메뉴 건너뛰기




Volumn 53, Issue 2, 2008, Pages 118-139

Bias and error in mine project capital cost estimation

Author keywords

[No Author keywords available]

Indexed keywords

CAPITAL COST ESTIMATION; CAPITAL COSTS; CONSULTING ENGINEERING; COST OVERRUNS; ESTIMATION ACCURACIES; ESTIMATION BIAS; ESTIMATION ERRORS; FEASIBILITY STUDIES; INTERNATIONAL (CO); LOGNORMAL PROBABILITY; MINING PROJECTS; MONTE CARLO ANALYSIS; PROJECT ECONOMICS; PROJECT FINANCINGS; PROJECT SPONSORS; SECOND PHASE; SMALL SAMPLES;

EID: 45849111054     PISSN: 0013791X     EISSN: 15472701     Source Type: Journal    
DOI: 10.1080/00137910802058533     Document Type: Article
Times cited : (49)

References (24)
  • 3
    • 1842820106 scopus 로고
    • Feasibility studies and other pre project estimates: How reliable are they?
    • eds. R.C. Tinsley, M.E. Emerson, and W.D. Eppler, New York: Society of Mining Engineers of AIME
    • Castle, G.R. (1985) Feasibility studies and other pre project estimates: How reliable are they?, in Finance for the minerals industry, eds. R.C. Tinsley, M.E. Emerson, and W.D. Eppler, New York: Society of Mining Engineers of AIME.
    • (1985) Finance for the minerals industry
    • Castle, G.R.1
  • 4
    • 45849149082 scopus 로고    scopus 로고
    • May 22, 2001, accessed April 24, 2008
    • Ferret (2001) Mining capital scarce, May 22, 2001, http://www.ferret.com. au/articles/ef/0c0037ef.asp, accessed April 24, 2008.
    • (2001) Mining capital scarce
  • 5
    • 45849127806 scopus 로고    scopus 로고
    • Freeport McMoRan (2008) Freeport McMoRan Copper & Gold Inc. reports firstquarter 2008 results, New Release, Freeport McMoRan Copper & Gold Inc., Phoenix, AZ, April 23, 2008.
    • Freeport McMoRan (2008) Freeport McMoRan Copper & Gold Inc. reports firstquarter 2008 results, New Release, Freeport McMoRan Copper & Gold Inc., Phoenix, AZ, April 23, 2008.
  • 7
    • 0012516335 scopus 로고    scopus 로고
    • How have we done? Feasibility performance since 1980
    • ww 41-ww 46
    • Gypton, C. (2002) How have we done? Feasibility performance since 1980. Engineering & Mining Journal, 302(1), ww 41-ww 46.
    • (2002) Engineering & Mining Journal , vol.302 , Issue.1
    • Gypton, C.1
  • 8
    • 0009787828 scopus 로고
    • Systematic errors in cost estimates for public investment projects
    • ed. J. Margolis, New York: Columbia University Press
    • Hufschmidt, M.M. and Gerin, J. (1970) Systematic errors in cost estimates for public investment projects, in The analysis of public output, ed. J. Margolis, New York: Columbia University Press.
    • (1970) The analysis of public output
    • Hufschmidt, M.M.1    Gerin, J.2
  • 10
    • 45849150597 scopus 로고
    • Open pit mine planning and design
    • Rotterdam: A.A. Balkema
    • Hustrulid, W. and Kuchta, M. (1995) Open pit mine planning and design. Vol. 1, Fundamentals, Rotterdam: A.A. Balkema.
    • (1995) Fundamentals , vol.1
    • Hustrulid, W.1    Kuchta, M.2
  • 15
    • 0028530453 scopus 로고
    • Managing capital projects: Where have we been - Where are we going?
    • October
    • Merrow, E.W., and Yarossi, M.E. (1994) Managing capital projects: Where have we been - Where are we going? Chemical Engineering, 10 (October), 108-111.
    • (1994) Chemical Engineering , vol.10 , pp. 108-111
    • Merrow, E.W.1    Yarossi, M.E.2
  • 17
    • 0026475011 scopus 로고
    • A desire named Streetcar: Fantasy and fact in rail transit planning
    • Pickrell, D.H. (1992) A desire named Streetcar: Fantasy and fact in rail transit planning. Journal of the American Planning Association, 58(2), 158-176.
