-
1
-
-
70349156348
-
Tests in contingency tables as regression tests
-
Anatolyev S., Kosenok G. Tests in contingency tables as regression tests. Economics letters 2009, 105:189-192.
-
(2009)
Economics letters
, vol.105
, pp. 189-192
-
-
Anatolyev, S.1
Kosenok, G.2
-
2
-
-
67649397344
-
Variability and reproducibility in software engineering: a study of four companies that developed the same system
-
Anda B.C.D., Sjøberg D.I.K., Mockus A. Variability and reproducibility in software engineering: a study of four companies that developed the same system. IEEE Transactions of Software Engineering 2009, 35(3):409-429.
-
(2009)
IEEE Transactions of Software Engineering
, vol.35
, Issue.3
, pp. 409-429
-
-
Anda, B.C.D.1
Sjøberg, D.I.K.2
Mockus, A.3
-
3
-
-
0023897316
-
Properties of the geometric mean functional relationship
-
Barker F., Soh Y.C., Evans R.J. Properties of the geometric mean functional relationship. Biometrics 1988, 44:279-281.
-
(1988)
Biometrics
, vol.44
, pp. 279-281
-
-
Barker, F.1
Soh, Y.C.2
Evans, R.J.3
-
4
-
-
0021044014
-
An introduction to sample selection bias in sociological data
-
Berk R.A. An introduction to sample selection bias in sociological data. American Sociological Review 1983, 48:386-398.
-
(1983)
American Sociological Review
, vol.48
, pp. 386-398
-
-
Berk, R.A.1
-
5
-
-
45849111054
-
Bias and error in mine project capital cost estimation
-
Bertisen J., Davis G.A. Bias and error in mine project capital cost estimation. Engineering economist 2008, 53(2):118-139.
-
(2008)
Engineering economist
, vol.53
, Issue.2
, pp. 118-139
-
-
Bertisen, J.1
Davis, G.A.2
-
6
-
-
0003038301
-
On the bias caused by regression towards the mean in studying the relation between change and initial value
-
Blomquist N. On the bias caused by regression towards the mean in studying the relation between change and initial value. Journal of clinical peridontology 1986, 13:34-37.
-
(1986)
Journal of clinical peridontology
, vol.13
, pp. 34-37
-
-
Blomquist, N.1
-
7
-
-
0034296720
-
Should observed overconfidence be dismissed as a statistical artifact? Critique of Erev, Wallste, and Budesco (1994)
-
Brenner L. Should observed overconfidence be dismissed as a statistical artifact? Critique of Erev, Wallste, and Budesco (1994). Psychological Review 2000, 107(4):947-949.
-
(2000)
Psychological Review
, vol.107
, Issue.4
, pp. 947-949
-
-
Brenner, L.1
-
9
-
-
0030536752
-
The use and misuse of orthogonal regression in linear errors-in-variables models
-
Carrol R.J., Ruppert D. The use and misuse of orthogonal regression in linear errors-in-variables models. The American Statistician 1996, 50(1):1-6.
-
(1996)
The American Statistician
, vol.50
, Issue.1
, pp. 1-6
-
-
Carrol, R.J.1
Ruppert, D.2
-
10
-
-
29244477248
-
The phantom menace: omitted variable bias in econometric research
-
Clarke K.A. The phantom menace: omitted variable bias in econometric research. Conflict Management and Peace Science 2005, 22:341-352.
-
(2005)
Conflict Management and Peace Science
, vol.22
, pp. 341-352
-
-
Clarke, K.A.1
-
12
-
-
0003647232
-
-
John Wiley & Sons, New York
-
Cronbach L.J., Gleser G.C., Nanda H., Rajaratnam N. The Dependability of Behavioral Measurements: Theory of Generalizability for Scores and Profiles 1972, John Wiley & Sons, New York.
