-
1
-
-
0027906633
-
Two parallel machine sequencing problems involving job processing times
-
Alidaes, B., & Ahmadian, A. (1993). Two parallel machine sequencing problems involving job processing times. European Journal of Operational Research, 70, 335-341.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 335-341
-
-
Alidaes, B.1
Ahmadian, A.2
-
2
-
-
0040905926
-
Detail scheduling for a class of two-stage intermittent manufacturing systems
-
Belarbi, K., & Hindi, K. S. (1992). Detail scheduling for a class of two-stage intermittent manufacturing systems. Production Planning & Control, 3(1), 36-47.
-
(1992)
Production Planning & Control
, vol.3
, Issue.1
, pp. 36-47
-
-
Belarbi, K.1
Hindi, K.S.2
-
3
-
-
0026908992
-
Flow shop scheduling in a serial multi-product process with transfer and set-up times
-
Cao, J., & Bedworth, D. D. (1992). Flow shop scheduling in a serial multi-product process with transfer and set-up times. International Journal of Production Research, 30(8), 1819-1830.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.8
, pp. 1819-1830
-
-
Cao, J.1
Bedworth, D.D.2
-
5
-
-
0028769398
-
Cyclic scheduling to minimize inventory in a batch flow line
-
Dobson, G., & Yano, C. A. (1994). Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research, 77, 441-461.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 441-461
-
-
Dobson, G.1
Yano, C.A.2
-
6
-
-
0027625565
-
Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria
-
Guinet, A. G. P. (1993). Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria. International Journal of Production Research, 31(7), 1579-1594.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.7
, pp. 1579-1594
-
-
Guinet, A.G.P.1
-
7
-
-
0030170411
-
Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
-
Guinet, A. G. P., & Slomon, M. M. (1996). Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time. International Journal of Production Research, 34(6), 1643-1654.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1643-1654
-
-
Guinet, A.G.P.1
Slomon, M.M.2
-
8
-
-
0023995996
-
Two-stage hybrid flowshop scheduling problem
-
Gupta, J. N. D. (1988). Two-stage hybrid flowshop scheduling problem. Journal of the Operational Research Society, 39(4), 359-364.
-
(1988)
Journal of the Operational Research Society
, vol.39
, Issue.4
, pp. 359-364
-
-
Gupta, J.N.D.1
-
9
-
-
0026190509
-
Scheduling for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J. N. D., & Tunc, E. A. (1991). Scheduling for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29(7), 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
11
-
-
0028766191
-
Study of a NP-hard cyclic scheduling problem: The recurrent job-shop
-
Hannen, C. (1994). Study of a NP-hard cyclic scheduling problem: The recurrent job-shop. European Journal of Production Research, 72, 82-101.
-
(1994)
European Journal of Production Research
, vol.72
, pp. 82-101
-
-
Hannen, C.1
-
12
-
-
0040905924
-
An integrated approach for production planning - A case study
-
Hedge, G. G., Shang, J. S., & Tadikamalla, P. R. (1991). An integrated approach for production planning - A case study. OMEGA, 19(5), 413-419.
-
(1991)
OMEGA
, vol.19
, Issue.5
, pp. 413-419
-
-
Hedge, G.G.1
Shang, J.S.2
Tadikamalla, P.R.3
-
13
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multistage system
-
Hodgeson, T. J., & Wang, D. (1991). Optimal hybrid push/pull control strategies for a parallel multistage system. International Journal of Production Research, 29(6), 1279-1287.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1279-1287
-
-
Hodgeson, T.J.1
Wang, D.2
-
14
-
-
0043043661
-
Primitive scheduling in a two-stage multiprocessor flow shop is NP-hard
-
Hoogeveen, J. A., Lenstra, J. K., & Veltman, B. (1996). Primitive scheduling in a two-stage multiprocessor flow shop is NP-hard. European Journal of Operational Research, 89, 172-175.
