-
3
-
-
0001641644
-
Modelling information flow during the conceptual and schematic stages of building design
-
Baldwin, A. N., Austin, S. A., Hassan, T. M., and Thorpe, A. (1999). "Modelling information flow during the conceptual and schematic stages of building design." Construction Management and Economics, 17 (2), 155-167.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.2
, pp. 155-167
-
-
Baldwin, A.N.1
Austin, S.A.2
Hassan, T.M.3
Thorpe, A.4
-
7
-
-
0005162379
-
Designing levels for A/E consultant performance measures
-
Chang, A., and Ibbs, C. W. (1999). "Designing levels for A/E consultant performance measures." Project Management Journal, 30 (4), 42-55.
-
(1999)
Project Management Journal
, vol.30
, Issue.4
, pp. 42-55
-
-
Chang, A.1
Ibbs, C.W.2
-
8
-
-
4644250186
-
Information flow in engineering companies: Problems and their causes
-
S. Culley, ed., John Wiley and Sons, Glasgow
-
Eckert, C., Clarkson, J., and Stacey, M. (2001). "Information Flow in Engineering Companies: Problems and Their Causes." International Conference on Engineering Design ICED 01, S. Culley, ed., John Wiley and Sons, Glasgow, 43-50.
-
(2001)
International Conference on Engineering Design ICED 01
, pp. 43-50
-
-
Eckert, C.1
Clarkson, J.2
Stacey, M.3
-
10
-
-
13944273436
-
Developing a protocol for managing the design process in the building industry
-
International Group for Lean Construction, Berkeley, Calif
-
Formoso, C., Tzortzopoulos, P., Jobin, M., and Liedtke, R. (1998). "Developing a protocol for managing the design process in the building industry." Proc., 6th Annual Conf. Int. Group for Lean Construction, International Group for Lean Construction, Berkeley, Calif.
-
(1998)
Proc., 6th Annual Conf. Int. Group for Lean Construction
-
-
Formoso, C.1
Tzortzopoulos, P.2
Jobin, M.3
Liedtke, R.4
-
11
-
-
13944263231
-
Achieving lean design process: Improvement methodology
-
Freire, J., and Alarcon, L. F. (2002). "Achieving Lean Design Process: Improvement Methodology." Journal of Construction Engineering and Management, 128 (3), 248-256.
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 248-256
-
-
Freire, J.1
Alarcon, L.F.2
-
16
-
-
0004573260
-
Fast or concurrent: The art of getting construction improved
-
L. F. and Alarcón, eds., Balkema, Rotterdam, The Netherlands
-
Huovila, P., Koskela, L., and Lautanala, M. (1997). "Fast or concurrent: The art of getting construction improved." Lean construction, L. F. and Alarcón, eds., Balkema, Rotterdam, The Netherlands, 143-159.
-
(1997)
Lean Construction
, pp. 143-159
-
-
Huovila, P.1
Koskela, L.2
Lautanala, M.3
-
18
-
-
4243129314
-
Information flow parameters for managing organizational processes
-
Krovi, R., Chandra, A., and Rajagopalan, B. (2003). "Information Flow Parameters for Managing Organizational Processes." Communications of the ACM, 46 (2), 77-82.
-
(2003)
Communications of the ACM
, vol.46
, Issue.2
, pp. 77-82
-
-
Krovi, R.1
Chandra, A.2
Rajagopalan, B.3
-
19
-
-
0036680986
-
Using systems dynamics to better understand change and rework in construction project management systems
-
Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., and Irani, Z. (2002). "Using systems dynamics to better understand change and rework in construction project management systems." International Journal of Project Management, 20 (6), 425-436.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.6
, pp. 425-436
-
-
Love, P.E.D.1
Holt, G.D.2
Shen, L.Y.3
Li, H.4
Irani, Z.5
-
20
-
-
2142718584
-
Modeling the dynamics of design error induced rework in construction projects
-
Love, P. E. D., Mandal, P., Smith, J., and Li, H. (2000). "Modeling the dynamics of design error induced rework in construction projects." Construction Management and Economics, 18 (5), 567-574.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
21
-
-
0034324948
-
Improving the design process with information management
-
Moreau, K. A., and Back, W. E. (2000). "Improving the design process with information management." Automation in Construction, 10, 127-140.
-
(2000)
Automation in Construction
, vol.10
, pp. 127-140
-
-
Moreau, K.A.1
Back, W.E.2
-
22
-
-
33745656162
-
-
Productivity Press, New York
-
Morgan, J., and Liker, J. K. (2006). The Toyota Product Development System: Integrating People, Process and Technology, Productivity Press, New York.
-
(2006)
The Toyota Product Development System: Integrating People, Process and Technology
-
-
Morgan, J.1
Liker, J.K.2
-
23
-
-
33847752149
-
Resistance based modeling of collaborative design
-
Ostergaard, K. J., and Summers, J. D. (2007). "Resistance Based Modeling of Collaborative Design." Concurrent Engineering, 15 (1), 21-32.
-
(2007)
Concurrent Engineering
, vol.15
, Issue.1
, pp. 21-32
-
-
Ostergaard, K.J.1
Summers, J.D.2
-
24
-
-
84973839922
-
Information management for concurrent engineering: Research issues
-
Prasad, B., Morenc, R. S., and Rangan, R. M. (1993). "Information Management for Concurrent Engineering: Research Issues." Concurrent Engineering, 1 (1), 3-20.
-
(1993)
Concurrent Engineering
, vol.1
, Issue.1
, pp. 3-20
-
-
Prasad, B.1
Morenc, R.S.2
Rangan, R.M.3
-
25
-
-
0019597497
-
The design structure system: A method for managing the design of complex systems
-
Steward, D. V. (1981). "The Design Structure System: A Method for Managing the Design of Complex Systems." IEEE Transactions on Engineering Management, 28, 71-74.
-
(1981)
IEEE Transactions on Engineering Management
, vol.28
, pp. 71-74
-
-
Steward, D.V.1
-
26
-
-
84877600788
-
Measures of information flow for lean design in civil engineering
-
W. Hughes, ed., Taylor and Francis, London, UK, University of Reading
-
Tribelsky, E., and Sacks, R. (2007). "Measures of Information Flow for Lean Design in Civil Engineering." Proceedings of CME25 Construction Management and Economics: Past, Present and Future, W. Hughes, ed., Taylor and Francis, London, UK, University of Reading.
-
(2007)
Proceedings of CME25 Construction Management and Economics: Past, Present and Future
-
-
Tribelsky, E.1
Sacks, R.2
-
27
-
-
77956341184
-
Measuring information flow in the detailed design of construction projects
-
Tribelsky, E., and Sacks, R. (2010). "Measuring information flow in the detailed design of construction projects." Research in Engineering Design.
-
(2010)
Research in Engineering Design
-
-
Tribelsky, E.1
Sacks, R.2
|