-
3
-
-
29144454500
-
-
AIIE-PP & C, Georgia
-
Montgomery, D. C. and Berry, W. L.: Production Planning, Scheduling, and Inventory Control: Concepts, Techniques, and Systems, AIIE-PP & C, Georgia (1974)
-
(1974)
Production Planning, Scheduling, and Inventory Control: Concepts, Techniques, and Systems
-
-
Montgomery, D.C.1
Berry, W.L.2
-
5
-
-
29144435966
-
An introduction to stochastic management and design, Part I: Management problem and structurization, pp. 43-44, Part II: A general management problem and stochastic design
-
Autumn, Japan
-
Matsui, M.: "An Introduction to Stochastic Management and Design, Part I: Management Problem and Structurization, pp. 43-44, Part II: A General Management Problem and Stochastic Design", pp. 62-63, Preprints of Japan Industrial Management Association, Autumn, Japan (1999) (in Japanese)
-
(1999)
Preprints of Japan Industrial Management Association
, pp. 62-63
-
-
Matsui, M.1
-
6
-
-
29144474389
-
I have learned from TQC
-
in Japanese
-
Ikegawa, T.: "I have learned from TQC", Statistical Quality Control, Vol. 36, No. 9, pp. 6-12 (1985) (in Japanese)
-
(1985)
Statistical Quality Control
, vol.36
, Issue.9
, pp. 6-12
-
-
Ikegawa, T.1
-
7
-
-
29144517349
-
A management cycle model: Type of (t, k; T)-switching policy
-
Kanazawa, Japan
-
Matsui, M. and Yamaguchi, T.: "A Management Cycle Model: Type of (t, k; T)-Switching Policy", Proceedings of 2nd Asia-Pacific Conference on Industrial Engineering and Management Systems, Kanazawa, Japan, pp. 381-384 (1999)
-
(1999)
Proceedings of 2nd Asia-Pacific Conference on Industrial Engineering and Management Systems
, pp. 381-384
-
-
Matsui, M.1
Yamaguchi, T.2
-
9
-
-
0025211593
-
Sequencing with Earliness and Tardiness Penalties: A Review
-
Baker, K. R. and Scudder, G. D.: "Sequencing with Earliness and Tardiness Penalties: A Review", Operations Research, Vol. 38, pp. 22-36 (1990)
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
10
-
-
2942618509
-
Time Bucket Length and Lot-Splitting Approach
-
Riezebos, J.: "Time Bucket Length and Lot-Splitting Approach", International Journal of Production Research, Vol. 42, No. 12, pp. 2325-2338 (2004)
-
(2004)
International Journal of Production Research
, vol.42
, Issue.12
, pp. 2325-2338
-
-
Riezebos, J.1
-
11
-
-
0012361557
-
A Management Game Model: Economic Traffic, Leadtime and Princing Setting
-
Matsui, M.: "A Management Game Model: Economic Traffic, Leadtime and Princing Setting", Journal of Japan Industrial Management Association, Vol. 53, No. 1, pp. 1-9 (2002)
-
(2002)
Journal of Japan Industrial Management Association
, vol.53
, Issue.1
, pp. 1-9
-
-
Matsui, M.1
-
14
-
-
33745624273
-
A basic study on a limit-cycle problem with multi-periods and the optimal assignment problem
-
(in press),(in Japanese)
-
Yamamoto, H., Matsui, M. and Liu, J.: "A Basic Study on a Limit-Cycle Problem with Multi-Periods and the Optimal Assignment Problem", Journal of Japan Industrial Management Association (in press) (in Japanese)
-
Journal of Japan Industrial Management Association
-
-
Yamamoto, H.1
Matsui, M.2
Liu, J.3
-
15
-
-
0026859945
-
Push and Pull Production Systems: Issues and Comparisons
-
Spearman, M. L. and Zazanis, M. A.: "Push and Pull Production Systems: Issues and Comparisons", Operations Research, Vol. 40, No. 3, pp. 521-532 (1992)
-
(1992)
Operations Research
, vol.40
, Issue.3
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
16
-
-
29144441321
-
A Comparison in Quality Control Cycle Design of Control Charts between PDCA and CAPD
-
Tokyo, (in Japanese)
-
Sun, J., Tsubaki, M. and Matsui, M.: "A Comparison in Quality Control Cycle Design of Control Charts between PDCA and CAPD", Proceedings on the 71 Research Conference of JSQC (The Japanese Society for Quality Control), Tokyo, pp. 227-230 (2003) (in Japanese)
-
(2003)
Proceedings on the 71 Research Conference of JSQC (The Japanese Society for Quality Control)
, pp. 227-230
-
-
Sun, J.1
Tsubaki, M.2
Matsui, M.3
|