Volumn 30, Issue 7, 2012, Pages 839-849

How does project size affect cost estimation error? Statistical artifacts and methodological challenges

Author keywords

Cost estimation; Magnitude bias; Non random samples; Random error; Regression analysis; Statistical artifacts

Indexed keywords

ACTUAL COST; COST ESTIMATIONS; COST OVERRUNS; EMPIRICAL STUDIES; ESTIMATED COSTS; MAGNITUDE BIAS; NON-RANDOM SAMPLES; OBSERVATIONAL STUDY; PROJECT SIZE; STATISTICAL ARTIFACTS;

EID: 84865400212     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2012.01.007     Document Type: Article
Times cited : (32)

References (51)
  • 1
    • 70349156348 scopus 로고    scopus 로고
    • Tests in contingency tables as regression tests
    • Anatolyev S., Kosenok G. Tests in contingency tables as regression tests. Economics letters 2009, 105:189-192.
    • (2009) Economics letters , vol.105 , pp. 189-192
    • Anatolyev, S.1    Kosenok, G.2
  • 2
    • 67649397344 scopus 로고    scopus 로고
    • Variability and reproducibility in software engineering: a study of four companies that developed the same system
    • Anda B.C.D., Sjøberg D.I.K., Mockus A. Variability and reproducibility in software engineering: a study of four companies that developed the same system. IEEE Transactions of Software Engineering 2009, 35(3):409-429.
    • (2009) IEEE Transactions of Software Engineering , vol.35 , Issue.3 , pp. 409-429
    • Anda, B.C.D.1    Sjøberg, D.I.K.2    Mockus, A.3
  • 3
    • 0023897316 scopus 로고
    • Properties of the geometric mean functional relationship
    • Barker F., Soh Y.C., Evans R.J. Properties of the geometric mean functional relationship. Biometrics 1988, 44:279-281.
    • (1988) Biometrics , vol.44 , pp. 279-281
    • Barker, F.1    Soh, Y.C.2    Evans, R.J.3
  • 4
    • 0021044014 scopus 로고
    • An introduction to sample selection bias in sociological data
    • Berk R.A. An introduction to sample selection bias in sociological data. American Sociological Review 1983, 48:386-398.
    • (1983) American Sociological Review , vol.48 , pp. 386-398
    • Berk, R.A.1
  • 5
    • 45849111054 scopus 로고    scopus 로고
    • Bias and error in mine project capital cost estimation
    • Bertisen J., Davis G.A. Bias and error in mine project capital cost estimation. Engineering economist 2008, 53(2):118-139.
    • (2008) Engineering economist , vol.53 , Issue.2 , pp. 118-139
    • Bertisen, J.1    Davis, G.A.2
  • 6
    • 0003038301 scopus 로고
    • On the bias caused by regression towards the mean in studying the relation between change and initial value
    • Blomquist N. On the bias caused by regression towards the mean in studying the relation between change and initial value. Journal of clinical peridontology 1986, 13:34-37.
    • (1986) Journal of clinical peridontology , vol.13 , pp. 34-37
    • Blomquist, N.1
  • 7
    • 0034296720 scopus 로고    scopus 로고
    • Should observed overconfidence be dismissed as a statistical artifact? Critique of Erev, Wallste, and Budesco (1994)
    • Brenner L. Should observed overconfidence be dismissed as a statistical artifact? Critique of Erev, Wallste, and Budesco (1994). Psychological Review 2000, 107(4):947-949.
    • (2000) Psychological Review , vol.107 , Issue.4 , pp. 947-949
    • Brenner, L.1
  • 9
    • 0030536752 scopus 로고    scopus 로고
    • The use and misuse of orthogonal regression in linear errors-in-variables models
    • Carrol R.J., Ruppert D. The use and misuse of orthogonal regression in linear errors-in-variables models. The American Statistician 1996, 50(1):1-6.
