메뉴 건너뛰기




Volumn 31, Issue 1, 2000, Pages 197-222

A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop

Author keywords

Lot sizing; Operations and production management; Repetitive manufacturing; Simulation

Indexed keywords


EID: 0034421694     PISSN: 00117315     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1540-5915.2000.tb00930.x     Document Type: Review
Times cited : (10)

References (37)
  • 1
    • 0027906633 scopus 로고
    • Two parallel machine sequencing problems involving job processing times
    • Alidaes, B., & Ahmadian, A. (1993). Two parallel machine sequencing problems involving job processing times. European Journal of Operational Research, 70, 335-341.
    • (1993) European Journal of Operational Research , vol.70 , pp. 335-341
    • Alidaes, B.1    Ahmadian, A.2
  • 2
    • 0040905926 scopus 로고
    • Detail scheduling for a class of two-stage intermittent manufacturing systems
    • Belarbi, K., & Hindi, K. S. (1992). Detail scheduling for a class of two-stage intermittent manufacturing systems. Production Planning & Control, 3(1), 36-47.
    • (1992) Production Planning & Control , vol.3 , Issue.1 , pp. 36-47
    • Belarbi, K.1    Hindi, K.S.2
  • 3
    • 0026908992 scopus 로고
    • Flow shop scheduling in a serial multi-product process with transfer and set-up times
    • Cao, J., & Bedworth, D. D. (1992). Flow shop scheduling in a serial multi-product process with transfer and set-up times. International Journal of Production Research, 30(8), 1819-1830.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1819-1830
    • Cao, J.1    Bedworth, D.D.2
  • 5
    • 0028769398 scopus 로고
    • Cyclic scheduling to minimize inventory in a batch flow line
    • Dobson, G., & Yano, C. A. (1994). Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research, 77, 441-461.
    • (1994) European Journal of Operational Research , vol.77 , pp. 441-461
    • Dobson, G.1    Yano, C.A.2
  • 6
    • 0027625565 scopus 로고
    • Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria
    • Guinet, A. G. P. (1993). Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria. International Journal of Production Research, 31(7), 1579-1594.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1579-1594
    • Guinet, A.G.P.1
  • 7
    • 0030170411 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
    • Guinet, A. G. P., & Slomon, M. M. (1996). Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time. International Journal of Production Research, 34(6), 1643-1654.
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1643-1654
    • Guinet, A.G.P.1    Slomon, M.M.2
  • 9
    • 0026190509 scopus 로고
    • Scheduling for a two-stage hybrid flowshop with parallel machines at the second stage
    • Gupta, J. N. D., & Tunc, E. A. (1991). Scheduling for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29(7), 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1489-1502
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 11
    • 0028766191 scopus 로고
    • Study of a NP-hard cyclic scheduling problem: The recurrent job-shop
    • Hannen, C. (1994). Study of a NP-hard cyclic scheduling problem: The recurrent job-shop. European Journal of Production Research, 72, 82-101.
    • (1994) European Journal of Production Research , vol.72 , pp. 82-101
    • Hannen, C.1
  • 12
    • 0040905924 scopus 로고
    • An integrated approach for production planning - A case study
    • Hedge, G. G., Shang, J. S., & Tadikamalla, P. R. (1991). An integrated approach for production planning - A case study. OMEGA, 19(5), 413-419.
    • (1991) OMEGA , vol.19 , Issue.5 , pp. 413-419
    • Hedge, G.G.1    Shang, J.S.2    Tadikamalla, P.R.3
  • 13
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system
    • Hodgeson, T. J., & Wang, D. (1991). Optimal hybrid push/pull control strategies for a parallel multistage system. International Journal of Production Research, 29(6), 1279-1287.
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgeson, T.J.1    Wang, D.2
  • 15
    • 3543134241 scopus 로고
    • The sensitivity of rule combination for scheduling in a hybrid job shop
    • Huq, F., & Huq, Z. (1995). The sensitivity of rule combination for scheduling in a hybrid job shop. International Journal of Operations & Production Management, 15(3), 59-75.
    • (1995) International Journal of Operations & Production Management , vol.15 , Issue.3 , pp. 59-75
    • Huq, F.1    Huq, Z.2
  • 16
    • 84985801774 scopus 로고
    • Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs, F. R., & Bragg, D. J. (1988). Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing. Decision Sciences, 19, 281-294.
    • (1988) Decision Sciences , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2
  • 17
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • Johnson, S. M. (1954). Optimal two-and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 18
    • 0027906646 scopus 로고
    • The complexity of scheduling jobs in repetitive manufacturing systems
    • Kamoun, H., & Sriskandarajah, S. (1993). The complexity of scheduling jobs in repetitive manufacturing systems. European Journal of Production Research, 70, 350-364.
    • (1993) European Journal of Production Research , vol.70 , pp. 350-364
    • Kamoun, H.1    Sriskandarajah, S.2
  • 19
    • 0028408211 scopus 로고
    • An approach to production planning and scheduling in cyclically scheduled manufacturing systems
