Volumn 59, Issue 4, 2010, Pages 675-681

A study on limited-cycle scheduling problem with multiple periods

Author keywords

Limited cycle problem; Manufacturing line; Multi period; Optimal assignment; Production seat system; Scheduling problem

Indexed keywords

LIMITED-CYCLE PROBLEM; MANUFACTURING LINES; MULTI-PERIOD; OPTIMAL ASSIGNMENT; SCHEDULING PROBLEM;

EID: 78049384841     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2010.07.017     Document Type: Article
Times cited : (17)

References (18)
  • 3
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead time settings
    • S.T. Enns MRP performance effects due to lot size and planned lead time settings International Journal of Production Research 39 2001 461 480
    • (2001) International Journal of Production Research , vol.39 , pp. 461-480
    • Enns, S.T.1
  • 4
    • 0001754984 scopus 로고
    • The effects of some design factors on the efficiency of production lines with variable operation times
    • F.S. Hillier, and R.W. Boling The effects of some design factors on the efficiency of production lines with variable operation times Journal of Industrial Engineering 17 1966 651 658
    • (1966) Journal of Industrial Engineering , vol.17 , pp. 651-658
    • Hillier, F.S.1    Boling, R.W.2
  • 5
    • 28944445917 scopus 로고    scopus 로고
    • Simultaneous optimization of work and buffer space in unpaced production lines with random processing times
    • M.S. Hillier, and F.S. Hillier Simultaneous optimization of work and buffer space in unpaced production lines with random processing times IIE Transactions 38 2006 39 51
    • (2006) IIE Transactions , vol.38 , pp. 39-51
    • Hillier, M.S.1    Hillier, F.S.2
  • 6
    • 0017961768 scopus 로고
    • Heuristics for determining output and work allocations in series flow lines
    • M.J. Magazine, and G.L. Silver Heuristics for determining output and work allocations in series flow lines International Journal of Production Research 16 1978 169 181
    • (1978) International Journal of Production Research , vol.16 , pp. 169-181
    • Magazine, M.J.1    Silver, G.L.2
  • 7
    • 84955111586 scopus 로고    scopus 로고
    • MGM-modeling and balancing problem in supply chain management
    • Gold Cost, Australia (on CD-ROM)
    • Matsui, M. (2004). MGM-modeling and balancing problem in supply chain management. In Proceedings of APIEMS 2004, Gold Cost, Australia (on CD-ROM).
    • (2004) Proceedings of APIEMS 2004
    • Matsui, M.1
  • 8
    • 29144528794 scopus 로고    scopus 로고
    • A management cycle model: Switching control under lot processing and time span
    • M. Matsui A management cycle model: Switching control under lot processing and time span Journal of Japan Industrial Management Association 56 2005 256 264
    • (2005) Journal of Japan Industrial Management Association , vol.56 , pp. 256-264
    • Matsui, M.1
  • 10
    • 0006484726 scopus 로고
    • Conveyor-serviced production system: An analytic framework for station-centered approach by some queueing formulas
    • Matsui, M., Shingu, T., & Makabe, H. (1977). Conveyor-serviced production system: An analytic framework for station-centered approach by some queueing formulas. Preliminary report of the Operations Research Society of Japan, pp. 104-107 (in Japanese).
    • (1977) Preliminary Report of the Operations Research Society of Japan , pp. 104-107
    • Matsui, M.1    Shingu, T.2    Makabe, H.3
  • 14
    • 41149100125 scopus 로고    scopus 로고
    • Stochastic scheduling to minimize the expected maximum lateness
    • X. Wu, and X. Zhou Stochastic scheduling to minimize the expected maximum lateness European Journal of Operational Research 190 2008 103 115
    • (2008) European Journal of Operational Research , vol.190 , pp. 103-115
    • Wu, X.1    Zhou, X.2
  • 15
    • 15744370698 scopus 로고    scopus 로고
    • Hybrid particle swarm optimization approach for multi-objective flexible job-shop scheduling problems
    • W.J. Xia, and Z.M. Wu Hybrid particle swarm optimization approach for multi-objective flexible job-shop scheduling problems Control and Decision 20 2 2005 137 141
    • (2005) Control and Decision , vol.20 , Issue.2 , pp. 137-141
    • Xia, W.J.1    Wu, Z.M.2
  • 16
    • 34547443927 scopus 로고    scopus 로고
    • Branch and bound method for the optimal assignment during a limit-cycle problem with multiple periods
    • H. Yamamoto, M. Matsui, and X.S. Bai Branch and bound method for the optimal assignment during a limit-cycle problem with multiple periods Journal of Japan Industrial Management Association 58 2007 37 43 (in Japanese)
    • (2007) Journal of Japan Industrial Management Association , vol.58 , pp. 37-43
    • Yamamoto, H.1    Matsui, M.2    Bai, X.S.3
  • 17
    • 33745624273 scopus 로고    scopus 로고
    • A basic study on a limited-cycle problem with multi periods and the optimal assignment problem
    • H. Yamamoto, M. Matsui, and J. Liu A basic study on a limited-cycle problem with multi periods and the optimal assignment problem Journal of Japan Industrial Management Association 57 2006 23 31 (in Japanese)
    • (2006) Journal of Japan Industrial Management Association , vol.57 , pp. 23-31
    • Yamamoto, H.1    Matsui, M.2    Liu, J.3
  • 18
    • 69649094057 scopus 로고    scopus 로고
    • A new algorithm for complex product flexible scheduling with constraint between jobs
    • Xie Zhiqiang, Hao Shuzhen, Ye Guangjie, and Tan Guangyu A new algorithm for complex product flexible scheduling with constraint between jobs Computers & Industrial Engineering 57 2009 766 772
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 766-772
    • Zhiqiang, X.1    Shuzhen, H.2    Guangjie, Y.3    Guangyu, T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.