    • (1992) Journal of the American Planning Association , vol.58 , Issue.2 , pp. 158-176
    • Pickrell, D.H.1
  • 19
    • 0027090596 scopus 로고    scopus 로고
    • Project evaluation and uncertainty in practice: A statistical analysis of rate of return divergences of 1,015 World Bank projects
    • Pohl, G. and Mihaljek, D. (2002) Project evaluation and uncertainty in practice: A statistical analysis of rate of return divergences of 1,015 World Bank projects. Wo rld Bank Economic Review, 6(2), 253 277.
    • (2002) Wo rld Bank Economic Review , vol.6 , Issue.2 , pp. 253-277
    • Pohl, G.1    Mihaljek, D.2
  • 20
    • 45849084470 scopus 로고    scopus 로고
    • Using stochastic discounted cash flow and Monte Carlo simulation to analyze the impacts of contingent taxes on mining projects
    • AusIMM, Melbourne, Australia, June 19-20
    • Samis, M.R., Davis, G.A., and Laughton, D.G. (2007) Using stochastic discounted cash flow and Monte Carlo simulation to analyze the impacts of contingent taxes on mining projects. Project Evaluation 2007, AusIMM, Melbourne, Australia, June 19-20, 2007.
    • (2007) Project Evaluation 2007
    • Samis, M.R.1    Davis, G.A.2    Laughton, D.G.3
  • 21
    • 45849086754 scopus 로고    scopus 로고
    • Project development costs - Estimates versus reality. Paper presentedatMineralEconomics and Management Society
    • Houghton, Michigan, April 4-6
    • Thomas, S. (2001) Project development costs - Estimates versus reality. Paper presentedatMineralEconomics and Management Society, Tenth Annual Conference, Houghton, Michigan, April 4-6, 2001.
    • (2001) Tenth Annual Conference
    • Thomas, S.1
  • 22
    • 45849125209 scopus 로고    scopus 로고
    • United Nations Environment Programme. (n.d.) The role of financial institutions in sustainable mineral development, Paris: United Nations Environment Programme, Division of Technology, Industry, and Economics.
    • United Nations Environment Programme. (n.d.) The role of financial institutions in sustainable mineral development, Paris: United Nations Environment Programme, Division of Technology, Industry, and Economics.
  • 23
    • 1642325058 scopus 로고    scopus 로고
    • Vancas, M.F. (2003) Feasibility studies: Just how good are they?, in Hydrometallurgy 2003-Fifth International Conference in honor of Professor Ian Ritchie. 2, Electrometallurgy and environmental hydrometallurgy, eds. C.A. Young, A.M. Alfantazi, C.G. Anderson, D.B. Dreisinger, B. Harris, and A. James, Warrendale, PA.: The Minerals, Metals & Materials Society.
    • Vancas, M.F. (2003) Feasibility studies: Just how good are they?, in Hydrometallurgy 2003-Fifth International Conference in honor of Professor Ian Ritchie. Vol. 2, Electrometallurgy and environmental hydrometallurgy, eds. C.A. Young, A.M. Alfantazi, C.G. Anderson, D.B. Dreisinger, B. Harris, and A. James, Warrendale, PA.: The Minerals, Metals & Materials Society.
  • 24
    • 0026438956 scopus 로고
    • Decision making under risk in the mining industry: A risk appraisal case study
    • ed. A.E. Annels, London: The Geological Society. Special Publication No. 63
    • Walduck, G.P. (1992) Decision making under risk in the mining industry: A risk appraisal case study, in Case histories and methods in mineral resource evaluation, ed. A.E. Annels, London: The Geological Society. Special Publication No. 63.
    • (1992) Case histories and methods in mineral resource evaluation
    • Walduck, G.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.