    • Loerch, A. G., & Muckstadt, J. A. (1994). An approach to production planning and scheduling in cyclically scheduled manufacturing systems. International Journal of Production Research, 32(4), 851-871.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 851-871
    • Loerch, A.G.1    Muckstadt, J.A.2
  • 20
    • 0027148979 scopus 로고
    • The two-machine flow shop problem with arbitrary precedence relations
    • McMahon, G. B., & Lim, C. (1993). The two-machine flow shop problem with arbitrary precedence relations. European Journal of Operational Research, 64, 249-257.
    • (1993) European Journal of Operational Research , vol.64 , pp. 249-257
    • McMahon, G.B.1    Lim, C.2
  • 21
    • 0030173952 scopus 로고    scopus 로고
    • The complexity of a cyclic scheduling problem with identical machines and precedence constraints
    • Munier, A. (1996). The complexity of a cyclic scheduling problem with identical machines and precedence constraints. European Journal of Operational Research, 91, 471-480.
    • (1996) European Journal of Operational Research , vol.91 , pp. 471-480
    • Munier, A.1
  • 22
    • 84985846638 scopus 로고
    • A comparison of sequencing rules for a two-stage hybrid flow shop
    • Narasimhan, S. L., & Mangiameli, P. M. (1987). A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Sciences, 18, 250-265.
    • (1987) Decision Sciences , vol.18 , pp. 250-265
    • Narasimhan, S.L.1    Mangiameli, P.M.2
  • 24
    • 0026188481 scopus 로고
    • Scheduling in a two-machine flow shop with travel time between machines
    • Panwalker, S. S. (1991). Scheduling in a two-machine flow shop with travel time between machines. Journal of the Operational Research Society, 42(7), 609-613.
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.7 , pp. 609-613
    • Panwalker, S.S.1
  • 25
    • 0018444331 scopus 로고
    • A production scheduling problem in the glass-container industry
    • Paul, R. J. (1979). A production scheduling problem in the glass-container industry. Operations Research, 27, 290-302.
    • (1979) Operations Research , vol.27 , pp. 290-302
    • Paul, R.J.1
  • 26
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage continuous multi-production
    • Pinto, J. M., & Grossman, I. E. (1994). Optimal cyclic scheduling of multistage continuous multi-production. Computer Chemical Engineering, 18(9), 797-816.
    • (1994) Computer Chemical Engineering , vol.18 , Issue.9 , pp. 797-816
    • Pinto, J.M.1    Grossman, I.E.2
  • 27
    • 0026868218 scopus 로고
    • Joint lot-sizing and scheduling for multi-stage multi-product flow shops
    • Pinto, P. A., & Rao, B. M. (1992). Joint lot-sizing and scheduling for multi-stage multi-product flow shops. International Journal of Production Research, 30(5), 1137-1152.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1137-1152
    • Pinto, P.A.1    Rao, B.M.2
  • 29
    • 0030500179 scopus 로고    scopus 로고
    • Lot splitting in stochastic flow shop and job shop environments
    • Smunt, T. L., Buss, D. H., & Kropp, D. H. (1996). Lot splitting in stochastic flow shop and job shop environments. Decision Sciences, 27, 215-238.
    • (1996) Decision Sciences , vol.27 , pp. 215-238
    • Smunt, T.L.1    Buss, D.H.2    Kropp, D.H.3
  • 30
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setup
    • So, K. C. (1990). Some heuristics for scheduling jobs on parallel machines with setup. Management Science, 36(4), 467-475.
    • (1990) Management Science , vol.36 , Issue.4 , pp. 467-475
    • So, K.C.1
  • 31
    • 0040905921 scopus 로고
    • Production scheduling system in the food manufacturing industry
    • Yamaguchi City, in Japanese
    • Tsubone, H. (1975). Production scheduling system in the food manufacturing industry. 27th Conference Proceeding of Zennohren Society, Yamaguchi City, 240-244 (in Japanese).
    • (1975) 27th Conference Proceeding of Zennohren Society , pp. 240-244
    • Tsubone, H.1
  • 32
    • 0040311825 scopus 로고
    • A production scheduling system for a hybrid flow shop - A case study
    • Tsubone, H., Ohba, M., Takamuki, H., & Miyake, Y. (1993). A production scheduling system for a hybrid flow shop - A case study. OMEGA, 21(3), 205-214.
    • (1993) OMEGA , vol.21 , Issue.3 , pp. 205-214
    • Tsubone, H.1    Ohba, M.2    Takamuki, H.3    Miyake, Y.4
  • 33
    • 0030291549 scopus 로고    scopus 로고
    • The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
    • Tsubone, H., Ohba, M., & Uetake, T. (1996). The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. International Journal of Production Research, 34(11), 3037-3054.
    • (1996) International Journal of Production Research , vol.34 , Issue.11 , pp. 3037-3054
    • Tsubone, H.1    Ohba, M.2    Uetake, T.3
  • 34
    • 38249032381 scopus 로고
    • Production scheduling system in the flow shop
    • Tsubone, H., & Tanaka, T. (1988). Production scheduling system in the flow shop. OMEGA, 16(6), 608-611.
    • (1988) OMEGA , vol.16 , Issue.6 , pp. 608-611
    • Tsubone, H.1    Tanaka, T.2
  • 36
    • 0028461472 scopus 로고
    • Scheduling a single batch processing machine with non-identical job sizes
    • Uzsoy, U. (1994). Scheduling a single batch processing machine with non-identical job sizes. International Journal of Production Research, 32(7), 1615-1635.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1615-1635
    • Uzsoy, U.1
  • 37
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock, R. J. (1988). An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36(3), 445-453.
    • (1988) Operations Research , vol.36 , Issue.3 , pp. 445-453
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.