메뉴 건너뛰기




Volumn 26, Issue 2, 2011, Pages 949-956

Bidding strategy of virtual power plant for participating in energy and spinning reserve markets-Part I: Problem formulation

Author keywords

Bidding strategy; energy market; spinning reserve market; virtual power plant

Indexed keywords

BIDDING STRATEGY; DISTRIBUTED ENERGY RESOURCE; ENERGY MARKETS; MIXED-INTEGER PROGRAMMING; NETWORK CONSTRAINTS; NONEQUILIBRIUM MODEL; PARAMETERS CHARACTERIZING; PRICE-BASED UNIT COMMITMENTS; PROBLEM FORMULATION; SECURITY CONSTRAINT; SPINNING RESERVE MARKET; SPINNING RESERVE SERVICE; SPINNING RESERVES; SUPPLY-DEMAND; TEMPORAL CONSTRAINTS; VIRTUAL POWER PLANTS;

EID: 79955525481     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2070884     Document Type: Article
Times cited : (491)

References (51)
  • 1
    • 0034548706 scopus 로고    scopus 로고
    • The development of a green certificate market
    • Dec.
    • P. E. Morthorst, "The development of a green certificate market," En-ergy Pol., vol. 28, no. 15, pp. 1085-1094, Dec. 2000.
    • (2000) Energy Pol. , vol.28 , Issue.15 , pp. 1085-1094
    • Morthorst, P.E.1
  • 2
    • 0037955653 scopus 로고    scopus 로고
    • A green certificate market combined with a liber-alisedpower market
    • Oct.
    • P. E. Morthorst, "A green certificate market combined with a liber-alisedpower market,"Energy Pol., vol. 31, no. 13,pp. 1393-1402,Oct. 2000.
    • (2000) Energy Pol. , vol.31 , Issue.13 , pp. 1393-1402
    • Morthorst, P.E.1
  • 3
    • 66349104960 scopus 로고    scopus 로고
    • Market based instruments: Australia's experience with trading renewable energy certificates
    • Copenhagen, Denmark, Oct. 8-10
    • G. Andrews, "Market based instruments: Australia's experience with trading renewable energy certificates," in Proc. Workshop Good Prac-tices in Policies and Measures, Copenhagen, Denmark, Oct. 8-10, 2001.
    • (2001) Proc. Workshop Good Prac-tices in Policies and Measures
    • Andrews, G.1
  • 4
    • 3543052941 scopus 로고    scopus 로고
    • Gains from an integrated market for tradable renewable energy credits
    • DOI 10.1016/j.ecolecon.2004.01.016, PII S0921800904001053
    • P. Mozumder and A. Marathe, "Gain from an integrated market for tradable renewable energy credits," Ecolog. Econ., vol. 49, no. 3, pp. 259-272, Jul. 2004. (Pubitemid 39017373)
    • (2004) Ecological Economics , vol.49 , Issue.3 , pp. 259-272
    • Mozumder, P.1    Marathe, A.2
  • 5
    • 33847223810 scopus 로고    scopus 로고
    • Virtual power plants with combined heat and power micro-units
    • Amsterdam, The Netherlands, Nov. 16-18
    • C. Schulz, G. Roder, and M. Kurrat, "Virtual power plants with combined heat and power micro-units," in Proc. IEEE Int. Conf. Future Power Systems, Amsterdam, The Netherlands, Nov. 16-18, 2005.
    • (2005) Proc. IEEE Int. Conf. Future Power Systems
    • Schulz, C.1    Roder, G.2    Kurrat, M.3
  • 6
    • 84880669616 scopus 로고    scopus 로고
    • Business models for distribution power generation with combined heat and power micro-units
    • Warsaw, Poland, May 24-26
    • C. Schulz, "Business models for distribution power generation with combined heat and power micro-units," in Proc. 3rd Int. Conf. Eur. Electricity Market, Warsaw, Poland, May 24-26, 2006.
