-
2
-
-
0001160585
-
PSC: A program to convert FORTRAN to parallel form
-
K. Hwang, ed, New York: IEEE Computer Science Press
-
Allen, J.R. and Kennedy, K., 1984. PSC: a program to convert FORTRAN to parallel form. In: K. Hwang, ed. Supercomputers: design and application. New York: IEEE Computer Science Press, 186-203.
-
(1984)
Supercomputers: Design and application
, pp. 186-203
-
-
Allen, J.R.1
Kennedy, K.2
-
3
-
-
0002917243
-
Blackboard systems
-
Corkill, D.D., 1991. Blackboard systems. Al Expert, 6 (9), 40-47.
-
(1991)
Al Expert
, vol.6
, Issue.9
, pp. 40-47
-
-
Corkill, D.D.1
-
5
-
-
84976736715
-
The Hearsay-II speech understanding system: Integrating knowledge to resolve uncertainty
-
Erman, L.D. et al., 1980. The Hearsay-II speech understanding system: Integrating knowledge to resolve uncertainty. Computing Surveys, 12 (2), 213-253.
-
(1980)
Computing Surveys
, vol.12
, Issue.2
, pp. 213-253
-
-
Erman, L.D.1
-
6
-
-
0013202632
-
Master-worker: An enabling framework for applications on the computational grid*
-
Goux, J. et al., 2001. Master-worker: an enabling framework for applications on the computational grid*. Cluster Computing, 4 (1), 63-70.
-
(2001)
Cluster Computing
, vol.4
, Issue.1
, pp. 63-70
-
-
Goux, J.1
-
7
-
-
0020206915
-
Schedule based MRP: An integrated approach to production scheduling and material requirements planning
-
Hastings, N.A.J., Marshall, P.H., and Willis, R.J., 1982. Schedule based MRP: an integrated approach to production scheduling and material requirements planning. Journal of the Operational Research Society, 33 (11), 1021-1029.
-
(1982)
Journal of the Operational Research Society
, vol.33
, Issue.11
, pp. 1021-1029
-
-
Hastings, N.A.J.1
Marshall, P.H.2
Willis, R.J.3
-
8
-
-
84930019526
-
A simulation of single level MRP lot-sizing heuristics: An analysis of performance by rule
-
Heemsbergen, B.L. and Malstrom, E.M., 1994. A simulation of single level MRP lot-sizing heuristics: an analysis of performance by rule. Production Planning and Control, 5 (4), 381-391.
-
(1994)
Production Planning and Control
, vol.5
, Issue.4
, pp. 381-391
-
-
Heemsbergen, B.L.1
Malstrom, E.M.2
-
9
-
-
0003243695
-
SETI@home - massively distributed computing for SETI
-
Korpela, E. et al., 2001. SETI@home - massively distributed computing for SETI. Computing in Science & Engineering, 3 (1), 78-83.
-
(2001)
Computing in Science & Engineering
, vol.3
, Issue.1
, pp. 78-83
-
-
Korpela, E.1
-
10
-
-
0036468389
-
A taxonomy and survey of grid resource management systems for distributed computing
-
Krauter, K., Buyya, R., and Maheswaran, M., 2002. A taxonomy and survey of grid resource management systems for distributed computing. Software Practice and Experience, 32 (2), 135-164.
-
(2002)
Software Practice and Experience
, vol.32
, Issue.2
, pp. 135-164
-
-
Krauter, K.1
Buyya, R.2
Maheswaran, M.3
-
11
-
-
38349153591
-
Performance improvement study for MRP part explosion in ERP environment
-
Lee, H.-G. et al., 2007. Performance improvement study for MRP part explosion in ERP environment. International Journal of Advanced Manufacturing Technology, 35 (3), 309-324.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.35
, Issue.3
, pp. 309-324
-
-
Lee, H.-G.1
-
13
-
-
0022026068
-
Lead time errors in MRP: The lot-sizing effect
-
Melnyk, S.A. and Piper, C.J., 1985. Lead time errors in MRP: the lot-sizing effect. International Journal of Production Research, 23 (2), 253-264.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.2
, pp. 253-264
-
-
Melnyk, S.A.1
Piper, C.J.2
-
14
-
-
66149101056
-
-
P. San Francisco, CA: Sybex
-
Miller, M., 2001. Discovering P2P. San Francisco, CA: Sybex.
-
(2001)
Discovering
-
-
Miller, M.1
-
15
-
-
0011782944
-
Survey of MRP Nervousness issues
-
Minifie, J.R. and Davis, R.A., 1986. Survey of MRP Nervousness issues. Production and Inventory Management, 27 (3), 111-120.
-
(1986)
Production and Inventory Management
, vol.27
, Issue.3
, pp. 111-120
-
-
Minifie, J.R.1
Davis, R.A.2
-
16
-
-
0035918743
-
Finite capacity scheduling method for MRP with lot size restrictions
-
Nagendra, P.B. and Das, S.K., 2001. Finite capacity scheduling method for MRP with lot size restrictions. International Journal of Production Research, 39 (8), 1603-1623.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.8
, pp. 1603-1623
-
-
Nagendra, P.B.1
Das, S.K.2
-
17
-
-
18744376557
-
A finite capacity material requirements planning system
-
Pandey, P.C., Yenradee, P., and Archariyapruek, S., 2000. A finite capacity material requirements planning system. Production Planning and Control, 11 (2), 113-121.
-
(2000)
Production Planning and Control
, vol.11
, Issue.2
, pp. 113-121
-
-
Pandey, P.C.1
Yenradee, P.2
Archariyapruek, S.3
-
18
-
-
66149155928
-
-
SAP, Waldorf, Germany: SAP AG
-
SAP, 2001. AP215 Supply network planning. Waldorf, Germany: SAP AG.
-
(2001)
AP215 Supply network planning
-
-
-
20
-
-
84990557283
-
A new framework for manufacturing planning and control systems
-
Sum, C.-C. and Hill, A.V., 1993. A new framework for manufacturing planning and control systems. Decision Sciences, 24 (4), 739-760.
-
(1993)
Decision Sciences
, vol.24
, Issue.4
, pp. 739-760
-
-
Sum, C.-C.1
Hill, A.V.2
-
21
-
-
0031126052
-
Integrating MRP and finite capacity planning
-
Taal, M. and Wortmann, J.C., 1997. Integrating MRP and finite capacity planning. Production Planning and Control, 8 (3), 245-254.
-
(1997)
Production Planning and Control
, vol.8
, Issue.3
, pp. 245-254
-
-
Taal, M.1
Wortmann, J.C.2
|