-
2
-
-
0027560273
-
Minimizing total completion time on a batch processing machine with job families
-
Chandru V., Lee C.Y., Uzsoy R. Minimizing total completion time on a batch processing machine with job families. Operations Research Letters. 13:1993;61-65.
-
(1993)
Operations Research Letters
, vol.13
, pp. 61-65
-
-
Chandru, V.1
Lee, C.Y.2
Uzsoy, R.3
-
5
-
-
0031270468
-
Scheduling semiconductor burn-in operations to minimize total flowtime
-
Hochbaum D.S., Landy D. Scheduling semiconductor burn-in operations to minimize total flowtime. Operations Research. 45:1997;874-885.
-
(1997)
Operations Research
, vol.45
, pp. 874-885
-
-
Hochbaum, D.S.1
Landy, D.2
-
6
-
-
38149058172
-
Scheduling algorithms for a single batch processing machine
-
Ikura Y., Gimple M. Scheduling algorithms for a single batch processing machine. Operations Research Letters. 5:1986;61-65.
-
(1986)
Operations Research Letters
, vol.5
, pp. 61-65
-
-
Ikura, Y.1
Gimple, M.2
-
7
-
-
0026898494
-
Efficient algorithms for scheduling semiconductor burn-in operations
-
Lee C.Y., Uzsoy R., Martin-Vega L.A. Efficient algorithms for scheduling semiconductor burn-in operations. Operations Research. 40:1992;764-775.
-
(1992)
Operations Research
, vol.40
, pp. 764-775
-
-
Lee, C.Y.1
Uzsoy, R.2
Martin-Vega, L.A.3
-
8
-
-
0031077278
-
Scheduling with agreeable release times and due dates on a batch processing machine
-
Li C.L., Lee C.Y. Scheduling with agreeable release times and due dates on a batch processing machine. European Journal of Operational Research. 96:1997;564-569.
-
(1997)
European Journal of Operational Research
, vol.96
, pp. 564-569
-
-
Li, C.L.1
Lee, C.Y.2
-
9
-
-
0032003105
-
Minimizing total tardiness on a batch processing machine with incompatible job families
-
Mehta S.V., Uzsoy R. Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions. 30:1998;165-178.
-
(1998)
IIE Transactions
, vol.30
, pp. 165-178
-
-
Mehta, S.V.1
Uzsoy, R.2
-
10
-
-
0031340163
-
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed
-
Sung C.S., Yoon S.H. Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed. Engineering Optimization. 28:1997;231-243.
-
(1997)
Engineering Optimization
, vol.28
, pp. 231-243
-
-
Sung, C.S.1
Yoon, S.H.2
-
11
-
-
0028461472
-
Scheduling a single batch processing machine with non-identical job sizes
-
Uzsoy R. Scheduling a single batch processing machine with non-identical job sizes. International Journal of Production Research. 32:1994;1615-1635.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1615-1635
-
-
Uzsoy, R.1
-
12
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry - Part I: System characteristics, performance evaluation and production planning
-
Uzsoy R., Lee C.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry. - Part I: System characteristics, performance evaluation and production planning IIE Transaction on Scheduling and Logistics. 24:1992;47-61.
-
(1992)
IIE Transaction on Scheduling and Logistics
, vol.24
, pp. 47-61
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
13
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
Webster S., Baker K.R. Scheduling groups of jobs on a single machine. Operations Research. 43:1995;692-703.
-
(1995)
Operations Research
, vol.43
, pp. 692-703
-
-
Webster, S.1
Baker, K.R.2
|