-
(1972)
The Dependability of Behavioral Measurements: Theory of Generalizability for Scores and Profiles
-
-
Cronbach, L.J.1
Gleser, G.C.2
Nanda, H.3
Rajaratnam, N.4
-
15
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
Flyvbjerg B., Skamris Holm M.K., Buhl S.L. What causes cost overrun in transport infrastructure projects?. Transport review 2004, 24(1):3-18.
-
(2004)
Transport review
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Skamris Holm, M.K.2
Buhl, S.L.3
-
19
-
-
0033329854
-
Factors systematically associated with errors in subjective estimates of software development effort: the stability of expert judgment
-
IEEE Computer Society, Boca Raton, Fl
-
Gray A., MacDonell S.G., Shepperd M.J. Factors systematically associated with errors in subjective estimates of software development effort: the stability of expert judgment. IEEE 6th International Metrics Symposium 1999, IEEE Computer Society, Boca Raton, Fl.
-
(1999)
IEEE 6th International Metrics Symposium
-
-
Gray, A.1
MacDonell, S.G.2
Shepperd, M.J.3
-
20
-
-
0004296209
-
-
5th edition, Prentice Hall, New Jersey
-
Greene W. Econometric Analysis 2003, 5th edition, Prentice Hall, New Jersey.
-
(2003)
Econometric Analysis
-
-
Greene, W.1
-
21
-
-
69949094188
-
Overconfidence in absolute and relative performance: the regression hypothesis and Bayesian updating
-
Grieco D., Hogarth R.M. Overconfidence in absolute and relative performance: the regression hypothesis and Bayesian updating. Journal of Economic Psychology 2009, 30:756-771.
-
(2009)
Journal of Economic Psychology
, vol.30
, pp. 756-771
-
-
Grieco, D.1
Hogarth, R.M.2
-
22
-
-
0002617012
-
Estimating the results to scholloing: some econometric problems
-
Griliches Z. Estimating the results to scholloing: some econometric problems. Econometric 1977, 45:1-22.
-
(1977)
Econometric
, vol.45
, pp. 1-22
-
-
Griliches, Z.1
-
23
-
-
34548646952
-
Inconsistency of expert judgment-based estimates of software development effort
-
Grimstad S., Jorgensen M. Inconsistency of expert judgment-based estimates of software development effort. Journal of Systems and Software 2007, 80(11):1770-1777.
-
(2007)
Journal of Systems and Software
, vol.80
, Issue.11
, pp. 1770-1777
-
-
Grimstad, S.1
Jorgensen, M.2
-
24
-
-
79953064682
-
To read two pages, I need 5 minutes, but give me 5 minutes and I will read four: how to change productivity estimates by inverting the question
-
Halkjelsvik T., Jørgensen M., Teigen K.H. To read two pages, I need 5 minutes, but give me 5 minutes and I will read four: how to change productivity estimates by inverting the question. Applied Cognitive Psychology 2001, 25:314-323.
-
(2001)
Applied Cognitive Psychology
, vol.25
, pp. 314-323
-
-
Halkjelsvik, T.1
Jørgensen, M.2
Teigen, K.H.3
-
25
-
-
33947369816
-
How accurately do engineers predict software maintenance tasks?
-
Hatton L. How accurately do engineers predict software maintenance tasks?. IEEE Computer 2007, 40(2):64-69.
-
(2007)
IEEE Computer
, vol.40
, Issue.2
, pp. 64-69
-
-
Hatton, L.1
-
26
-
-
0039740109
-
Mismeasured variables in econometric analysis: problems from the right and problems from the left
-
Hausman J. Mismeasured variables in econometric analysis: problems from the right and problems from the left. Journal of Economic Perspectives 2001, 15(4):57-67.
-
(2001)
Journal of Economic Perspectives
, vol.15
, Issue.4
, pp. 57-67
-
-
Hausman, J.1
-
27
-
-
0003818389
-
-
Holt, Rinehart & Winston, New York
-
Hays W.L. Statistics 1981, Holt, Rinehart & Winston, New York.
