메뉴 건너뛰기




Volumn 139, Issue 1, 2012, Pages 58-64

Supplier risk management: An economic model of P-chart considered due-date and quality risks

Author keywords

Control chart; keiretsu; Quality management; Supply chain risk management

Indexed keywords

AUTOMOTIVE INDUSTRY; CONTROL CHARTS; ECONOMIC AND SOCIAL EFFECTS; QUALITY CONTROL; QUALITY MANAGEMENT; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS;

EID: 84863202831     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.03.004     Document Type: Article
Times cited : (34)

References (53)
  • 1
    • 0035624475 scopus 로고    scopus 로고
    • Keiretsu, governance, and learning: Case studies in change from the Japanese automotive industry
    • C.L. Ahmadjian, and J.R. Lincoln Keiretsu, governance, and learning: case studies in change from the Japanese automotive industry Organization Science 12 2001 683 701
    • (2001) Organization Science , vol.12 , pp. 683-701
    • Ahmadjian, C.L.1    Lincoln, J.R.2
  • 2
    • 0032484449 scopus 로고    scopus 로고
    • An economic design of variable sampling interval x ̄ control charts
    • D.S. Bai, and M.K. Lee An economic design of variable sampling interval x ̄ control charts International Journal of Production Economics 54 1998 57 64
    • (1998) International Journal of Production Economics , vol.54 , pp. 57-64
    • Bai, D.S.1    Lee, M.K.2
  • 4
    • 1842582547 scopus 로고    scopus 로고
    • Towards a theory of supply chain management: The constructs and measurements
    • I. Chen, and A. Paulraj Towards a theory of supply chain management: the constructs and measurements Journal of Operations Management 22 2 2004 119 150
    • (2004) Journal of Operations Management , vol.22 , Issue.2 , pp. 119-150
    • Chen, I.1    Paulraj, A.2
  • 5
    • 0345376162 scopus 로고    scopus 로고
    • An economic-statistical designed for a VSI x ̄ control chart under non-normality
    • Y.K. Chen An economic-statistical designed for a VSI x ̄ control chart under non-normality The International Journal of Advanced Manufacturing Technology 22 2003 602 610
    • (2003) The International Journal of Advanced Manufacturing Technology , vol.22 , pp. 602-610
    • Chen, Y.K.1
  • 8
    • 0026821241 scopus 로고
    • An SPC models for short production run: Minimizing expected cost
    • S.V. Crowder An SPC models for short production run: minimizing expected cost Technometrics 34 1992 64 73
    • (1992) Technometrics , vol.34 , pp. 64-73
    • Crowder, S.V.1
  • 9
    • 0030104584 scopus 로고    scopus 로고
    • A general model for the optimal economic design of x ̄ charts used to control short or long run processes
    • E. Del Castillo, and D.C. Montgomery A general model for the optimal economic design of x ̄ charts used to control short or long run processes IIE Transactions 28 1996 193 201
    • (1996) IIE Transactions , vol.28 , pp. 193-201
    • Del Castillo, E.1    Montgomery, D.C.2
  • 10
    • 78651443026 scopus 로고
    • The economic design of charts used to maintain current control of a process
    • A.J. Duncan The economic design of charts used to maintain current control of a process Journal of the American Statistical Association 51 1956 228 242
    • (1956) Journal of the American Statistical Association , vol.51 , pp. 228-242
    • Duncan, A.J.1
  • 11
    • 80055055831 scopus 로고    scopus 로고
    • Strategic safety stock placement in supply chain design with due-date based demand
    • K. Funaki Strategic safety stock placement in supply chain design with due-date based demand International Journal of Production Economics 135 2012 4 13
    • (2012) International Journal of Production Economics , vol.135 , pp. 4-13
    • Funaki, K.1
  • 15
    • 19844379817 scopus 로고    scopus 로고
    • An empirical analysis of the effect of supply chain disruptions on long-run stock price performance and equity risk of the firm
    • K. Hendricks, and V. Singhal An empirical analysis of the effect of supply chain disruptions on long-run stock price performance and equity risk of the firm Production and Operations Management 14 2005 25 53
    • (2005) Production and Operations Management , vol.14 , pp. 25-53
    • Hendricks, K.1    Singhal, V.2
  • 16
    • 34247474099 scopus 로고    scopus 로고
    • The efforts to realize the zero defect of auto parts production
