메뉴 건너뛰기




Volumn 46, Issue 22, 2008, Pages 6415-6430

Bottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines

Author keywords

Bottleneck based heuristics; Flexible flow line; Unrelated parallel machines

Indexed keywords

HEURISTIC METHODS; RIVERS;

EID: 53349129893     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701352102     Document Type: Article
Times cited : (13)

References (28)
  • 2
    • 0348167557 scopus 로고    scopus 로고
    • An immune algorithm approach to the scheduling of a flexible PCB flow shop
    • Alisantoso, D., Khoo, L.P. and Jiang, P.Y., An immune algorithm approach to the scheduling of a flexible PCB flow shop. Int. J. Adv. Manufact. Technol., 2003, 22, 819-827.
    • (2003) Int. J. Adv. Manufact. Technol , vol.22 , pp. 819-827
    • Alisantoso, D.1    Khoo, L.P.2    Jiang, P.Y.3
  • 3
    • 0035427769 scopus 로고    scopus 로고
    • A flexible flowshop problem with total flow time minimization
    • Azizoglu, M., Cakmak, E. and Kondakci, S., A flexible flowshop problem with total flow time minimization. Eur. J. Operat. Res., 2001, 132, 528-538.
    • (2001) Eur. J. Operat. Res , vol.132 , pp. 528-538
    • Azizoglu, M.1    Cakmak, E.2    Kondakci, S.3
  • 4
    • 3342903540 scopus 로고    scopus 로고
    • A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
    • Bertel, S. and Billaut, J.C., A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. Eur. J. Oper. Res., 2004, 159, 651-662.
    • (2004) Eur. J. Oper. Res , vol.159 , pp. 651-662
    • Bertel, S.1    Billaut, J.C.2
  • 5
    • 0030194608 scopus 로고    scopus 로고
    • A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
    • Brah, S.A., A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors. Product. Plan. Control, 1996, 7, 362-373.
    • (1996) Product. Plan. Control , vol.7 , pp. 362-373
    • Brah, S.A.1
  • 6
    • 0032295396 scopus 로고    scopus 로고
    • Bottleneck-based group scheduling in a flow line cell
    • Chen, Y.C. and Lee, C.E., Bottleneck-based group scheduling in a flow line cell. Int. J. Indust. Eng. Applic. Pract., 1998, 5, 288-300.
    • (1998) Int. J. Indust. Eng. Applic. Pract , vol.5 , pp. 288-300
    • Chen, Y.C.1    Lee, C.E.2
  • 7
    • 27944484415 scopus 로고    scopus 로고
    • Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
    • Choi, S.W., Kim, Y.D. and Lee, G.C., Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. Int. J. Product. Res., 2005, 43, 2149-2167.
    • (2005) Int. J. Product. Res , vol.43 , pp. 2149-2167
    • Choi, S.W.1    Kim, Y.D.2    Lee, G.C.3
  • 8
    • 27844565551 scopus 로고    scopus 로고
    • Comments on an exposition of multiple constraint scheduling
    • Conway, R., Comments on an exposition of multiple constraint scheduling. Product. Operat. Manage., 1997, 6, 23-24.
    • (1997) Product. Operat. Manage , vol.6 , pp. 23-24
    • Conway, R.1
  • 10
    • 0003710588 scopus 로고
    • North River Press: New York
    • Goldratt, E. and Fox, R., The Race, 1986 (North River Press: New York).
    • (1986) The Race
    • Goldratt, E.1    Fox, R.2
  • 11
    • 0037349155 scopus 로고    scopus 로고
    • Scheduling of drilling operations in printed circuit board factory
    • Hsieh, J.C, Chang, P.C. and Hsu, L.C., Scheduling of drilling operations in printed circuit board factory. Comput. Indust. Eng., 2003, 44, 461-473.
    • (2003) Comput. Indust. Eng , vol.44 , pp. 461-473
    • Hsieh, J.C.1    Chang, P.C.2    Hsu, L.C.3
  • 12
    • 0002505896 scopus 로고
    • Performance of priority rules in a due date flow shop
    • Hunsucker, J.L. and Shah, J.R., Performance of priority rules in a due date flow shop. Omega, 1992, 20, 73-89.
    • (1992) Omega , vol.20 , pp. 73-89
    • Hunsucker, J.L.1    Shah, J.R.2
  • 13
    • 0034286617 scopus 로고    scopus 로고
    • A comparative analysis of two different approaches to scheduling in flexibile flow shops
    • Jayamohan, M.S. and Rajendran, C., A comparative analysis of two different approaches to scheduling in flexibile flow shops. Product. Plan. Control, 2000, 11, 216-230.
    • (2000) Product. Plan. Control , vol.11 , pp. 216-230
    • Jayamohan, M.S.1    Rajendran, C.2
  • 14
    • 10444255675 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops in printed circuit board assembly lines
    • Jin, Z.H., Ohno, K., Ito, T. and Elmaghraby, S.E., Scheduling hybrid flowshops in printed circuit board assembly lines. Product. Operat. Manage., 2002, 11, 216-230.