    • (2006) Proc. 3rd Int. Conf. Eur. Electricity Market
    • Schulz, C.1
  • 7
    • 10944241527 scopus 로고    scopus 로고
    • The European directive on renewable electricity: Conflicts and compromises
    • DOI 10.1016/j.enpol.2003.10.019, PII S0301421503003215
    • I. H. Rowlands, "The European directive on renewable electricity: Conflicts and compromises," Energy Pol., vol. 33, no. 8, pp. 965-974, May 2005. (Pubitemid 40019852)
    • (2005) Energy Policy , vol.33 , Issue.8 , pp. 965-974
    • Rowlands, I.H.1
  • 8
    • 34548756085 scopus 로고    scopus 로고
    • Transposition of the EU cogeneration directive: A vision for Portugal
    • DOI 10.1016/j.enpol.2007.06.015, PII S030142150700287X
    • N. A. Moreira, E. Monteiro, and S. Ferreira, "Transposition ofthe EU cogeneration directive: A visionfor Portugal,"Energy Pol., vol. 35, no. 11, pp. 5747-5753, Nov. 2007. (Pubitemid 47424046)
    • (2007) Energy Policy , vol.35 , Issue.11 , pp. 5747-5753
    • Moreira, N.A.1    Monteiro, E.2    Ferreira, S.3
  • 9
    • 0035372339 scopus 로고    scopus 로고
    • Renewables portfolio standard: A means for trade with electricity from renewable energy sources?
    • DOI 10.1016/S0301-4215(00)00157-9, PII S0301421500001579
    • S. Espey, "Renewable portfolio standard: A means for trade with electricity fromrenewable energy sources?," Energy Pol., vol. 29, no. 7, pp. 557-566, Jun. 2001. (Pubitemid 32270503)
    • (2001) Energy Policy , vol.29 , Issue.7 , pp. 557-566
    • Espey, S.1
  • 10
    • 0037403810 scopus 로고    scopus 로고
    • The renewables portfolio standard in Texas: An early assessment
    • DOI 10.1016/S0301-4215(02)00095-2, PII S0301421502000952
    • O. Langniss and R. Wiser, "The renewable portfolio standard in Texas: An early assessment," Energy Pol., vol. 31, no. 6, pp. 527-535, May 2003. (Pubitemid 36166839)
    • (2003) Energy Policy , vol.31 , Issue.6 , pp. 527-535
    • Langniss, O.1    Wiser, R.2
  • 11
    • 0034745449 scopus 로고    scopus 로고
    • The renewable portfolio standard: Design considerations and an implementation survey
    • Mar.
    • T. Berry and M. Jaccard, "The renewable portfolio standard: Design considerations and an implementation survey," Energy Pol., vol. 29, no. 4, pp. 263-277, Mar. 2001.
    • (2001) Energy Pol. , vol.29 , Issue.4 , pp. 263-277
    • Berry, T.1    Jaccard, M.2
  • 13
    • 56449126552 scopus 로고    scopus 로고
    • Microgrids and virtual power plants: Concepts to support the integration of distributed energy resources
    • D. Pudjianto, C. Ramsay, and G. Strbac, "Microgrids and virtual power plants: Concepts to support the integration of distributed energy resources,"Proc. IMechE, PartA:J. PowerandEnergy, vol. 222, no. 7, pp. 731-741, 2008.
    • (2008) Proc. IMechE, PartA:J. PowerandEnergy , vol.222 , Issue.7 , pp. 731-741
    • Pudjianto, D.1    Ramsay, C.2    Strbac, G.3
  • 14
    • 34247242204 scopus 로고    scopus 로고
    • Virtual power plant and system integration of distributed energy resources
    • DOI 10.1049/iet-rpg:20060023
    • D. Pudjianto, C. Ramsay, and G. Strbac, "Virtual power plant and system integration of distributed energy resources," IET Proc., Gen., Transm., Distrib., vol. 1, no. 1, pp. 10-16, 2007. (Pubitemid 46610163)
    • (2007) IET Renewable Power Generation , vol.1 , Issue.1 , pp. 10-16
    • Pudjianto, D.1    Ramsay, C.2    Strbac, G.3
  • 18
    • 77950948722 scopus 로고    scopus 로고
    • The virtual power plant: Enabling integration of distributed generation and demand
    • Feb.
    • D. Pudjianto, C. Ramsay, G. Strbac, and M. Durstewitz, "The virtual power plant: Enabling integration of distributed generation and demand," FENIX Bulletin 2, Feb. 2008.