-
(1996)
European Journal of Operational Research
, vol.89
, pp. 172-175
-
-
Hoogeveen, J.A.1
Lenstra, J.K.2
Veltman, B.3
-
15
-
-
3543134241
-
The sensitivity of rule combination for scheduling in a hybrid job shop
-
Huq, F., & Huq, Z. (1995). The sensitivity of rule combination for scheduling in a hybrid job shop. International Journal of Operations & Production Management, 15(3), 59-75.
-
(1995)
International Journal of Operations & Production Management
, vol.15
, Issue.3
, pp. 59-75
-
-
Huq, F.1
Huq, Z.2
-
16
-
-
84985801774
-
Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
-
Jacobs, F. R., & Bragg, D. J. (1988). Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing. Decision Sciences, 19, 281-294.
-
(1988)
Decision Sciences
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
17
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
Johnson, S. M. (1954). Optimal two-and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
18
-
-
0027906646
-
The complexity of scheduling jobs in repetitive manufacturing systems
-
Kamoun, H., & Sriskandarajah, S. (1993). The complexity of scheduling jobs in repetitive manufacturing systems. European Journal of Production Research, 70, 350-364.
-
(1993)
European Journal of Production Research
, vol.70
, pp. 350-364
-
-
Kamoun, H.1
Sriskandarajah, S.2
-
19
-
-
0028408211
-
An approach to production planning and scheduling in cyclically scheduled manufacturing systems
-
Loerch, A. G., & Muckstadt, J. A. (1994). An approach to production planning and scheduling in cyclically scheduled manufacturing systems. International Journal of Production Research, 32(4), 851-871.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 851-871
-
-
Loerch, A.G.1
Muckstadt, J.A.2
-
20
-
-
0027148979
-
The two-machine flow shop problem with arbitrary precedence relations
-
McMahon, G. B., & Lim, C. (1993). The two-machine flow shop problem with arbitrary precedence relations. European Journal of Operational Research, 64, 249-257.
-
(1993)
European Journal of Operational Research
, vol.64
, pp. 249-257
-
-
McMahon, G.B.1
Lim, C.2
-
21
-
-
0030173952
-
The complexity of a cyclic scheduling problem with identical machines and precedence constraints
-
Munier, A. (1996). The complexity of a cyclic scheduling problem with identical machines and precedence constraints. European Journal of Operational Research, 91, 471-480.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 471-480
-
-
Munier, A.1
-
22
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow shop
-
Narasimhan, S. L., & Mangiameli, P. M. (1987). A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Sciences, 18, 250-265.
-
(1987)
Decision Sciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
23
-
-
0021466086
-
Scheduling in a two-stage manufacturing process
-
Narasimhan, S. L., & Panwalker, S. S. (1984). Scheduling in a two-stage manufacturing process. International Journal of Production Research, 22(4), 555-564.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.4
, pp. 555-564
-
-
Narasimhan, S.L.1
Panwalker, S.S.2
-
24
-
-
0026188481
-
Scheduling in a two-machine flow shop with travel time between machines
-
Panwalker, S. S. (1991). Scheduling in a two-machine flow shop with travel time between machines. Journal of the Operational Research Society, 42(7), 609-613.
-
(1991)
Journal of the Operational Research Society
, vol.42
, Issue.7
, pp. 609-613
-
-
Panwalker, S.S.1
-
25
-
-
0018444331
-
A production scheduling problem in the glass-container industry
-
Paul, R. J. (1979). A production scheduling problem in the glass-container industry. Operations Research, 27, 290-302.
-
(1979)
Operations Research
, vol.27
, pp. 290-302
-
-
Paul, R.J.1
-
26
-
-
0028500039
-
Optimal cyclic scheduling of multistage continuous multi-production
-
Pinto, J. M., & Grossman, I. E. (1994). Optimal cyclic scheduling of multistage continuous multi-production. Computer Chemical Engineering, 18(9), 797-816.
