-
1
-
-
1142263550
-
-
MSc Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Canada
-
Alshibani, A (1999) A computerized cost and schedule control system for construction projects, MSc Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Canada.
-
(1999)
A Computerized Cost and Schedule Control System for Construction Projects
-
-
Alshibani, A.1
-
2
-
-
14744304229
-
Performance measurement in construction
-
Bassioni, A, Price, A and Hassan, M (2004) Performance measurement in construction. Journal of Management in Engineering, 20(2), 42-50.
-
(2004)
Journal of Management in Engineering
, vol.20
, Issue.2
, pp. 42-50
-
-
Bassioni, A.1
Price, A.2
Hassan, M.3
-
3
-
-
0023384570
-
Microprocessor-aided equipment proves productive and reliable
-
Chironis, P (1987) Microprocessor-aided equipment proves productive and reliable. Coal Age, 92(7), 48-56.
-
(1987)
Coal Age
, vol.92
, Issue.7
, pp. 48-56
-
-
Chironis, P.1
-
4
-
-
84863738012
-
Performance measurement for selected acquisitions
-
Department of Defence (DOD) 7000.2
-
Department of Defence (DOD) (1967) Performance measurement for selected acquisitions. Department of Defence Instruction (DODI) 7000.2.
-
(1967)
Department of Defence Instruction (DODI)
-
-
-
5
-
-
0026840652
-
An algorithm for tracking labour cost
-
Eldin, N N and Hughes, R K (1992) An algorithm for tracking labour cost. Cost Engineering, 34(4), 17-23.
-
(1992)
Cost Engineering
, vol.34
, Issue.4
, pp. 17-23
-
-
Eldin, N.N.1
Hughes, R.K.2
-
6
-
-
13944254406
-
Probabilistic forecasting of project performance using stochastic S-curves
-
Gabriel, A, Barraza, M, Edward, A and Fernando, M (2004) Probabilistic forecasting of project performance using stochastic S-curves. Journal of Construction Engineering and Management, 130(1), 25-32.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 25-32
-
-
Gabriel, A.1
Barraza, M.2
Edward, A.3
Fernando, M.4
-
7
-
-
13944272022
-
-
PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec
-
Hassanien, A (2002) Planning and scheduling highway construction using GIS and dynamic programming, PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montreal, Quebec.
-
(2002)
Planning and Scheduling Highway Construction Using GIS and Dynamic Programming
-
-
Hassanien, A.1
-
8
-
-
25444449848
-
Reduction of short-interval GPS data for construction operations analysis
-
John, H, Michael, V and Julio, M (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), 920-7.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.8
, pp. 920-927
-
-
John, H.1
Michael, V.2
Julio, M.3
-
10
-
-
0030378670
-
Techniques for preventing accidental damage to pipelines
-
New York, ASME
-
Lothon, A and Akel, S (1996) Techniques for preventing accidental damage to pipelines. In: Proceedings of the 1st International Pipeline Conference, New York, ASME, Vol. 2, 643-50.
-
(1996)
Proceedings of the 1st International Pipeline Conference
, vol.2
, pp. 643-650
-
-
Lothon, A.1
Akel, S.2
-
11
-
-
84866259756
-
Tracking and control of linear infrastructure projects
-
4-7 June 2003, Moncton, New Brunswick, Canada, NRC 45833
-
Moselhi, O and Hassanien, A (2003) Tracking and control of linear infrastructure projects. In: 5th Construction Specialty Conference of the Canadian Society for Civil Engineering, 4-7 June 2003, Moncton, New Brunswick, Canada, NRC 45833, 141-9.
-
(2003)
5th Construction Specialty Conference of the Canadian Society for Civil Engineering
, pp. 141-149
-
-
Moselhi, O.1
Hassanien, A.2
-
12
-
-
1142306029
-
Web-based integrated project control system
-
Moselhi, O, Li, J and Alkass, S (2004) Web-based integrated project control system. Journal of Construction Management and Economics, 22(1), 35-46.
-
(2004)
Journal of Construction Management and Economics
, vol.22
, Issue.1
, pp. 35-46
-
-
Moselhi, O.1
Li, J.2
Alkass, S.3
-
14
-
-
0031363048
-
Automated monitoring of compaction using GPS
-
5-7 October 1997, Reston, VA, ASCE
-
Oloufa, A, Do, W and Thomas, R (1997) Automated monitoring of compaction using GPS. In: Proceedings of the Construction Congress V, 5-7 October 1997, Reston, VA, ASCE, 1004-11.
-
(1997)
Proceedings of the Construction Congress V
, pp. 1004-1011
-
-
Oloufa, A.1
Do, W.2
Thomas, R.3
|