    • K. Hoshino The efforts to realize the zero defect of auto parts production Quality Management 8 2002 23 27
    • (2002) Quality Management , vol.8 , pp. 23-27
    • Hoshino, K.1
  • 17
    • 0006223963 scopus 로고
    • Economic design of a joint x ̄ and R chart
    • L.L. Jones, and K.E. Case Economic design of a joint x ̄ and R chart IIE Transactions 13 1981 182 195
    • (1981) IIE Transactions , vol.13 , pp. 182-195
    • Jones, L.L.1    Case, K.E.2
  • 18
    • 26844520363 scopus 로고    scopus 로고
    • Multivariate monitoring using a MEWMA control chart with unequal sample sizes
    • K. Kim, and M.R.,.J.R. Reynolds Multivariate monitoring using a MEWMA control chart with unequal sample sizes International Journal of Production Research 37 2005 267 281
    • (2005) International Journal of Production Research , vol.37 , pp. 267-281
    • Kim, K.1    Reynolds, M.R.J.R.2
  • 21
    • 77955331694 scopus 로고
    • Multivariate exponentially weighted moving average control chart
    • C.A. Lowry, W.H. Woodall, C.W. Champ, and S.E. Rigdon Multivariate exponentially weighted moving average control chart Technometrics 34 1992 46 53
    • (1992) Technometrics , vol.34 , pp. 46-53
    • Lowry, C.A.1    Woodall, W.H.2    Champ, C.W.3    Rigdon, S.E.4
  • 22
    • 29144528794 scopus 로고    scopus 로고
    • A management cycle model: Switching control under lot processing and time span
    • M. Matsui A management cycle model: switching control under lot processing and time span Journal of Japan Industrial Management Association 56 2005 256 264
    • (2005) Journal of Japan Industrial Management Association , vol.56 , pp. 256-264
    • Matsui, M.1
  • 23
    • 84863199920 scopus 로고    scopus 로고
    • Reduction of chronic defects in the last steps of wafer processing
    • in Japanese
    • K. Miyamoto Reduction of chronic defects in the last steps of wafer processing Quality Management 50 5 1999 514 521 in Japanese
    • (1999) Quality Management , vol.50 , Issue.5 , pp. 514-521
    • Miyamoto, K.1
  • 24
    • 61849133946 scopus 로고    scopus 로고
    • Supply chain risk identification with value-focused process engineering
    • D. Neiger, and K. Rotaru Supply chain risk identification with value-focused process engineering Journal of Operations Management 27 2 2009 154 168
    • (2009) Journal of Operations Management , vol.27 , Issue.2 , pp. 154-168
    • Neiger, D.1    Rotaru, K.2
  • 26
    • 61449119853 scopus 로고    scopus 로고
    • Managing disruptions in supply chains: A case study of a retail supply chain
    • A. Oke, and M. Gopalakrishnan Managing disruptions in supply chains: a case study of a retail supply chain International Journal of Production Economics 118 2009 168 174
    • (2009) International Journal of Production Economics , vol.118 , pp. 168-174
    • Oke, A.1    Gopalakrishnan, M.2
  • 27
    • 84946639748 scopus 로고
    • Controlling the standard deviation by cusums and warning lines
    • E.S. Page Controlling the standard deviation by cusums and warning lines Technometrics 5 1963 307 315
    • (1963) Technometrics , vol.5 , pp. 307-315
    • Page, E.S.1
  • 30
    • 59349095808 scopus 로고    scopus 로고
    • Supplier development with benchmarking as part of a comprehensive supplier risk management framework
    • M. Sabine, L. Rainer, and T. Rick Supplier development with benchmarking as part of a comprehensive supplier risk management framework International Journal of Operations & Production Management 29 3 2009 241 267
    • (2009) International Journal of Operations & Production Management , vol.29 , Issue.3 , pp. 241-267
    • Sabine, M.1    Rainer, L.2    Rick, T.3
  • 31
    • 0001635122 scopus 로고
    • Economic statistical design of control charts with an application to x ̄ and R charts
    • E.M. Saniga Economic statistical design of control charts with an application to x ̄ and R charts Technometrics 31 1989 313 320
    • (1989) Technometrics , vol.31 , pp. 313-320
    • Saniga, E.M.1
  • 33
    • 33847354622 scopus 로고    scopus 로고
    • Japanese production management: An evolution - With mixed success
    • R.J. Schonberger Japanese production management: an evolution - with mixed success Journal of Operations Management 25 2007 403 419
    • (2007) Journal of Operations Management , vol.25 , pp. 403-419
    • Schonberger, R.J.1
  • 36