    • (1996) The American Statistician , vol.50 , Issue.1 , pp. 1-6
    • Carrol, R.J.1    Ruppert, D.2
  • 10
    • 29244477248 scopus 로고    scopus 로고
    • The phantom menace: omitted variable bias in econometric research
    • Clarke K.A. The phantom menace: omitted variable bias in econometric research. Conflict Management and Peace Science 2005, 22:341-352.
    • (2005) Conflict Management and Peace Science , vol.22 , pp. 341-352
    • Clarke, K.A.1
  • 15
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transport infrastructure projects?
    • Flyvbjerg B., Skamris Holm M.K., Buhl S.L. What causes cost overrun in transport infrastructure projects?. Transport review 2004, 24(1):3-18.
    • (2004) Transport review , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Skamris Holm, M.K.2    Buhl, S.L.3
  • 19
    • 0033329854 scopus 로고    scopus 로고
    • Factors systematically associated with errors in subjective estimates of software development effort: the stability of expert judgment
    • IEEE Computer Society, Boca Raton, Fl
    • Gray A., MacDonell S.G., Shepperd M.J. Factors systematically associated with errors in subjective estimates of software development effort: the stability of expert judgment. IEEE 6th International Metrics Symposium 1999, IEEE Computer Society, Boca Raton, Fl.
    • (1999) IEEE 6th International Metrics Symposium
    • Gray, A.1    MacDonell, S.G.2    Shepperd, M.J.3
  • 20
    • 0004296209 scopus 로고    scopus 로고
    • 5th edition, Prentice Hall, New Jersey
    • Greene W. Econometric Analysis 2003, 5th edition, Prentice Hall, New Jersey.
    • (2003) Econometric Analysis
    • Greene, W.1
  • 21
    • 69949094188 scopus 로고    scopus 로고
    • Overconfidence in absolute and relative performance: the regression hypothesis and Bayesian updating
    • Grieco D., Hogarth R.M. Overconfidence in absolute and relative performance: the regression hypothesis and Bayesian updating. Journal of Economic Psychology 2009, 30:756-771.
    • (2009) Journal of Economic Psychology , vol.30 , pp. 756-771
    • Grieco, D.1    Hogarth, R.M.2
  • 22
    • 0002617012 scopus 로고
    • Estimating the results to scholloing: some econometric problems
    • Griliches Z. Estimating the results to scholloing: some econometric problems. Econometric 1977, 45:1-22.
    • (1977) Econometric , vol.45 , pp. 1-22
    • Griliches, Z.1
  • 23
    • 34548646952 scopus 로고    scopus 로고
    • Inconsistency of expert judgment-based estimates of software development effort
    • Grimstad S., Jorgensen M. Inconsistency of expert judgment-based estimates of software development effort. Journal of Systems and Software 2007, 80(11):1770-1777.
    • (2007) Journal of Systems and Software , vol.80 , Issue.11 , pp. 1770-1777
    • Grimstad, S.1    Jorgensen, M.2
  • 24
    • 79953064682 scopus 로고    scopus 로고
    • To read two pages, I need 5 minutes, but give me 5 minutes and I will read four: how to change productivity estimates by inverting the question
    • Halkjelsvik T., Jørgensen M., Teigen K.H. To read two pages, I need 5 minutes, but give me 5 minutes and I will read four: how to change productivity estimates by inverting the question. Applied Cognitive Psychology 2001, 25:314-323.
    • (2001) Applied Cognitive Psychology , vol.25 , pp. 314-323
    • Halkjelsvik, T.1    Jørgensen, M.2    Teigen, K.H.3
  • 25
    • 33947369816 scopus 로고    scopus 로고
    • How accurately do engineers predict software maintenance tasks?
    • Hatton L. How accurately do engineers predict software maintenance tasks?. IEEE Computer 2007, 40(2):64-69.
