-
1
-
-
36849051282
-
The significance of reducing setup times/setup costs
-
Allahverdi, A. and Soroush, H.M., 2008. The significance of reducing setup times/setup costs. European Journal of Operational Research, 187 (3), 978-984.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 978-984
-
-
Allahverdi, A.1
Soroush, H.M.2
-
2
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
-
3
-
-
78149290542
-
Imperialist Competitive Algorithm: An algorithm for optimization inspired by imperialistic competition
-
Atashpaz-Gargari, E. and Lucas, C., 2007. Imperialist Competitive Algorithm: An algorithm for optimization inspired by imperialistic competition. IEEE Congress on Evolutionary Computation, 4661-4667.
-
(2007)
IEEE Congress on Evolutionary Computation
, pp. 4661-4667
-
-
Atashpaz-Gargari, E.1
Lucas, C.2
-
4
-
-
0041810535
-
Minimizing the weighted number of tardy jobs on a two-machine flowshop
-
Bulfin, R.L. and M'Hallah, R., 2003. Minimizing the weighted number of tardy jobs on a two-machine flowshop. Computers & Operations Research, 30 (12), 1887-1900.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.12
, pp. 1887-1900
-
-
Bulfin, R.L.1
M'Hallah, R.2
-
5
-
-
0014807274
-
A heuristic algorithm for the n-job and m-machine sequencing problem
-
Campbell, H.G., Dudek, R.A., and Smith, M.L., 1970. A heuristic algorithm for the n-job and m-machine sequencing problem. Management Science, 16 (10), 630-637.
-
(1970)
Management Science
, vol.16
, Issue.10
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
6
-
-
53349129893
-
Bottleneck-based heuristic to minimize tardy jobs in flexible flow line with unrelated parallel machines
-
Chen, C.L. and Chen, C.L., 2008. Bottleneck-based heuristic to minimize tardy jobs in flexible flow line with unrelated parallel machines. International Journal of Production Research, 46 (22), 6415-6430.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.22
, pp. 6415-6430
-
-
Chen, C.L.1
Chen, C.L.2
-
7
-
-
0033907095
-
Minimizing tardy jobs in a flowshop with common due date
-
Della Croce, F., Gupta, J.N.D., and Tadei, R., 2000. Minimizing tardy jobs in a flowshop with common due date. European Journal of Operational Research, 120 (2), 375-381.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 375-381
-
-
Della Croce, F.1
Gupta, J.N.D.2
Tadei, R.3
-
10
-
-
0032166084
-
Minimizing tardy jobs in a two-stage hybrid flowshop
-
Gupta, J.N.D. and Tunc, E.A., 1998. Minimizing tardy jobs in a two-stage hybrid flowshop. International Journal of Production Research, 36 (9), 2397-2417.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2397-2417
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
11
-
-
0024303819
-
A branch and bound algorithm to minimize the number of late jobs in a permutation flowshop
-
Hariri, A.M.A. and Potts, C.N., 1989. A branch and bound algorithm to minimize the number of late jobs in a permutation flowshop. European Journal of Operational Research, 38 (2), 228-237.
-
(1989)
European Journal of Operational Research
, vol.38
, Issue.2
, pp. 228-237
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
12
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
Johnson, S.M., 1954. Optimal two-and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1 (1), 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
13
-
-
77951139709
-
Complexity of machine scheduling
-
Lenstra, J.K., Rinnooy Kan, A.H.G., and Brucker, P., 1977. Complexity of machine scheduling. Annals of Discrete Mathematics, 1, 343-62.
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 343-62
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
Brucker, P.3
-
15
-
-
0000062028
-
An n job, one machine sequencing algorithm for minimizing the number of late
-
Moore, J.M., 1968. An n job, one machine sequencing algorithm for minimizing the number of late. Management Science, 15, 102-109.
-
(1968)
Management Science
, vol.15
, pp. 102-109
-
-
Moore, J.M.1
-
16
-
-
70449561153
-
Scheduling job shop problems with sequence-dependent setup times
-
Naderi, B., Zandieh, M., and Fatemi Ghomi, S.M.T., 2009. Scheduling job shop problems with sequence-dependent setup times. International Journal of Production Research, 47 (21), 5959-5976.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 5959-5976
-
-
Naderi, B.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
18
-
-
69549091707
-
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
-
Ruiz-Torresa, A.J., Ablanedo-Rosasb, J.H., and Ho, J.C., 2010. Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility. Computers & Operations Research, 37 (2), 282-291.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.2
, pp. 282-291
-
-
Ruiz-Torresa, A.J.1
Ablanedo-Rosasb, J.H.2
Ho, J.C.3
-
19
-
-
68249091110
-
Total flowtime minimization in a flowshop sequence-dependent group scheduling problem
-
Salmasi, N., Logendran, R., and Skandari, M.R., 2010. Total flowtime minimization in a flowshop sequence-dependent group scheduling problem. Computers & Operations Research, 37 (1), 199-212.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.1
, pp. 199-212
-
-
Salmasi, N.1
Logendran, R.2
Skandari, M.R.3
-
20
-
-
0037449230
-
Minimizing due date related performance measures on two batch processing machines
-
Sung, C.S. and Kim, Y.H., 2003. Minimizing due date related performance measures on two batch processing machines. European Journal of Operational Research, 147 (3), 644-656.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.3
, pp. 644-656
-
-
Sung, C.S.1
Kim, Y.H.2
|