    • 0141632816 scopus 로고    scopus 로고
    • Robustness to non-normality of the multivariate EWMA control chart
    • Z.G. Stoumbos, and J.H. Sullivan Robustness to non-normality of the multivariate EWMA control chart Journal of Quality Technology 34 2002 260 276
    • (2002) Journal of Quality Technology , vol.34 , pp. 260-276
    • Stoumbos, Z.G.1    Sullivan, J.H.2
  • 37
    • 52149121593 scopus 로고    scopus 로고
    • Analysis of a chart design for quality management information system in short delivery time processesFrom the activity of control chart practical applications study group of JSQC
    • Sun, J., 2008. Analysis of a chart design for quality management information system in short delivery time processesFrom the activity of control chart practical applications study group of JSQC, The Proceedings of the 7th World Congress on Intelligent Control and Automation, pp. 4132-4136.
    • (2008) The Proceedings of the 7th World Congress on Intelligent Control and Automation , pp. 4132-4136
    • Sun, J.1
  • 40
    • 33847793125 scopus 로고    scopus 로고
    • Economic models of x ̄ chart with tardiness penalty in finite due time processes
    • in Japanese
    • J. Sun, M. Tsubaki, and M. Matsui Economic models of x ̄ chart with tardiness penalty in finite due time processes Journal of Japan Industrial management Association 57 5 2006 374 387 in Japanese
    • (2006) Journal of Japan Industrial Management Association , vol.57 , Issue.5 , pp. 374-387
    • Sun, J.1    Tsubaki, M.2    Matsui, M.3
  • 42
  • 43
    • 79957646850 scopus 로고    scopus 로고
    • Identifying risk issues and research advancements in supply chain risk management
    • O. Tang, and S.N. Musa Identifying risk issues and research advancements in supply chain risk management International Journal of Production Economics 133 2011 25 34
    • (2011) International Journal of Production Economics , vol.133 , pp. 25-34
    • Tang, O.1    Musa, S.N.2
  • 44
    • 0022662421 scopus 로고
    • The economic design of control charts: A unified approach
    • J.L. Thomas, and C.-.V. Lonnie The economic design of control charts: a unified approach Technometrics 28 1986 3 10
    • (1986) Technometrics , vol.28 , pp. 3-10
    • Thomas, J.L.1    Lonnie -. C, V.2
  • 45
    • 67349277103 scopus 로고    scopus 로고
    • Supply chain risk in turbulent environments - A conceptual model for managing supply chain network risk
    • P. Trkman, and K. McCormack Supply chain risk in turbulent environments - a conceptual model for managing supply chain network risk International Journal of Production Economics 119 2009 247 258
    • (2009) International Journal of Production Economics , vol.119 , pp. 247-258
    • Trkman, P.1    McCormack, K.2
  • 48
    • 78049384841 scopus 로고    scopus 로고
    • A study on limited-cycle scheduling problem with multiple periods
    • H. Yamamoto, J. Sun, and M. Matsui A study on limited-cycle scheduling problem with multiple periods Computer & Industrial Engineering 59 4 2010 675 681
    • (2010) Computer & Industrial Engineering , vol.59 , Issue.4 , pp. 675-681
    • Yamamoto, H.1    Sun, J.2    Matsui, M.3
  • 49
    • 34247523455 scopus 로고    scopus 로고
    • Head for the era of extra-low nonconforming fraction, future quality managementfor single PPM
    • (in Japanese)
    • M. Yamasaki Head for the era of extra-low nonconforming fraction, future quality managementfor single PPM Quality Management 8 2002 8 11 (in Japanese)
    • (2002) Quality Management , vol.8 , pp. 8-11
    • Yamasaki, M.1
  • 51
    • 79955888891 scopus 로고    scopus 로고
    • Cooperation and leadership policies in a serial supply chain
    • Y. Yin, C.G. Liu, and I. Kaku Cooperation and leadership policies in a serial supply chain Journal of Manufacturing Systems 30 2011 1 7
    • (2011) Journal of Manufacturing Systems , vol.30 , pp. 1-7
    • Yin, Y.1    Liu, C.G.2    Kaku, I.3
  • 52
    • 34247524354 scopus 로고    scopus 로고
    • Quality improvement program that aims for zero defect-Yoshikawa [Y] method
    • (in Japanese)
    • H. Yoshikawa Quality improvement program that aims for zero defect-Yoshikawa [Y] method Quality Management 51 7 2000 644 652 (in Japanese)
    • (2000) Quality Management , vol.51 , Issue.7 , pp. 644-652
    • Yoshikawa, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.