    • (2008) FENIX Bulletin 2
    • Pudjianto, D.1    Ramsay, C.2    Strbac, G.3    Durstewitz, M.4
  • 19
    • 33749985069 scopus 로고    scopus 로고
    • Distributed generation literature review and outline of the Swiss situation
    • Zurich, Germany, Nov.
    • G. Koeppel, "Distributed generation literature review and outline of the Swiss situation," in EEH Power Systems Laboratory, Internal Report, Zurich, Germany, Nov. 2003.
    • (2003) EEH Power Systems Laboratory, Internal Report
    • Koeppel, G.1
  • 22
    • 24944536790 scopus 로고    scopus 로고
    • Operation of a multiagent system for microgrid control
    • DOI 10.1109/TPWRS.2005.852060
    • A. L. Dimeas and N. D. Hatziargyrious, "Operation of a multiagent system for microgrid control," IEEE Trans. PowerSyst., vol. 20, no. 3, pp. 1447-1455, Aug. 2005. (Pubitemid 41300958)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1447-1455
    • Dimeas, A.L.1    Hatziargyriou, N.D.2
  • 24
    • 70449405290 scopus 로고    scopus 로고
    • A review on aggregation approaches of controllable distributed energy units in electrical power systems
    • M. Braun and P. Strauss, "A review on aggregation approaches of controllable distributed energy units in electrical power systems," Int. J. Distrib. Energy Resour., vol. 4, no. 4, pp. 297-319, 2008.
    • (2008) Int. J. Distrib. Energy Resour. , vol.4 , Issue.4 , pp. 297-319
    • Braun, M.1    Strauss, P.2
  • 25
    • 79955535822 scopus 로고    scopus 로고
    • Teknologisk Institute, WP2: System Architecture, No. 2007-1-7816, Fin. Rep., May 2009, Ecogrid.dk Phase 1
    • Teknologisk Institute, WP2: System Architecture, No. 2007-1-7816, Fin. Rep., May 2009, Ecogrid.dk Phase 1.
  • 26
    • 0036872112 scopus 로고    scopus 로고
    • A joint energy and transmission rights auction: Proposal and properties
    • Nov.
    • R. P. O'Neill, U. Helman, B. Hobbs, W. R. Stewart, and M. Rothkopf, "A joint energy and transmission rights auction: Proposal and properties," IEEE Trans. Power Syst., vol. 17, no. 4, pp. 1058-1067, Nov. 2002.
    • (2002) IEEE Trans. Power Syst. , vol.17 , Issue.4 , pp. 1058-1067
    • O'Neill, R.P.1    Helman, U.2    Hobbs, B.3    Stewart, W.R.4    Rothkopf, M.5
  • 27
    • 1442311578 scopus 로고    scopus 로고
    • Pricing energy and ancillary services in integrated market systems by optimal power flow
    • Feb.
    • T. Wu, M. Rothleder, Z. Alywan, and A. D. Papalexopoulos, "Pricing energy and ancillary services in integrated market systems by optimal power flow,"IEEETrans. PowerSyst., vol. 19,no. 1,pp.339-347,Feb. 2004.
    • (2004) IEEETrans. PowerSyst. , vol.19 , Issue.1 , pp. 339-347
    • Wu, T.1    Rothleder, M.2    Alywan, Z.3    Papalexopoulos, A.D.4
  • 28
    • 34249663247 scopus 로고    scopus 로고
    • Smart meters make smart customers
    • M. Venables, "Smart meters make smart customers," IET Eng. Technol., vol. 2, no. 4, pp. 23-23, 2007.
    • (2007) IET Eng. Technol. , vol.2 , Issue.4 , pp. 23-23
    • Venables, M.1
  • 32
    • 28244493649 scopus 로고    scopus 로고
    • A distribution company energy acquisition market model with integration of distributed generation and load curtailment options
    • DOI 10.1109/TPWRS.2005.857284
    • R. Palma-Behnke, J. L. Cerda, and A. Jofre, "A distribution company energy acquisition market model with integration of distributed generation and load curtailment options," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1718-1727, Nov. 2005. (Pubitemid 41700524)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 1718-1727
    • Palma-Behnke, R.1    Cerda, J.L.A.2    Vargas, L.S.3    Jofre, A.4
  • 33
    • 78650123310 scopus 로고    scopus 로고
    • Mathematical modeling of electrochemical storage for incorporation in methods to optimize the operational planning of an interconnected micro grid
    • Sep.
