Volumn 44, Issue 1, 2013, Pages 88-98

Decision making of a virtual power plant under uncertainties for bidding in a day-ahead market using point estimate method

Author keywords

Dispatchable load; Distributed energy resources; Point estimate method; Price based unit commitment; Virtual power plant

Indexed keywords

DISPATCHABLE LOAD; DISTRIBUTED ENERGY RESOURCES; POINT ESTIMATE METHOD; PRICE-BASED UNIT COMMITMENTS; VIRTUAL POWER PLANTS;

EID: 84864551241     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2012.07.016     Document Type: Article
Times cited : (215)

References (45)
  • 2
    • 80054903414 scopus 로고    scopus 로고
    • Secretary of the CIRED working group no. 4 on dispersed generation
    • Jenkins N. Secretary of the CIRED working group no. 4 on dispersed generation. Preliminary discussion at CIRED; 1999.
    • (1999) Preliminary Discussion at CIRED
    • Jenkins, N.1
  • 3
    • 81055140103 scopus 로고    scopus 로고
    • A combination of genetic algorithm and particle swarm optimization for optimal DG location and sizing in distribution systems
    • M.H. Moradi, and M. Abedini A combination of genetic algorithm and particle swarm optimization for optimal DG location and sizing in distribution systems Int J Elect Power Energy Syst 34 2012 66 74
    • (2012) Int J Elect Power Energy Syst , vol.34 , pp. 66-74
    • Moradi, M.H.1    Abedini, M.2
  • 4
    • 84860741241 scopus 로고    scopus 로고
    • Two-stage distributed generation optimal sizing with clustering-based node selection
    • F. Rotaru, G. Chicco, G. Grigoras, and G. Cartina Two-stage distributed generation optimal sizing with clustering-based node selection Int J Elect Power Energy Syst 40 2012 120 129
    • (2012) Int J Elect Power Energy Syst , vol.40 , pp. 120-129
    • Rotaru, F.1    Chicco, G.2    Grigoras, G.3    Cartina, G.4
  • 5
    • 77950857970 scopus 로고    scopus 로고
    • A novel optimal distribution system planning framework implementing distributed generation in a deregulated electricity market
    • S. Porkar, P. Poure, A. Abbaspour-Tehrani-fard, and S. Saadate A novel optimal distribution system planning framework implementing distributed generation in a deregulated electricity market Electr Power Syst Res 80 2010 828 837
    • (2010) Electr Power Syst Res , vol.80 , pp. 828-837
    • Porkar, S.1    Poure, P.2    Abbaspour-Tehrani-Fard, A.3    Saadate, S.4
  • 6
    • 76649114329 scopus 로고    scopus 로고
    • Distribution network capacity assessment: Variable DG and active networks
    • L.F. Ochoa, C.J. Dent, and G.P. Harrison Distribution network capacity assessment: variable DG and active networks IEEE Trans Power Syst 25 2010 87 95
    • (2010) IEEE Trans Power Syst , vol.25 , pp. 87-95
    • Ochoa, L.F.1    Dent, C.J.2    Harrison, G.P.3
  • 7
    • 51349166552 scopus 로고    scopus 로고
    • Uncertainties in the design and operation of distributed energy resources: The case of micro-CHP systems
    • M. Houwing, A.N. Ajah, P.W. Heijnen, I. Bouwmans, and P.M. Herder Uncertainties in the design and operation of distributed energy resources: the case of micro-CHP systems Energy 33 2008 1518 1536
    • (2008) Energy , vol.33 , pp. 1518-1536
    • Houwing, M.1    Ajah, A.N.2    Heijnen, P.W.3    Bouwmans, I.4    Herder, P.M.5
  • 8
    • 70350731167 scopus 로고    scopus 로고
    • Disco operation considering DG units and their goodness factors
    • A.A.S. Algarni, and K. Bhattacharya Disco operation considering DG units and their goodness factors IEEE Trans Power Syst 24 2009 1831 1840
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 1831-1840
    • Algarni, A.A.S.1    Bhattacharya, K.2
  • 10
    • 77956338233 scopus 로고    scopus 로고
    • Short-term scheduling and control of active distribution systems with high penetration of renewable resources