    • (2002) Product. Operat. Manage , vol.11 , pp. 216-230
    • Jin, Z.H.1    Ohno, K.2    Ito, T.3    Elmaghraby, S.E.4
  • 15
    • 0031144757 scopus 로고    scopus 로고
    • A comparison of sequencing rules in static and dynamic hybrid flow systems
    • Kadipasaoglu, S.N., Xiang, W. and Khumawala, B.M., A comparison of sequencing rules in static and dynamic hybrid flow systems. Int. J. Product. Res., 1997, 35, 1359-1384.
    • (1997) Int. J. Product. Res , vol.35 , pp. 1359-1384
    • Kadipasaoglu, S.N.1    Xiang, W.2    Khumawala, B.M.3
  • 16
    • 0037328729 scopus 로고    scopus 로고
    • Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
    • Kim, D.W., Na, D.G. and Chen, F.F., Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective. Robot. Comput. Integ. Manufact., 2003, 19, 173-181.
    • (2003) Robot. Comput. Integ. Manufact , vol.19 , pp. 173-181
    • Kim, D.W.1    Na, D.G.2    Chen, F.F.3
  • 17
    • 1142268165 scopus 로고    scopus 로고
    • Bottleneck-focused scheduling for a hybrid flowshop
    • Lee, G.C., Kim, Y.D. and Choi, S.W., Bottleneck-focused scheduling for a hybrid flowshop. Int. J. Product. Res., 2004, 42, 165-181.
    • (2004) Int. J. Product. Res , vol.42 , pp. 165-181
    • Lee, G.C.1    Kim, Y.D.2    Choi, S.W.3
  • 18
    • 0141680814 scopus 로고    scopus 로고
    • A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system
    • Lee, G.C., Kim, Y.D., Kim, J.G. and Choi, S.H., A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system. J. Operat. Res. Soc., 2003, 54, 1038-1049.
    • (2003) J. Operat. Res. Soc , vol.54 , pp. 1038-1049
    • Lee, G.C.1    Kim, Y.D.2    Kim, J.G.3    Choi, S.H.4
  • 20
    • 0032599588 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling: A survey
    • Linn, R. and Zhang, W., Hybrid flow shop scheduling: a survey. Comput. Indust. Eng., 1999, 37, 57-61.
    • (1999) Comput. Indust. Eng , vol.37 , pp. 57-61
    • Linn, R.1    Zhang, W.2
  • 21
    • 10644277097 scopus 로고    scopus 로고
    • Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines
    • Low, C.Y., Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines. Comput. Operat. Res., 2005, 32, 2013-2025.
    • (2005) Comput. Operat. Res , vol.32 , pp. 2013-2025
    • Low, C.Y.1
  • 22
    • 0000062028 scopus 로고
    • Sequencing n jobs on one machine to minimize the number of tardy jobs
    • Moore, J.M., Sequencing n jobs on one machine to minimize the number of tardy jobs. Manage. Sci., 1968, 15, 102-109.
    • (1968) Manage. Sci , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 24
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • Ruiz, R. and Maroto, C., A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. Eur. J. Operat. Res., 2006, 169, 781-800.
    • (2006) Eur. J. Operat. Res , vol.169 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 25
    • 0029636121 scopus 로고
    • Global lower bound for flow shops with multiple processors
    • Santos, D.L., Hunsucker, J.L. and Deal, D.E., Global lower bound for flow shops with multiple processors. Eur. J. Operat. Res., 1995, 80, 112-120.
    • (1995) Eur. J. Operat. Res , vol.80 , pp. 112-120
    • Santos, D.L.1    Hunsucker, J.L.2    Deal, D.E.3
  • 26
    • 0037200415 scopus 로고    scopus 로고
    • An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers
    • Sawik, T., An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. Math. Comput. Model., 2002, 36, 461-471.
    • (2002) Math. Comput. Model , vol.36 , pp. 461-471
    • Sawik, T.1
  • 27
    • 5144226254 scopus 로고    scopus 로고
    • Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - a case study
    • Yang, T., Kuo, Y. and Chang, I., Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - a case study. Int. J. Product. Res., 2004, 42, 4015-4030.
    • (2004) Int. J. Product. Res , vol.42 , pp. 4015-4030
    • Yang, T.1    Kuo, Y.2    Chang, I.3
  • 28
    • 0036833157 scopus 로고    scopus 로고
    • Scheduling of unrelated parallel machines: An application to PWB manufacturing
    • Yu, L., Shih, H.M., Pfund, M., Carlyle, W.M. and Fowler, J.W., Scheduling of unrelated parallel machines: an application to PWB manufacturing. HE Trans., 2002, 34, 921-931.
    • (2002) HE Trans , vol.34 , pp. 921-931
    • Yu, L.1    Shih, H.M.2    Pfund, M.3    Carlyle, W.M.4    Fowler, J.W.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.