메뉴 건너뛰기




Volumn 50, Issue 20, 2012, Pages 5809-5822

Asynchronous teams for joint lot-sizing and scheduling problem in flow shops

Author keywords

asynchronous team; flow shop; lot sizing; scheduling

Indexed keywords

ASYNCHRONOUS TEAM; FEASIBLE SOLUTION; FLOW-SHOPS; INTEGRATED PRODUCTION; LOT SIZING; LOT SIZING PROBLEMS; MACHINE SETUP; MIXED INTEGER PROGRAMMING; PLANNING HORIZONS; PROBLEM INSTANCES; PRODUCTION AND INVENTORY; PRODUCTION LINE; PRODUCTION LOT SIZE; PRODUCTION SCHEDULE; SCHEDULING PROBLEM; SEQUENCE-DEPENDENT;

EID: 84867357938     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.628955     Document Type: Article
Times cited : (6)

References (26)
  • 1
    • 34548460398 scopus 로고    scopus 로고
    • Single machine multi-product capacitated lot sizing with sequence-dependent setups
    • Almada-Lobo, B., 2007. Single machine multi-product capacitated lot sizing with sequence-dependent setups. International Journal of Production Research, 45 (20), 4873-4894.
    • (2007) International Journal of Production Research , vol.45 , Issue.20 , pp. 4873-4894
    • Almada-Lobo, B.1
  • 4
    • 28244496090 scopus 로고    scopus 로고
    • Benchmarking optimization software with performance profiles
    • Dolan, E.D. and Moré, J.J., 2002. Benchmarking optimization software with performance profiles. Mathematical Programming, 91 (2), 201-213.
    • (2002) Mathematical Programming , vol.91 , Issue.2 , pp. 201-213
    • Dolan, E.D.1    Moré, J.J.2
  • 5
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling: Survey and extensions
    • Drexl, A. and Kimms, A., 1997. Lot sizing and scheduling: Survey and extensions. European Journal of Operational Research, 99 (2), 221-235.
    • (1997) European Journal of Operational Research , vol.99 , Issue.2 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 6
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot sizing and scheduling for multi-product multi-level production
    • Fandel, G. and Stammen-Hegene, C., 2006. Simultaneous lot sizing and scheduling for multi-product multi-level production. International Journal of Production Economics, 104 (2), 308-316.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 308-316
    • Fandel, G.1    Stammen-Hegene, C.2
  • 7
    • 5644274147 scopus 로고    scopus 로고
    • The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • Gupta, D. and Magnusson, T., 2005. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research, 32 (4), 727-747.
    • (2005) Computers & Operations Research , vol.32 , Issue.4 , pp. 727-747
    • Gupta, D.1    Magnusson, T.2
  • 8
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • Karimi, B., Fatemi Ghomi, S.M.T., and Wilson, J.M., 2003. The capacitated lot sizing problem: A review of models and algorithms. Omega, 31 (5), 365-378.
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 9
    • 0031076889 scopus 로고    scopus 로고
    • A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes
    • Lee, I., Sikora, R., and Shaw, M.J., 1997. A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes. IEEE Transactions on Systems, Man, and Cybernetics, Part B, 27 (1), 36-54.
    • (1997) IEEE Transactions on Systems, Man, and Cybernetics, Part B , vol.27 , Issue.1 , pp. 36-54
    • Lee, I.1    Sikora, R.2    Shaw, M.J.3
  • 10
    • 38749126774 scopus 로고    scopus 로고
    • Asynchronous Teams for probe selection problems
    • Meneses, C.N., Pardalos, P.M., and Ragle, M., 2008. Asynchronous Teams for probe selection problems. Discrete Optimization, 5 (10), 74-87.
    • (2008) Discrete Optimization , vol.5 , Issue.10 , pp. 74-87
    • Meneses, C.N.1    Pardalos, P.M.2    Ragle, M.3
  • 12
    • 79951579589 scopus 로고    scopus 로고
    • Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups
    • Mohammadi, M. and Fatemi Ghomi, S.M.T., 2011. Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups. Expert Systems with Applications, 38 (6), 7201-7207.
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 7201-7207
    • Mohammadi, M.1    Fatemi Ghomi, S.M.T.2
