메뉴 건너뛰기




Volumn , Issue , 2007, Pages 1493-1504

Measures ofinformation flow for lean design in civil engineering

Author keywords

Design management; Information technology; Lean thinking; Measurement; Project management

Indexed keywords

CONSTRUCTION PROJECT MANAGEMENT; CONSTRUCTION PROJECTS; DATA AND INFORMATION; DESIGN MANAGEMENT; ENGINEERING DESIGN; INFORMATION FLOW GRAPHS; INFORMATION FLOWS; LEAN THINKING;

EID: 84877600788     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (20)
  • 5
    • 0000435058 scopus 로고    scopus 로고
    • Metrics for design projects: A review
    • Bashir, H A and Thomson, V (1999) Metrics for design projects: a review. Design Studies, 20(3), 263-277.
    • (1999) Design Studies , vol.20 , Issue.3 , pp. 263-277
    • Bashir, H.A.1    Thomson, V.2
  • 6
    • 27944479021 scopus 로고    scopus 로고
    • Contract strategy for design management in the design and build system
    • Chan, E H W and Yu, A T W (2005) Contract strategy for design management in the design and build system. International Journal of Project Management, 23(8), 630-639.
    • (2005) International Journal of Project Management , vol.23 , Issue.8 , pp. 630-639
    • Chan, E.H.W.1    Yu, A.T.W.2
  • 7
    • 0002142201 scopus 로고    scopus 로고
    • Development of consultant performance measures for design projects
    • Chang, A S and Ibbs, C W (1998) Development of consultant performance measures for design projects. Project Management Journal, 29(2), 39.
    • (1998) Project Management Journal , vol.29 , Issue.2 , pp. 39
    • Chang, A.S.1    Ibbs, C.W.2
  • 13
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • Josephson, P E and Hammarlund, Y (1999) The causes and costs of defects in construction: a study of seven building projects. Automation in Construction, 8, 681-687.
    • (1999) Automation in Construction , vol.8 , pp. 681-687
    • Josephson, P.E.1    Hammarlund, Y.2
  • 15
    • 2142718584 scopus 로고    scopus 로고
    • Modelling the dynamics of design error induced rework in construction
    • Love, P E D, Mandal, P, Smith, J and Li, H (2000) Modelling the dynamics of design error induced rework in construction. Construction Management & Economics, 18(5), 567-574.
    • (2000) Construction Management & Economics , vol.18 , Issue.5 , pp. 567-574
    • Love, P.E.D.1    Mandal, P.2    Smith, J.3    Li, H.4
  • 17
    • 0038543086 scopus 로고    scopus 로고
    • Process improvements in precast concrete construction using top-down parametric 3-D computer modeling
    • Sacks, R, Eastman, C E and Lee, G (2003) Process improvements in precast concrete construction using top-down parametric 3-D computer modeling. PCI Journal, 47(3), 46-55.
    • (2003) PCI Journal , vol.47 , Issue.3 , pp. 46-55