    • A. Borghetti, M. Bosetti, S. Grillo, S. Massucco, C.A. Nucci, and M. Paolone Short-term scheduling and control of active distribution systems with high penetration of renewable resources IEEE Syst J 4 2010 313 322
    • (2010) IEEE Syst J , vol.4 , pp. 313-322
    • Borghetti, A.1    Bosetti, M.2    Grillo, S.3    Massucco, S.4    Nucci, C.A.5    Paolone, M.6
  • 11
    • 78650625003 scopus 로고    scopus 로고
    • The impact of wind power plants on slow voltage variations in distribution networks
    • D. Jakus, R. Goic, and J. Krstulovic The impact of wind power plants on slow voltage variations in distribution networks Electr Power Syst Res 81 2011 589 598
    • (2011) Electr Power Syst Res , vol.81 , pp. 589-598
    • Jakus, D.1    Goic, R.2    Krstulovic, J.3
  • 12
    • 79955661132 scopus 로고    scopus 로고
    • A probabilistic multi-objective daily volt/var control at distribution networks including renewable energy sources
    • A.R. Malekpour, and T. Niknam A probabilistic multi-objective daily volt/var control at distribution networks including renewable energy sources Energy 36 2011 3477 3488
    • (2011) Energy , vol.36 , pp. 3477-3488
    • Malekpour, A.R.1    Niknam, T.2
  • 13
    • 77956994288 scopus 로고    scopus 로고
    • Optimal VAR planning considering intermittent wind power using markov model and quantum evolutionary algorithm
    • Y.Y. Hong, and K.L. Pen Optimal VAR planning considering intermittent wind power using markov model and quantum evolutionary algorithm IEEE Trans Power Del 25 2010 2987 2996
    • (2010) IEEE Trans Power Del , vol.25 , pp. 2987-2996
    • Hong, Y.Y.1    Pen, K.L.2
  • 14
    • 33645898325 scopus 로고    scopus 로고
    • Technical and economic aspects of ancillary services markets in the electric power industry: An international comparison
    • R. Raineri, and D. Ríos S, Schiele Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison Energy Policy 34 2006 1540 1555
    • (2006) Energy Policy , vol.34 , pp. 1540-1555
    • Raineri, R.1    Ríos Schiele, S.D.2
  • 15
    • 33947324505 scopus 로고    scopus 로고
    • A survey of frequency and voltage control ancillary services - Part II: Economic features
    • Y.G. Rebours, D.S. Kirschen, M. Trotignon, and S. Rossignol A survey of frequency and voltage control ancillary services - Part II: Economic features IEEE Trans Power Syst 22 2007 358 366
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 358-366
    • Rebours, Y.G.1    Kirschen, D.S.2    Trotignon, M.3    Rossignol, S.4
  • 16
    • 34247502153 scopus 로고    scopus 로고
    • Integrating distributed generation into electric power systems: A review of drivers, challenges and opportunities
    • J.A.P. Lopes, N. Hatziargyriou, J. Mutale, P. Djapic, and N. Jenkins Integrating distributed generation into electric power systems: a review of drivers, challenges and opportunities Electr Power Syst Res 77 2007 1189 1203
    • (2007) Electr Power Syst Res , vol.77 , pp. 1189-1203
    • Lopes, J.A.P.1    Hatziargyriou, N.2    Mutale, J.3    Djapic, P.4    Jenkins, N.5
  • 17
    • 34247468879 scopus 로고    scopus 로고
    • Distributed resources and re-regulated electricity markets
    • T. Ackermann Distributed resources and re-regulated electricity markets Electr Power Syst Res 77 2007 1148 1159
    • (2007) Electr Power Syst Res , vol.77 , pp. 1148-1159
    • Ackermann, T.1
  • 18
    • 79952188152 scopus 로고    scopus 로고
    • Assessing the performance and benefits of customer distributed generation developers under uncertainties
    • M. Zangiabadi, R. Feuillet, H. Lesani, N. Hadj-Said, and J.T. Kvaloy Assessing the performance and benefits of customer distributed generation developers under uncertainties Energy 36 2011 1703 1712
    • (2011) Energy , vol.36 , pp. 1703-1712
