메뉴 건너뛰기




Volumn 11, Issue 12, 2010, Pages 933-937

A study of optimal switching problem in limited-cycle with multiple periods

Author keywords

Limited cycle problem; Manufacturing line; Multi period; Optimal switching period; Production seat system

Indexed keywords

EXPECTED COSTS; LIMITED-CYCLE PROBLEM; MANUFACTURING LINES; MULTI-PERIOD; NUMERICAL EXPERIMENTS; OPTIMAL SWITCHING; PROCESSING RATES; PRODUCTION LINE; PRODUCTION PROCESS; SOCIAL SYSTEMS;

EID: 79951838006     PISSN: 1673565X     EISSN: 18621775     Source Type: Journal    
DOI: 10.1631/jzus.A1001062     Document Type: Article
Times cited : (5)

References (13)
  • 1
    • 0037050381 scopus 로고    scopus 로고
    • The origin of Period Batch Control (PBC)
    • DOI 10.1080/00207540110069087
    • Benders, J., 2002. The origin of period batch control (PBC). International Journal of Production Research, 40(1):1-6. [doi:10.1080/ 00207540110069087] (Pubitemid 34593842)
    • (2002) International Journal of Production Research , vol.40 , Issue.1 , pp. 1-6
    • Benders, J.1
  • 2
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • Bergamashi, D., Cigolin, R., Perona, M., Portioli, A., 1997. Order review and release strategies in job shop environment: a review and a classification. International Journal of Production Research, 35(2):399-420. [doi:10.1080/002075497195821] (Pubitemid 127564055)
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.1    Cigolini, R.2    Perona, M.3    Portioli, A.4
  • 3
    • 84955111586 scopus 로고    scopus 로고
    • MGM-modeling and balancing problem in supply chain management
    • Gold Cost, Australia
    • Matsui, M., 2004. MGM-modeling and Balancing Problem in Supply Chain Management. Proceedings of APIEMS, Gold Cost, Australia.
    • (2004) Proceedings of APIEMS
    • Matsui, M.1
  • 4
    • 29144528794 scopus 로고    scopus 로고
    • A management cycle model: Switching control under lot processing and time span
    • Matsui, M., 2005. A management cycle model: switching control under lot processing and time span. Journal of Japan Industrial Management Association, 56(4):256-264. (Pubitemid 41809550)
    • (2005) Journal of Japan Industrial Management Association , vol.56 , Issue.4 , pp. 256-264
    • Matsui, M.1
  • 6
    • 0006484726 scopus 로고
    • Conveyor-serviced production system: An analytic framework for station-centered approach by some queueing formulas
    • (in Japanese)
    • Matsui, M., Shingu, T., Makabe, H., 1977. Conveyor-serviced Production System: an Analytic Framework for Station-Centered Approach by Some Queueing Formulas. Pre-liminary Report of the Operations Research Society of Japan, p.104-107 (in Japanese).
    • (1977) Pre-liminary Report of the Operations Research Society of Japan , pp. 104-107
    • Matsui, M.1    Shingu, T.2    Makabe, H.3
  • 11
    • 33745624273 scopus 로고    scopus 로고
    • A basic study on a limit-cycle problem with multi periods and the optimal assignment problem
    • Yamamoto, H., Matsui, M., Liu, J., 2006. A basic study on a limited-cycle problem with multi periods and the optimal assignment problem. Journal of Japan Industrial Management Association, 57(1):23-31 (in Japanese). (Pubitemid 43986492)
    • (2006) Journal of Japan Industrial Management Association , vol.57 , Issue.1 , pp. 23-31
    • Yamamoto, H.1    Matui, M.2    Liu, J.3
  • 12
    • 34547443927 scopus 로고    scopus 로고
    • A branch and bound method for the optimal assignment during a limit-cycle problem with multiple periods
    • Yamamoto, H., Matsui, M., Bai, X.S., 2007. A branch and bound method for the optimal assignment during a limit-cycle problem with multiple periods. Journal of Japan Industrial Management Association, 58(1):37-43 (in Japanese). (Pubitemid 47172979)
    • (2007) Journal of Japan Industrial Management Association , vol.58 , Issue.1 , pp. 37-43
    • Yamamoto, H.1    Matui, M.2    Bai, X.S.3
  • 13
    • 78049384841 scopus 로고    scopus 로고
    • A study on limited-cycle scheduling problem with multiple periods
    • [doi:10.1016/j.cie.2010.07.017]
    • Yamamoto, H., Sun, J., Matsui, M., 2010. A study on limited-cycle scheduling problem with multiple periods. Computers & Industrial Engineering, 59(4):675-681. [doi:10. 1016/j.cie.2010.07.017]
    • (2010) Computers & Industrial Engineering , vol.59 , Issue.4 , pp. 675-681
    • Yamamoto, H.1    Sun, J.2    Matsui, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.