    • (2007) IEEE Computer , vol.40 , Issue.2 , pp. 64-69
    • Hatton, L.1
  • 26
    • 0039740109 scopus 로고    scopus 로고
    • Mismeasured variables in econometric analysis: problems from the right and problems from the left
    • Hausman J. Mismeasured variables in econometric analysis: problems from the right and problems from the left. Journal of Economic Perspectives 2001, 15(4):57-67.
    • (2001) Journal of Economic Perspectives , vol.15 , Issue.4 , pp. 57-67
    • Hausman, J.1
  • 27
    • 0003818389 scopus 로고
    • Holt, Rinehart & Winston, New York
    • Hays W.L. Statistics 1981, Holt, Rinehart & Winston, New York.
    • (1981) Statistics
    • Hays, W.L.1
  • 28
    • 0038931985 scopus 로고
    • Function point analysis: evaluation of a software cost estimation model
    • Heemstra F.J., Kusters R.J. Function point analysis: evaluation of a software cost estimation model. European Journal of Information Systems 1991, 1(4):223-237.
    • (1991) European Journal of Information Systems , vol.1 , Issue.4 , pp. 223-237
    • Heemstra, F.J.1    Kusters, R.J.2
  • 30
    • 77955331395 scopus 로고
    • Cost overruns on state of Washington construction contracts
    • (Washington)
    • Hinze J., Selstead G., Mahoney J.P. Cost overruns on state of Washington construction contracts. Transportation Research Record 1992, 87-93. (Washington).
    • (1992) Transportation Research Record , pp. 87-93
    • Hinze, J.1    Selstead, G.2    Mahoney, J.P.3
  • 31
    • 0141838535 scopus 로고    scopus 로고
    • A review of studies on expert estimation of software development effort
    • Jørgensen M. A review of studies on expert estimation of software development effort. Journal of Systems and Software 2004, 70(1-2):37-60.
    • (2004) Journal of Systems and Software , vol.70 , Issue.1-2 , pp. 37-60
    • Jørgensen, M.1
  • 32
    • 0141924581 scopus 로고    scopus 로고
    • Software effort estimation by analogy and "regression toward the mean"
    • Jørgensen M., Indahl U., Sjøberg D.I.K. Software effort estimation by analogy and "regression toward the mean". Journal of Systems and Software 2003, 68(3):253-262.
    • (2003) Journal of Systems and Software , vol.68 , Issue.3 , pp. 253-262
    • Jørgensen, M.1    Indahl, U.2    Sjøberg, D.I.K.3
  • 33
    • 58149417364 scopus 로고
    • On the psychology of prediction
    • Kahneman D., Tversky A. On the psychology of prediction. Psychological Review 1973, 80(4):237-251.
    • (1973) Psychological Review , vol.80 , Issue.4 , pp. 237-251
    • Kahneman, D.1    Tversky, A.2
  • 34
    • 0346579612 scopus 로고
    • Regression, structure and functional relationship. Part I
    • Kendall M.G. Regression, structure and functional relationship. Part I. Biometrika 1951, 38(1/2):11-25.
    • (1951) Biometrika , vol.38 , Issue.1-2 , pp. 11-25
    • Kendall, M.G.1
  • 35
    • 0038044512 scopus 로고    scopus 로고
    • Iterative and incremental development: a brief history
    • (June)
    • Larman C., Basili V. Iterative and incremental development: a brief history. IEEE Computer 2003, 47-56. (June).
    • (2003) IEEE Computer , pp. 47-56
    • Larman, C.1    Basili, V.2
  • 36
    • 0032390643 scopus 로고    scopus 로고
    • Correcting for omitted-variables and measurement-error bias in regression with an application to the effect of lead in IQ
    • Marais M.L., Wecker W.E. Correcting for omitted-variables and measurement-error bias in regression with an application to the effect of lead in IQ. Journal of the American Statistical Association 1998, 93(442):494-505.