    • Zangiabadi, M.1    Feuillet, R.2    Lesani, H.3    Hadj-Said, N.4    Kvaloy, J.T.5
  • 19
    • 79956133930 scopus 로고    scopus 로고
    • Interconnection of decentralized renewable resources into distribution grids: Implications and planning aspects
    • N.G.A. Hemdan, and M. Kurrat Interconnection of decentralized renewable resources into distribution grids: implications and planning aspects Electr Power Syst Res 81 2011 1410 1423
    • (2011) Electr Power Syst Res , vol.81 , pp. 1410-1423
    • Hemdan, N.G.A.1    Kurrat, M.2
  • 20
    • 79956093020 scopus 로고    scopus 로고
    • Wind generation imbalances penalties in day-ahead energy markets: The Italian case
    • C. Brunettoa, and G. Tinab Wind generation imbalances penalties in day-ahead energy markets: the Italian case Electr Power Syst Res 81 2011 1446 1455
    • (2011) Electr Power Syst Res , vol.81 , pp. 1446-1455
    • Brunettoa, C.1    Tinab, G.2
  • 21
    • 77955279506 scopus 로고    scopus 로고
    • Hour-ahead wind power and speed forecasting using simultaneous perturbation stochastic approximation (SPSA) algorithm and neural network with fuzzy inputs
    • Y.Y. Hong, H.L. Chang, and C.S. Chiu Hour-ahead wind power and speed forecasting using simultaneous perturbation stochastic approximation (SPSA) algorithm and neural network with fuzzy inputs Energy 35 2010 3870 3876
    • (2010) Energy , vol.35 , pp. 3870-3876
    • Hong, Y.Y.1    Chang, H.L.2    Chiu, C.S.3
  • 22
    • 79953195581 scopus 로고    scopus 로고
    • Value of wind power at different locations in the grid
    • V. Hamidi, F. Li, and L. Yao Value of wind power at different locations in the grid IEEE Trans Power Del 26 2011 526 537
    • (2011) IEEE Trans Power Del , vol.26 , pp. 526-537
    • Hamidi, V.1    Li, F.2    Yao, L.3
  • 23
    • 78650563887 scopus 로고    scopus 로고
    • Minimizing energy losses: Optimal accommodation and smart operation of renewable distributed generation
    • L.F. Ochoa, and G.P. Harrison Minimizing energy losses: optimal accommodation and smart operation of renewable distributed generation IEEE Trans Power Syst 26 2011 198 205
    • (2011) IEEE Trans Power Syst , vol.26 , pp. 198-205
    • Ochoa, L.F.1    Harrison, G.P.2
  • 24
    • 77956339886 scopus 로고    scopus 로고
    • Optimum allocation of the maximum possible distributed generation penetration in a distribution network
    • G.N. Koutroumpezis, and A.S. Safigianni Optimum allocation of the maximum possible distributed generation penetration in a distribution network Electr Power Syst Res 80 2010 1421 1427
    • (2010) Electr Power Syst Res , vol.80 , pp. 1421-1427
    • Koutroumpezis, G.N.1    Safigianni, A.S.2
  • 25
    • 77954035331 scopus 로고    scopus 로고
    • Study of reconfiguration for the distribution system with distributed generators
    • Y.K. Wu, C.Y. Lee, L.C. Liu, and S.H. Tsai Study of reconfiguration for the distribution system with distributed generators IEEE Trans Power Del 25 2010 1678 1685
    • (2010) IEEE Trans Power Del , vol.25 , pp. 1678-1685
    • Wu, Y.K.1    Lee, C.Y.2    Liu, L.C.3    Tsai, S.H.4
  • 26
    • 33845455565 scopus 로고    scopus 로고
    • Future intelligent power grids: Analysis of the vision in the European Union and the United States
    • D. Coll-Mayora, M. Pagetb, and E. Lightner Future intelligent power grids: analysis of the vision in the European Union and the United States Energy Policy 35 2007 2453 2465
    • (2007) Energy Policy , vol.35 , pp. 2453-2465
    • Coll-Mayora, D.1    Pagetb, M.2    Lightner, E.3
  • 31
    • 69449087491 scopus 로고    scopus 로고
    • Optimal scheduling of a renewable micro-grid in an isolated load area using mixed-integer linear programming
    • H. Morais, P. Kadar, P. Faria, Z.A. Vale, and H.M. Khodr Optimal scheduling of a renewable micro-grid in an isolated load area using mixed-integer linear programming Renew Energy 35 2010 151 156