    • E. Mashhour and S. M. Moghaddas-Tafreshi, "Mathematical modeling of electrochemical storage for incorporation in methods to optimize the operational planning of an interconnected micro grid," J. Zhejiang Univ. SCIENCE C (Computer and Electronics), vol. 11, no. 4, pp. 737-750, Sep. 2010.
    • (2010) J. Zhejiang Univ. SCIENCE C (Computer and Electronics) , vol.11 , Issue.4 , pp. 737-750
    • Mashhour, E.1    Moghaddas-Tafreshi, S.M.2
  • 34
    • 0038639656 scopus 로고    scopus 로고
    • Strategic bidding in competitive electricity market: A literature survey
    • Seattle, WA, Jul. 16-20
    • A. David and F. Wen, "Strategic bidding in competitive electricity market: A literature survey," in Proc. IEEE Power Eng. Society Summer Meeting, Seattle, WA, Jul. 16-20, 2000.
    • (2000) Proc. IEEE Power Eng. Society Summer Meeting
    • David, A.1    Wen, F.2
  • 35
    • 0035505626 scopus 로고    scopus 로고
    • A continuous strategy game for power transactions analysis in competitive electricity markets
    • DOI 10.1109/59.962436, PII S0885895001094433
    • J. B. Park, B. H. Kim, M. H. Jung, and J. K. Park, "A continues strategy game for power transactions analysis in competitive electricity markets,"IEEETrans. PowerSyst., vol. 16, no. 4,pp. 847-855, Nov. 2001. (Pubitemid 33106136)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 847-855
    • Park, J.-B.1    Kim, B.H.2    Kim, J.-H.3    Jung, M.-H.4    Park, J.-K.5
  • 36
    • 0032002788 scopus 로고    scopus 로고
    • Application of games with incomplete information for pricing electricity in deregulated power pools
    • Feb.
    • R. W. Ferreo, J. F. Rivera, and S. M. Shahidehpour, "Application of games with incomplete information for pricing electricity in deregulated power pools," IEEE Trans. Power Syst., vol. 13, no. 1, pp. 184-189, Feb. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.1 , pp. 184-189
    • Ferreo, R.W.1    Rivera, J.F.2    Shahidehpour, S.M.3
  • 37
    • 0035340070 scopus 로고    scopus 로고
    • Linear complementarity models of nash-Cournot competition in bilateral and POOLCO power markets
    • DOI 10.1109/59.918286, PII S0885895001037816
    • B. F. Hobbs, "Linear complementarity models of nash-Cournot competition in bilateral and POOLCO power markets," IEEE Trans. Power Syst., vol. 16, no. 2, pp. 194-202, May 2001. (Pubitemid 32444276)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.2 , pp. 194-202
    • Hobbs, B.F.1
  • 38
    • 0036474342 scopus 로고    scopus 로고
    • Nash equilibrium bidding strategies in a bilateral electricity market
    • DOI 10.1109/59.982195, PII S0885895002007794
    • H. Song, C.-C. Liu, and J. Lawarree, "Nash equilibrium bidding strategy in an energy brokerage," IEEE Trans. PowerSyst., vol. 17, pp. 73-79, Feb. 2001. (Pubitemid 34255073)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.1 , pp. 73-79
    • Song, H.1    Liu, C.-C.2    Lawarree, J.3
  • 39
    • 18944390925 scopus 로고    scopus 로고
    • Risk-constrained FTR bidding strategy in transmission markets
    • DOI 10.1109/TPWRS.2005.846052
    • T. Li and M. Shahidehpour, "Risk-constrained FTR bidding strategy in transmission markets," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 1014-1021, May 2005. (Pubitemid 40699733)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 1014-1021
    • Li, T.1    Shahidehpour, M.2
  • 40
    • 24944492165 scopus 로고    scopus 로고
    • Gaming strategy for electric power with random demand
    • DOI 10.1109/TPWRS.2005.851954
    • P. Couchman, B. Kouvaritakis, M. Cannon, and F. Prashad, "Gaming strategy for electric power with random demand," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1283-1292, Aug. 2005. (Pubitemid 41300940)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1283-1292
    • Couchman, P.1    Kouvaritakis, B.2    Cannon, M.3    Prashad, F.4
  • 41
    • 33947322521 scopus 로고    scopus 로고
    • Risk-Constrainedbiddingstrategy with stochastic unit commitment
    • Feb.