    • (1998) Journal of the American Statistical Association , vol.93 , Issue.442 , pp. 494-505
    • Marais, M.L.1    Wecker, W.E.2
  • 38
    • 1642538212 scopus 로고    scopus 로고
    • Cost overruns in road construction - what are their sizes and determinants?
    • Odec J. Cost overruns in road construction - what are their sizes and determinants?. Transport policy 2004, 11:43-53.
    • (2004) Transport policy , vol.11 , pp. 43-53
    • Odec, J.1
  • 39
    • 0000157224 scopus 로고
    • A note on the analysis of repeated measurements of the same subjects
    • Oldham P.D. A note on the analysis of repeated measurements of the same subjects. Journal of chronic diseases 1962, 15:969-977.
    • (1962) Journal of chronic diseases , vol.15 , pp. 969-977
    • Oldham, P.D.1
  • 41
    • 50949104513 scopus 로고    scopus 로고
    • Effect of task length on remembered and predicted duration
    • Roy M.M., Christenfeld N.J.S. Effect of task length on remembered and predicted duration. Psychonomic Bulleting & Review 2008, 15:202-207.
    • (2008) Psychonomic Bulleting & Review , vol.15 , pp. 202-207
    • Roy, M.M.1    Christenfeld, N.J.S.2
  • 42
    • 36049001781 scopus 로고    scopus 로고
    • The impact of size and volatility on IT project performance
    • Sauer C., Gemino A., Blaize H.R. The impact of size and volatility on IT project performance. Communications of the ACM 2007, 50(11):79-84.
    • (2007) Communications of the ACM , vol.50 , Issue.11 , pp. 79-84
    • Sauer, C.1    Gemino, A.2    Blaize, H.R.3
  • 43
    • 33644898597 scopus 로고    scopus 로고
    • The optimizer's curse: skepticism and postdecision surprise in decision analysis
    • Smith J.E., Winkler R.L. The optimizer's curse: skepticism and postdecision surprise in decision analysis. Management Science 2006, 52(3):311-322.
    • (2006) Management Science , vol.52 , Issue.3 , pp. 311-322
    • Smith, J.E.1    Winkler, R.L.2
  • 44
    • 84865376421 scopus 로고    scopus 로고
    • submitted for publication. The Team Scaling Fallacy: Underestimating The Declining Efficiency of Larger Teams.
    • Staats, B. R., Milkman, K. L. and Fox, C. R. submitted for publication. The Team Scaling Fallacy: Underestimating The Declining Efficiency of Larger Teams.
    • Staats, B.R.1    Milkman, K.L.2    Fox, C.R.3
  • 45
    • 0031156147 scopus 로고    scopus 로고
    • Regression towards the mean, historically considered
    • Stiegler S.M. Regression towards the mean, historically considered. Statistical methods in medical research 1997, 6:103-114.
    • (1997) Statistical methods in medical research , vol.6 , pp. 103-114
    • Stiegler, S.M.1
  • 47
    • 0000886452 scopus 로고
    • Use of multiple regression in counseling psychology research: a flexible data-analytic strategy
    • Wampold B.E., Freund R. Use of multiple regression in counseling psychology research: a flexible data-analytic strategy. Journal of counseling psychology 1987, 34(4):372-382.
    • (1987) Journal of counseling psychology , vol.34 , Issue.4 , pp. 372-382
    • Wampold, B.E.1    Freund, R.2
  • 50
    • 58049193898 scopus 로고    scopus 로고
    • A study of uncertainty in software cost and its impact on optimal software release time
    • Yang B., Hu H.J., Jia L.X. A study of uncertainty in software cost and its impact on optimal software release time. IEEE Transactions on Software Engineering 2008, 34(6):813-825.
    • (2008) IEEE Transactions on Software Engineering , vol.34 , Issue.6 , pp. 813-825
    • Yang, B.1    Hu, H.J.2    Jia, L.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.