Volumn 39, Issue 8, 2001, Pages 1603-1623

Finite capacity scheduling method for MRP with lot size restrictions

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; MATHEMATICAL MODELS; PRODUCTION CONTROL; SENSITIVITY ANALYSIS;

EID: 0035918743     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540010023600     Document Type: Article
Times cited : (20)

References (30)
  • 2
  • 3
    • 0002668750 scopus 로고
    • Lot sizing procedures for requirements planning systems: A framework for analysis
    • Berry, W. L., 1972, Lot sizing procedures for requirements planning systems: a framework for analysis. Production and Inventory Management, 13, 19-35.
    • (1972) Production and Inventory Management , vol.13 , pp. 19-35
    • Berry, W.L.1
  • 4
    • 84952189229 scopus 로고
    • Heuristic lot sizing and sequencing rules in a multilevel production inventory system
    • Biggs, J. R., 1979, Heuristic lot sizing and sequencing rules in a multilevel production inventory system. Decision Sciences, 10, 96-115.
    • (1979) Decision Sciences , vol.10 , pp. 96-115
    • Biggs, J.R.1
  • 5
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems
    • Billington, P. J., McClain, J. O. and Thomas, L. J., 1983, Mathematical programming approaches to capacity-constrained MRP systems. Management Science, 29, 1126-1141.
    • (1983) Management Science , vol.29 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 8
    • 0010843539 scopus 로고
    • JIT and MRP-II could make a beautiful music together
    • November
    • Burgan, J. W., 1993, JIT and MRP-II could make a beautiful music together. APICS, November, 25-29.
    • (1993) APICS , pp. 25-29
    • Burgan, J.W.1
  • 9
    • 0001554098 scopus 로고
    • A mathematical programming approach towards optimized master production scheduling
    • Chu, S., 1995, A mathematical programming approach towards optimized master production scheduling. International Journal of Production Economics, 38, 269-279.
    • (1995) International Journal of Production Economics , vol.38 , pp. 269-279
    • Chu, S.1
  • 10
    • 84985807773 scopus 로고
    • An improved heuristic for multilevel lot sizing in materials requirement planning
    • Coleman, B. J. and McKnew, M. A., 1991, An improved heuristic for multilevel lot sizing in materials requirement planning, Decision Sciences, 22.
    • (1991) Decision Sciences , vol.22
    • Coleman, B.J.1    McKnew, M.A.2
  • 12
    • 0030407746 scopus 로고    scopus 로고
    • Assembly management in machine tool manufacturing and the PRISMA-Leitstand
    • Drexl, A. and Kolisch, R., 1996, Assembly management in machine tool manufacturing and the PRISMA-Leitstand. Production and Inventory Management, 37, 55-57.
    • (1996) Production and Inventory Management , vol.37 , pp. 55-57
    • Drexl, A.1    Kolisch, R.2
  • 14
    • 0018544366 scopus 로고
    • Multistage production planning
    • Gabbay, H., 1979, Multistage production planning. Management Science, 25, 1138-1148.
    • (1979) Management Science , vol.25 , pp. 1138-1148
    • Gabbay, H.1
  • 16
    • 0002959778 scopus 로고
    • A heuristic algorithm for capacity sensitive requirements planning
    • Harl, J. A. and Ritzman, L. P., 1985, A heuristic algorithm for capacity sensitive requirements planning. Journal of Operations Management, 5, 309-326.
    • (1985) Journal of Operations Management , vol.5 , pp. 309-326
    • Harl, J.A.1    Ritzman, L.P.2
  • 18
    • 0018723096 scopus 로고
    • Heuristic procedures for the single operation, multilevel loading problem
    • Lambrecht, M. R. and Vanderveken, H. 1979, Heuristic procedures for the single operation, multilevel loading problem. AIIE Transactions, 15, 319-326.
    • (1979) AIIE Transactions , vol.15 , pp. 319-326
    • Lambrecht, M.R.1    Vanderveken, H.2
  • 19
    • 0010844225 scopus 로고    scopus 로고
    • APS is here to stay
    • February
    • Layden, J. 1999, APS is here to stay. Manufacturing Systems, February, 66-68.
    • (1999) Manufacturing Systems , pp. 66-68
    • Layden, J.1
  • 20
    • 0024681413 scopus 로고
    • Efficient solutions to a LP model for production scheduling with capacity constraints and no initial stock
    • McClain, J. O., Thomas, L. J. and Weiss, E. N., 1989, Efficient solutions to a LP model for production scheduling with capacity constraints and no initial stock. IIE Transactions, 21, 144-152.
    • (1989) IIE Transactions , vol.21 , pp. 144-152
    • McClain, J.O.1    Thomas, L.J.2    Weiss, E.N.3
  • 21
    • 0010914520 scopus 로고
    • MRP-3: An MRP-II extension combining finite capacity scheduling and JIT/kanban type shop floor extension
    • Unpublished PhD thesis, Rutgers, State University of New Jersey
    • Nagendra, P. B., 1995, MRP-3: an MRP-II extension combining finite capacity scheduling and JIT/kanban type shop floor extension. Unpublished PhD thesis, Rutgers, State University of New Jersey.
    • (1995)
    • Nagendra, P.B.1
  • 23
    • 0010849526 scopus 로고
    • Planning at Hewlett Packard; April
    • Planning at Hewlett Packard, 1995, Manufacturing Systems, April, 16-18.
    • (1995) Manufacturing Systems , pp. 16-18
  • 25
    • 0030206273 scopus 로고    scopus 로고
    • A capacity-constrained multilevel inventory and production control problem
    • Segerstedt, A., 1996, A capacity-constrained multilevel inventory and production control problem. International Journal of Production Economics, 45, 449-461.
    • (1996) International Journal of Production Economics , vol.45 , pp. 449-461
    • Segerstedt, A.1
  • 26
    • 0002684530 scopus 로고
    • An analysis of alternative policies to achieve schedule stability
    • Sridharan, V. and Laforge, R. L., 1990, An analysis of alternative policies to achieve schedule stability. Journal of Manufacturing and Operations Management, Journal of Manufacturing and Operations Management, 3, 53.
    • (1990) Journal of Manufacturing and Operations Management , vol.3 , pp. 53
    • Sridharan, V.1    Laforge, R.L.2
  • 27
    • 0019247722 scopus 로고
    • Optimal multilevel lot sizing for requirements planning systems
    • Steinberg, E. and Napier, A. H., 1980, Optimal multilevel lot sizing for requirements planning systems. Management Science, 26, 1258-1277.
    • (1980) Management Science , vol.26 , pp. 1258-1277
    • Steinberg, E.1    Napier, A.H.2
  • 28
    • 0010772278 scopus 로고
    • Success runs on schedule
    • 15 August
    • Stevens, T., 1994, Success runs on schedule. Industry Week, 15 August, 83-88.
    • (1994) Industry Week , pp. 83-88
    • Stevens, T.1
  • 29
    • 0004095025 scopus 로고
    • Framework for capacitated MRP
    • Working Papers, Northwestern University
    • Tardif, V., Spearman, M., Coullard, C. and Hopp, W. A., 1993, Framework for capacitated MRP. Working Papers, Northwestern University.
    • (1993)
    • Tardif, V.1    Spearman, M.2    Coullard, C.3    Hopp, W.A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.