 4 (10): 1238-1243.
    • (2010) Advanced Engineering Software , vol.4 , Issue.10 , pp. 1238-1243
    • Torabzadeh, E.1    Zandieh, M.2
  • 40
    • 0037290545 scopus 로고    scopus 로고
    • A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
    • DOI 10.1016/S0305-0548(01)00098-3, PII S0305054801000983
    • Tozkoparan, A. Kirca, O., and Chung, C.S., 2003. A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Computers & Operations Research, 30, 2,. 309-320 (Pubitemid 35404984)
    • (2003) Computers and Operations Research , vol.30 , Issue.2 , pp. 309-320
    • Tozkapan, A.1    Kirca, O.2    Chung, C.-S.3
  • 41
    • 38849150372 scopus 로고    scopus 로고
    • A note on two-stage hybrid flowshop scheduling with missing operations
    • Tseng, CT, Liao, CJ, and, Liao, TX. 2008. A note on two-stage hybrid flowshop scheduling with missing operations. Computers & Industrial Engineering, 54 (3): 695-704.
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.3 , pp. 695-704
    • Tseng, C.T.1    Liao, C.J.2    Liao, T.X.3
  • 42
    • 0034421694 scopus 로고    scopus 로고
    • A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop
    • Tsubone, H. 2000. A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop. Decision Sciences, 31 (1): 197-222.
    • (2000) Decision Sciences , vol.31 , Issue.1 , pp. 197-222
    • Tsubone, H.1
  • 43
    • 0242289527 scopus 로고    scopus 로고
    • Design of efficient hybrid neural networks for flexible flow shop scheduling
    • Wang, H, Jacob, V, and, Rolland, E. 2003. Design of efficient hybrid neural networks for flexible flow shop scheduling. Expert Systems, 20 (4): 208-231.
    • (2003) Expert Systems , vol.20 , Issue.4 , pp. 208-231
    • Wang, H.1    Jacob, V.2    Rolland, E.3
  • 44
    • 69649103114 scopus 로고    scopus 로고
    • A resource-constrained assembly job shop scheduling problem with Lot Streaming technique
    • Wong, TC, Chan, FTS, and, Chan, LY. 2009. A resource-constrained assembly job shop scheduling problem with Lot Streaming technique. Computers and Industrial Engineering, 57 (3): 983-995.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 983-995
    • Wong, T.C.1    Chan, F.T.S.2    Chan, L.Y.3
  • 45
    • 74549161516 scopus 로고    scopus 로고
    • A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
    • Yang, J. 2010. A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines. International Journal of Production Research, 48 (5): 1531-1538.
    • (2010) International Journal of Production Research , vol.48 , Issue.5 , pp. 1531-1538
    • Yang, J.1
  • 46
    • 70349589447 scopus 로고    scopus 로고
    • Two-machine flow shop scheduling with common due window to minimize weighted number of early and tardy jobs
    • Yeung, WK, Ouz, C, and, Cheng, TCE. 2009. Two-machine flow shop scheduling with common due window to minimize weighted number of early and tardy jobs. Naval Research Logistics, 56 (7): 593-599.
    • (2009) Naval Research Logistics , vol.56 , Issue.7 , pp. 593-599
    • Yeung, W.K.1    Ouz, C.2    Cheng, T.C.E.3
  • 47
    • 41449119248 scopus 로고    scopus 로고
    • Neural network-based simulation metamodels for predicting probability distributions
    • DOI 10.1016/j.cie.2007.08.012, PII S0360835207002446
    • Zobel, CW, and, Keeling, KB. 2008. Neural network-based simulation meta-models for predicting probability distributions. Computers and Industrial Engineering, 54 (4): 879-888. (Pubitemid 351458384)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 879-888
    • Zobel, C.W.1    Keeling, K.B.2