Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs

Author keywords

flow shop; imperialist competitive; mathematical modelling; minimising the number of tardy jobs; sequence dependent setup time; tabu search

Indexed keywords

COMPETITIVE ALGORITHMS; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; IMPERIALIST COMPETITIVE; META HEURISTIC ALGORITHM; MIXED INTEGER LINEAR PROGRAMMING; NP-HARD; NUMBER OF TARDY JOBS; RANDOM TESTS; RESEARCH PROBLEMS; SEQUENCE-DEPENDENT; SEQUENCE-DEPENDENT SETUP TIME; SPLIT-PLOT DESIGN; STATISTICAL EXPERIMENTS;

EID: 84867356068     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.632385     Document Type: Article
Times cited : (24)

References (20)
  • 2
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi, A., et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1
  • 3
    • 78149290542 scopus 로고    scopus 로고
    • Imperialist Competitive Algorithm: An algorithm for optimization inspired by imperialistic competition
    • Atashpaz-Gargari, E. and Lucas, C., 2007. Imperialist Competitive Algorithm: An algorithm for optimization inspired by imperialistic competition. IEEE Congress on Evolutionary Computation, 4661-4667.
    • (2007) IEEE Congress on Evolutionary Computation , pp. 4661-4667
    • Atashpaz-Gargari, E.1    Lucas, C.2
  • 4
    • 0041810535 scopus 로고    scopus 로고
    • Minimizing the weighted number of tardy jobs on a two-machine flowshop
    • Bulfin, R.L. and M'Hallah, R., 2003. Minimizing the weighted number of tardy jobs on a two-machine flowshop. Computers & Operations Research, 30 (12), 1887-1900.
    • (2003) Computers & Operations Research , vol.30 , Issue.12 , pp. 1887-1900
    • Bulfin, R.L.1    M'Hallah, R.2
  • 5
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job and m-machine sequencing problem
    • Campbell, H.G., Dudek, R.A., and Smith, M.L., 1970. A heuristic algorithm for the n-job and m-machine sequencing problem. Management Science, 16 (10), 630-637.
    • (1970) Management Science , vol.16 , Issue.10 , pp. 630-637
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 6
    • 53349129893 scopus 로고    scopus 로고
    • Bottleneck-based heuristic to minimize tardy jobs in flexible flow line with unrelated parallel machines
    • Chen, C.L. and Chen, C.L., 2008. Bottleneck-based heuristic to minimize tardy jobs in flexible flow line with unrelated parallel machines. International Journal of Production Research, 46 (22), 6415-6430.
    • (2008) International Journal of Production Research , vol.46 , Issue.22 , pp. 6415-6430
    • Chen, C.L.1    Chen, C.L.2
  • 11
    • 0024303819 scopus 로고
    • A branch and bound algorithm to minimize the number of late jobs in a permutation flowshop
    • Hariri, A.M.A. and Potts, C.N., 1989. A branch and bound algorithm to minimize the number of late jobs in a permutation flowshop. European Journal of Operational Research, 38 (2), 228-237.
    • (1989) European Journal of Operational Research , vol.38 , Issue.2 , pp. 228-237
    • Hariri, A.M.A.1    Potts, C.N.2
  • 12
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • Johnson, S.M., 1954. Optimal two-and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1 (1), 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 15
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late
    • Moore, J.M., 1968. An n job, one machine sequencing algorithm for minimizing the number of late. Management Science, 15, 102-109.
    • (1968) Management Science , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 18
    • 69549091707 scopus 로고    scopus 로고
    • Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
    • Ruiz-Torresa, A.J., Ablanedo-Rosasb, J.H., and Ho, J.C., 2010. Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility. Computers & Operations Research, 37 (2), 282-291.
    • (2010) Computers & Operations Research , vol.37 , Issue.2 , pp. 282-291
    • Ruiz-Torresa, A.J.1    Ablanedo-Rosasb, J.H.2    Ho, J.C.3
  • 19
    • 68249091110 scopus 로고    scopus 로고
    • Total flowtime minimization in a flowshop sequence-dependent group scheduling problem
    • Salmasi, N., Logendran, R., and Skandari, M.R., 2010. Total flowtime minimization in a flowshop sequence-dependent group scheduling problem. Computers & Operations Research, 37 (1), 199-212.
    • (2010) Computers & Operations Research , vol.37 , Issue.1 , pp. 199-212
    • Salmasi, N.1    Logendran, R.2    Skandari, M.R.3
  • 20
    • 0037449230 scopus 로고    scopus 로고
    • Minimizing due date related performance measures on two batch processing machines
    • Sung, C.S. and Kim, Y.H., 2003. Minimizing due date related performance measures on two batch processing machines. European Journal of Operational Research, 147 (3), 644-656.
    • (2003) European Journal of Operational Research , vol.147 , Issue.3 , pp. 644-656
    • Sung, C.S.1    Kim, Y.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.