    • (2010) Renew Energy , vol.35 , pp. 151-156
    • Morais, H.1    Kadar, P.2    Faria, P.3    Vale, Z.A.4    Khodr, H.M.5
  • 32
    • 77649237181 scopus 로고    scopus 로고
    • Decentralised optimisation of cogeneration in virtual power plants
    • B. Wille-Haussmann, T. Erge, and C. Wittwer Decentralised optimisation of cogeneration in virtual power plants Solar Energy 84 2010 604 611
    • (2010) Solar Energy , vol.84 , pp. 604-611
    • Wille-Haussmann, B.1    Erge, T.2    Wittwer, C.3
  • 33
    • 67349173663 scopus 로고    scopus 로고
    • A direct load control model for virtual power plant management
    • N. Ruiz, I. Cobelo, and J. Oyarzabal A direct load control model for virtual power plant management IEEE Trans Power Syst 24 2009 959 966
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 959-966
    • Ruiz, N.1    Cobelo, I.2    Oyarzabal, J.3
  • 34
    • 84983212635 scopus 로고    scopus 로고
    • Optimal operation of dispersed generation under uncertainty using mathematical programming
    • Handschin E, Neise F, Neumann H, Schultz R. Optimal operation of dispersed generation under uncertainty using mathematical programming. In: 15th PSCC; 2005.
    • (2005) 15th PSCC
    • Handschin, E.1    Neise, F.2    Neumann, H.3    Schultz, R.4
  • 35
    • 79955525481 scopus 로고    scopus 로고
    • Bidding strategy of virtual power plant for participating in energy and spinning reserve markets - Part I: Problem formulation
    • E. Mashhour, and S. Moghaddas-Tafreshi Bidding strategy of virtual power plant for participating in energy and spinning reserve markets - Part I: problem formulation IEEE Trans Power Syst 26 2011 949 956
    • (2011) IEEE Trans Power Syst , vol.26 , pp. 949-956
    • Mashhour, E.1    Moghaddas-Tafreshi, S.2
  • 36
    • 79955528313 scopus 로고    scopus 로고
    • Bidding strategy of virtual power plant for participating in energy and spinning reserve markets - Part II: Numerical analysis
    • E. Mashhour, and S. Moghaddas-Tafreshi Bidding strategy of virtual power plant for participating in energy and spinning reserve markets - Part II: numerical analysis IEEE Trans Power Syst 26 2011 957 964
    • (2011) IEEE Trans Power Syst , vol.26 , pp. 957-964
    • Mashhour, E.1    Moghaddas-Tafreshi, S.2
  • 38
    • 76049123905 scopus 로고    scopus 로고
    • Integration of distributed energy resources into low voltage grid: A market-based multiperiod optimization model
    • E. Mashhour, and S. Moghaddas-Tafreshi Integration of distributed energy resources into low voltage grid: a market-based multiperiod optimization model Electr Power Syst Res 80 2010 473 480
    • (2010) Electr Power Syst Res , vol.80 , pp. 473-480
    • Mashhour, E.1    Moghaddas-Tafreshi, S.2
  • 39
    • 36349017867 scopus 로고    scopus 로고
    • Point estimate schemes to solve the probabilistic power flow
    • J.M. Morales, and J. Pérez-Ruiz Point estimate schemes to solve the probabilistic power flow IEEE Trans Power Syst 22 2007 1594 1601
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 1594-1601
    • Morales, J.M.1    Pérez-Ruiz, J.2
  • 40
    • 33646364309 scopus 로고    scopus 로고
    • Nodal pricing for distribution networks: Efficient pricing for efficiency enhancing DG
    • P.M. Sotkiewicz, and J.M. Vignolo Nodal pricing for distribution networks: efficient pricing for efficiency enhancing DG IEEE Trans Power Syst 21 2006 1013 1014
    • (2006) IEEE Trans Power Syst , vol.21 , pp. 1013-1014
    • Sotkiewicz, P.M.1    Vignolo, J.M.2
  • 42
    • 84868646031 scopus 로고    scopus 로고
    • http://www.ee.washington.edu/research/pstca/pf30/pg-tca30bus.htm.
  • 45
    • 84868646028 scopus 로고    scopus 로고
    • GAMS Webpage
    • GAMS Webpage: < http://www.gams.com/ >.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.