-
(1981)
Statistics
-
-
Hays, W.L.1
-
28
-
-
0038931985
-
Function point analysis: evaluation of a software cost estimation model
-
Heemstra F.J., Kusters R.J. Function point analysis: evaluation of a software cost estimation model. European Journal of Information Systems 1991, 1(4):223-237.
-
(1991)
European Journal of Information Systems
, vol.1
, Issue.4
, pp. 223-237
-
-
Heemstra, F.J.1
Kusters, R.J.2
-
31
-
-
0141838535
-
A review of studies on expert estimation of software development effort
-
Jørgensen M. A review of studies on expert estimation of software development effort. Journal of Systems and Software 2004, 70(1-2):37-60.
-
(2004)
Journal of Systems and Software
, vol.70
, Issue.1-2
, pp. 37-60
-
-
Jørgensen, M.1
-
32
-
-
0141924581
-
Software effort estimation by analogy and "regression toward the mean"
-
Jørgensen M., Indahl U., Sjøberg D.I.K. Software effort estimation by analogy and "regression toward the mean". Journal of Systems and Software 2003, 68(3):253-262.
-
(2003)
Journal of Systems and Software
, vol.68
, Issue.3
, pp. 253-262
-
-
Jørgensen, M.1
Indahl, U.2
Sjøberg, D.I.K.3
-
33
-
-
58149417364
-
On the psychology of prediction
-
Kahneman D., Tversky A. On the psychology of prediction. Psychological Review 1973, 80(4):237-251.
-
(1973)
Psychological Review
, vol.80
, Issue.4
, pp. 237-251
-
-
Kahneman, D.1
Tversky, A.2
-
34
-
-
0346579612
-
Regression, structure and functional relationship. Part I
-
Kendall M.G. Regression, structure and functional relationship. Part I. Biometrika 1951, 38(1/2):11-25.
-
(1951)
Biometrika
, vol.38
, Issue.1-2
, pp. 11-25
-
-
Kendall, M.G.1
-
35
-
-
0038044512
-
Iterative and incremental development: a brief history
-
(June)
-
Larman C., Basili V. Iterative and incremental development: a brief history. IEEE Computer 2003, 47-56. (June).
-
(2003)
IEEE Computer
, pp. 47-56
-
-
Larman, C.1
Basili, V.2
-
36
-
-
0032390643
-
Correcting for omitted-variables and measurement-error bias in regression with an application to the effect of lead in IQ
-
Marais M.L., Wecker W.E. Correcting for omitted-variables and measurement-error bias in regression with an application to the effect of lead in IQ. Journal of the American Statistical Association 1998, 93(442):494-505.
-
(1998)
Journal of the American Statistical Association
, vol.93
, Issue.442
, pp. 494-505
-
-
Marais, M.L.1
Wecker, W.E.2
-
37
-
-
14844303750
-
A survey on software estimation in the Norwegian industry
-
IEEE Computer Soc, Chicago, IL, IEEE computer, s
-
Moløkken-Østvold K., Jorgensen M., Tanilkan S.S., Gallis H., Lien A.C., Hove S.E., IEEE computer, s A survey on software estimation in the Norwegian industry. 10th International Symposium on Software Metrics 2004, IEEE Computer Soc, Chicago, IL.
-
(2004)
10th International Symposium on Software Metrics
-
-
Moløkken-Østvold, K.1
Jorgensen, M.2
Tanilkan, S.S.3
Gallis, H.4
Lien, A.C.5
Hove, S.E.6
-
38
-
-
1642538212
-
Cost overruns in road construction - what are their sizes and determinants?
-
Odec J. Cost overruns in road construction - what are their sizes and determinants?. Transport policy 2004, 11:43-53.