    • T.Li, M. Shahidehpour, andZ.Li, "Risk-Constrainedbiddingstrategy with stochastic unit commitment," IEEE Trans. Power Syst., vol. 22, no. 1, pp. 449-458, Feb. 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , Issue.1 , pp. 449-458
    • Li, T.1    Shahidehpour, M.2    Li, Z.3
  • 42
    • 77950858509 scopus 로고    scopus 로고
    • Stochastic multiobjective self-scheduling of a power producer in joint energy and reserves markets
    • Jul.
    • V. Vahidianasab and S. Jadid, "Stochastic multiobjective self-scheduling of a power producer in joint energy and reserves markets," Elect. Power Syst. Res., vol. 80, no. 7, pp. 760-769, Jul. 2010.
    • (2010) Elect. Power Syst. Res. , vol.80 , Issue.7 , pp. 760-769
    • Vahidianasab, V.1    Jadid, S.2
  • 45
    • 34447114634 scopus 로고    scopus 로고
    • Fundamental design issues in markets for ancillary services
    • Jul.
    • Y. Rebours, D. Kirschen, and M. Trotignon, "Fundamental design issues in markets for ancillary services," Electric. J., vol. 20, no. 6, pp. 26-34, Jul. 2007.
    • (2007) Electric. J. , vol.20 , Issue.6 , pp. 26-34
    • Rebours, Y.1    Kirschen, D.2    Trotignon, M.3
  • 47
    • 0030123658 scopus 로고    scopus 로고
    • Solving the unit commitment problem with a genetic algorithm through a constraint satisfaction technique
    • Apr.
    • P. C. Yang, H. T. Yang, and C. L. Huang, "Solving the unit commitment problem with a genetic algorithm through a constraint satisfaction technique," Elect. PowerSyst. Res., vol. 37, no. 1, pp. 55-65, Apr. 1996.
    • (1996) Elect. PowerSyst. Res. , vol.37 , Issue.1 , pp. 55-65
    • Yang, P.C.1    Yang, H.T.2    Huang, C.L.3
  • 48
    • 0036474326 scopus 로고    scopus 로고
    • Unit commitment solution methodology using genetic algorithm
    • DOI 10.1109/59.982197, PII S0885895002007800
    • K. S. Swarup and S. Yamashiro, "Unit commitment solution methodology using genetic algorithm," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 87-91, Feb. 2002. (Pubitemid 34255075)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.1 , pp. 87-91
    • Swarup, K.S.1    Yamashiro, S.2
  • 50
    • 76049123905 scopus 로고    scopus 로고
    • Integration of distributed energy resources into low voltage grid: A market-based multiperiod optimization model
    • Apr.
    • E. Mashhour and S. M. Moghaddas-Tafreshi, "Integration of distributed energy resources into low voltage grid: A market-based multiperiod optimization model," Elect. Power Syst. Res., vol. 80, no. 4, pp. 473-480, Apr. 2010.
    • (2010) Elect. Power Syst. Res. , vol.80 , Issue.4 , pp. 473-480
    • Mashhour, E.1    Moghaddas-Tafreshi, S.M.2
  • 51
    • 59549106343 scopus 로고    scopus 로고
    • Distributed generation modeling for power flow studies and a three-phase unbalanced power flow solution for radial distribution systems considering distributed generation
    • Apr.
    • S. M. Moghaddas-Tafreshi and E. Mashhour, "Distributed generation modeling for power flow studies and a three-phase unbalanced power flow solution for radial distribution systems considering distributed generation," Elect. Power Syst. Res., vol. 79, no. 4, pp. 680-686, Apr. 2009.
    • (2009) Elect. Power Syst. Res. , vol.79 , Issue.4 , pp. 680-686
    • Moghaddas-Tafreshi, S.M.1    Mashhour, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.