  • 13
    • 77951134643 scopus 로고    scopus 로고
    • MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
    • Mohammadi, M., et al., 2010a. MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. International Journal of Production Research, 48 (10), 2957-2973.
    • (2010) International Journal of Production Research , vol.48 , Issue.10 , pp. 2957-2973
    • Mohammadi, M.1
  • 14
    • 77953612086 scopus 로고    scopus 로고
    • A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequencedependent setups
    • Mohammadi, M., et al., 2010b. A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequencedependent setups. The International Journal of Advanced Manufacturing Technology, 49 (1), 201-211.
    • (2010) The International Journal of Advanced Manufacturing Technology , vol.49 , Issue.1 , pp. 201-211
    • Mohammadi, M.1
  • 15
    • 77955661126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
    • Mohammadi, M., et al., 2010c. Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. Journal of Intelligent Manufacturing, 21 (4), 501-510.
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.4 , pp. 501-510
    • Mohammadi, M.1
  • 16
    • 78650596925 scopus 로고    scopus 로고
    • A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups
    • Mohammadi, M., Fatemi Ghomi, S.M.T., and Jafari, N., 2011. A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups. International Journal of Computer Integrated Manufacturing, 24 (1), 87-93.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.1 , pp. 87-93
    • Mohammadi, M.1    Fatemi Ghomi, S.M.T.2    Jafari, N.3
  • 18
    • 0024090481 scopus 로고
    • Random number generators: Good ones are hard to find
    • Park, S. and Miller, K., 1988. Random number generators: Good ones are hard to find. Communications of the ACM, 31 (10), 1192-1201.
    • (1988) Communications of the ACM , vol.31 , Issue.10 , pp. 1192-1201
    • Park, S.1    Miller, K.2
  • 19
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts, C.N. and Van Wassenhove, L.N., 1992. Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of Operational Research Society, 43 (5), 395-406.
    • (1992) Journal of Operational Research Society , vol.43 , Issue.5 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 20
    • 0030241588 scopus 로고    scopus 로고
    • A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line
    • Sikora, R., 1996. A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line. Computers and Industrial Engineering, 30 (4), 969-981.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 969-981
    • Sikora, R.1
  • 21
    • 0030241757 scopus 로고    scopus 로고
    • Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line
    • Sikora, R., Chhajed, D., and Shaw, M.J., 1996. Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line. Computers and Industrial Engineering, 30 (4), 659-679.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 659-679
    • Sikora, R.1    Chhajed, D.2    Shaw, M.J.3
  • 23
    • 0032294890 scopus 로고    scopus 로고
    • Asynchronous Teams: Cooperation schemes for autonomous agents
    • Talukdar, S., et al., 1998. Asynchronous Teams: Cooperation schemes for autonomous agents. Journal of Heuristics, 4 (4), 295-321.
    • (1998) Journal of Heuristics , vol.4 , Issue.4 , pp. 295-321
    • Talukdar, S.1
  • 24
    • 21244448610 scopus 로고    scopus 로고
    • Asynchronous teams
    • F. Glover and G.A. Kochenberger, eds. New York: Springer
    • Talukdar, S., Murthy, S., and Akkiraju, R., 2003. Asynchronous Teams. In: F. Glover and G.A. Kochenberger, eds. Handbook of metaheuristics. New York: Springer, 537-556.
    • (2003) Handbook of Metaheuristics , pp. 537-556
    • Talukdar, S.1    Murthy, S.2    Akkiraju, R.3
  • 26
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup a literature review
    • Zhu, X. and Wilhelm, W.E., 2006. Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions, 38 (11), 987-1007.
    • (2006) IIE Transactions , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.