-
(2004)
Transport policy
, vol.11
, pp. 43-53
-
-
Odec, J.1
-
39
-
-
0000157224
-
A note on the analysis of repeated measurements of the same subjects
-
Oldham P.D. A note on the analysis of repeated measurements of the same subjects. Journal of chronic diseases 1962, 15:969-977.
-
(1962)
Journal of chronic diseases
, vol.15
, pp. 969-977
-
-
Oldham, P.D.1
-
42
-
-
36049001781
-
The impact of size and volatility on IT project performance
-
Sauer C., Gemino A., Blaize H.R. The impact of size and volatility on IT project performance. Communications of the ACM 2007, 50(11):79-84.
-
(2007)
Communications of the ACM
, vol.50
, Issue.11
, pp. 79-84
-
-
Sauer, C.1
Gemino, A.2
Blaize, H.R.3
-
43
-
-
33644898597
-
The optimizer's curse: skepticism and postdecision surprise in decision analysis
-
Smith J.E., Winkler R.L. The optimizer's curse: skepticism and postdecision surprise in decision analysis. Management Science 2006, 52(3):311-322.
-
(2006)
Management Science
, vol.52
, Issue.3
, pp. 311-322
-
-
Smith, J.E.1
Winkler, R.L.2
-
44
-
-
84865376421
-
-
submitted for publication. The Team Scaling Fallacy: Underestimating The Declining Efficiency of Larger Teams.
-
Staats, B. R., Milkman, K. L. and Fox, C. R. submitted for publication. The Team Scaling Fallacy: Underestimating The Declining Efficiency of Larger Teams.
-
-
-
Staats, B.R.1
Milkman, K.L.2
Fox, C.R.3
-
45
-
-
0031156147
-
Regression towards the mean, historically considered
-
Stiegler S.M. Regression towards the mean, historically considered. Statistical methods in medical research 1997, 6:103-114.
-
(1997)
Statistical methods in medical research
, vol.6
, pp. 103-114
-
-
Stiegler, S.M.1
-
47
-
-
0000886452
-
Use of multiple regression in counseling psychology research: a flexible data-analytic strategy
-
Wampold B.E., Freund R. Use of multiple regression in counseling psychology research: a flexible data-analytic strategy. Journal of counseling psychology 1987, 34(4):372-382.
-
(1987)
Journal of counseling psychology
, vol.34
, Issue.4
, pp. 372-382
-
-
Wampold, B.E.1
Freund, R.2
-
48
-
-
77950653978
-
Reverse regression, collinearity, and employment discrimination
-
Whiteside M.M., Narayanan A. Reverse regression, collinearity, and employment discrimination. Journal of Business & Economic Statistics 1989, 7(3):403-406.
-
(1989)
Journal of Business & Economic Statistics
, vol.7
, Issue.3
, pp. 403-406
-
-
Whiteside, M.M.1
Narayanan, A.2
-
50
-
-
58049193898
-
A study of uncertainty in software cost and its impact on optimal software release time
-
Yang B., Hu H.J., Jia L.X. A study of uncertainty in software cost and its impact on optimal software release time. IEEE Transactions on Software Engineering 2008, 34(6):813-825.
-
(2008)
IEEE Transactions on Software Engineering
, vol.34
, Issue.6
, pp. 813-825
-
-
Yang, B.1
Hu, H.J.2
Jia, L.X.3
-
51
-
-
62949174268
-
A survey on software cost estimation in the Chinese software industry
-
Assoc Computing Machinery, Kaiserslautern, GERMANY, ACM
-
Yang D., Wang Q., Li M.S., Yang Y., Ye K., Du J., ACM A survey on software cost estimation in the Chinese software industry. ACM/IEEE International Symposium on Empirical Software Engineering and Measurement 2008, Assoc Computing Machinery, Kaiserslautern, GERMANY.
-
(2008)
ACM/IEEE International Symposium on Empirical Software Engineering and Measurement
-
-
Yang, D.1
Wang, Q.2
Li, M.S.3
Yang, Y.4
Ye, K.5
Du, J.6
|