-
(1994)
Computer Chemical Engineering
, vol.18
, Issue.9
, pp. 797-816
-
-
Pinto, J.M.1
Grossman, I.E.2
-
27
-
-
0026868218
-
Joint lot-sizing and scheduling for multi-stage multi-product flow shops
-
Pinto, P. A., & Rao, B. M. (1992). Joint lot-sizing and scheduling for multi-stage multi-product flow shops. International Journal of Production Research, 30(5), 1137-1152.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.5
, pp. 1137-1152
-
-
Pinto, P.A.1
Rao, B.M.2
-
29
-
-
0030500179
-
Lot splitting in stochastic flow shop and job shop environments
-
Smunt, T. L., Buss, D. H., & Kropp, D. H. (1996). Lot splitting in stochastic flow shop and job shop environments. Decision Sciences, 27, 215-238.
-
(1996)
Decision Sciences
, vol.27
, pp. 215-238
-
-
Smunt, T.L.1
Buss, D.H.2
Kropp, D.H.3
-
30
-
-
0025413493
-
Some heuristics for scheduling jobs on parallel machines with setup
-
So, K. C. (1990). Some heuristics for scheduling jobs on parallel machines with setup. Management Science, 36(4), 467-475.
-
(1990)
Management Science
, vol.36
, Issue.4
, pp. 467-475
-
-
So, K.C.1
-
31
-
-
0040905921
-
Production scheduling system in the food manufacturing industry
-
Yamaguchi City, in Japanese
-
Tsubone, H. (1975). Production scheduling system in the food manufacturing industry. 27th Conference Proceeding of Zennohren Society, Yamaguchi City, 240-244 (in Japanese).
-
(1975)
27th Conference Proceeding of Zennohren Society
, pp. 240-244
-
-
Tsubone, H.1
-
32
-
-
0040311825
-
A production scheduling system for a hybrid flow shop - A case study
-
Tsubone, H., Ohba, M., Takamuki, H., & Miyake, Y. (1993). A production scheduling system for a hybrid flow shop - A case study. OMEGA, 21(3), 205-214.
-
(1993)
OMEGA
, vol.21
, Issue.3
, pp. 205-214
-
-
Tsubone, H.1
Ohba, M.2
Takamuki, H.3
Miyake, Y.4
-
33
-
-
0030291549
-
The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
-
Tsubone, H., Ohba, M., & Uetake, T. (1996). The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. International Journal of Production Research, 34(11), 3037-3054.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.11
, pp. 3037-3054
-
-
Tsubone, H.1
Ohba, M.2
Uetake, T.3
-
34
-
-
38249032381
-
Production scheduling system in the flow shop
-
Tsubone, H., & Tanaka, T. (1988). Production scheduling system in the flow shop. OMEGA, 16(6), 608-611.
-
(1988)
OMEGA
, vol.16
, Issue.6
, pp. 608-611
-
-
Tsubone, H.1
Tanaka, T.2
-
35
-
-
0039719979
-
A production scheduling system in a hybrid flow shop
-
Uetake, T., Tsubone, H., & Ohba, M. (1995). A production scheduling system in a hybrid flow shop. International Journal of Production Economics, 41, 395-398.
-
(1995)
International Journal of Production Economics
, vol.41
, pp. 395-398
-
-
Uetake, T.1
Tsubone, H.2
Ohba, M.3
-
36
-
-
0028461472
-
Scheduling a single batch processing machine with non-identical job sizes
-
Uzsoy, U. (1994). Scheduling a single batch processing machine with non-identical job sizes. International Journal of Production Research, 32(7), 1615-1635.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1615-1635
-
-
Uzsoy, U.1
-
37
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R. J. (1988). An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36(3), 445-453.
-
(1988)
Operations Research
, vol.36
, Issue.3
, pp. 445-453
-
-
Wittrock, R.J.1
|