메뉴 건너뛰기




Volumn 56, Issue 4, 2005, Pages 256-264

A management cycle model: Switching control under lot processing and time span

Author keywords

Look ahead back strategy; Management cycle; MRP APS; Switching model; Time span

Indexed keywords

LOOK-AHEAD/BACK STRATEGY; MANAGEMENT CYCLE; MRP/APS; SWITCHING MODELS; TIME SPAN;

EID: 29144528794     PISSN: 13422618     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (21)

References (16)
  • 5
    • 29144435966 scopus 로고    scopus 로고
    • An introduction to stochastic management and design, Part I: Management problem and structurization, pp. 43-44, Part II: A general management problem and stochastic design
    • Autumn, Japan
    • Matsui, M.: "An Introduction to Stochastic Management and Design, Part I: Management Problem and Structurization, pp. 43-44, Part II: A General Management Problem and Stochastic Design", pp. 62-63, Preprints of Japan Industrial Management Association, Autumn, Japan (1999) (in Japanese)
    • (1999) Preprints of Japan Industrial Management Association , pp. 62-63
    • Matsui, M.1
  • 6
    • 29144474389 scopus 로고
    • I have learned from TQC
    • in Japanese
    • Ikegawa, T.: "I have learned from TQC", Statistical Quality Control, Vol. 36, No. 9, pp. 6-12 (1985) (in Japanese)
    • (1985) Statistical Quality Control , vol.36 , Issue.9 , pp. 6-12
    • Ikegawa, T.1
  • 9
    • 0025211593 scopus 로고
    • Sequencing with Earliness and Tardiness Penalties: A Review
    • Baker, K. R. and Scudder, G. D.: "Sequencing with Earliness and Tardiness Penalties: A Review", Operations Research, Vol. 38, pp. 22-36 (1990)
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 10
    • 2942618509 scopus 로고    scopus 로고
    • Time Bucket Length and Lot-Splitting Approach
    • Riezebos, J.: "Time Bucket Length and Lot-Splitting Approach", International Journal of Production Research, Vol. 42, No. 12, pp. 2325-2338 (2004)
    • (2004) International Journal of Production Research , vol.42 , Issue.12 , pp. 2325-2338
    • Riezebos, J.1
  • 11
    • 0012361557 scopus 로고    scopus 로고
    • A Management Game Model: Economic Traffic, Leadtime and Princing Setting
    • Matsui, M.: "A Management Game Model: Economic Traffic, Leadtime and Princing Setting", Journal of Japan Industrial Management Association, Vol. 53, No. 1, pp. 1-9 (2002)
    • (2002) Journal of Japan Industrial Management Association , vol.53 , Issue.1 , pp. 1-9
    • Matsui, M.1
  • 14
    • 33745624273 scopus 로고    scopus 로고
    • A basic study on a limit-cycle problem with multi-periods and the optimal assignment problem
    • (in press),(in Japanese)
    • Yamamoto, H., Matsui, M. and Liu, J.: "A Basic Study on a Limit-Cycle Problem with Multi-Periods and the Optimal Assignment Problem", Journal of Japan Industrial Management Association (in press) (in Japanese)
    • Journal of Japan Industrial Management Association
    • Yamamoto, H.1    Matsui, M.2    Liu, J.3
  • 15
    • 0026859945 scopus 로고
    • Push and Pull Production Systems: Issues and Comparisons
    • Spearman, M. L. and Zazanis, M. A.: "Push and Pull Production Systems: Issues and Comparisons", Operations Research, Vol. 40, No. 3, pp. 521-532 (1992)
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.