-
1
-
-
0033079828
-
Early/tardy scheduling with sequence dependent setups on uniform parallel machines
-
DOI 10.1016/S0305-0548(98)00051-3, PII S0305054898000513
-
N. Balakrishnan, J.J. Kanet, and S.V. Sridharan Early/tardy scheduling with sequence dependent setups on uniform parallel machines Computers and Operations Research 26 1999 127 141 (Pubitemid 29346480)
-
(1999)
Computers and Operations Research
, vol.26
, Issue.2
, pp. 127-141
-
-
Balakrishnan, N.1
Kanet, J.J.2
Sridharan, S.V.3
-
3
-
-
34249341750
-
Using dispatching rules for job shop scheduling with due date-based objectives
-
DOI 10.1080/00207540600786715, PII 779017261
-
T.C. Chiang, and L.C. Fu Using dispatching rules for job shop scheduling with due date-based objectives International Journal of Production Research 45 2007 3245 3262 (Pubitemid 46809100)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.14
, pp. 3245-3262
-
-
Chiang, T.C.1
Fu, L.C.2
-
4
-
-
69849107136
-
Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
-
F. Jabbarizadeh, M. Zandieh, and D. Talebi Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints Computers and Industrial Engineering 57 2009 949 957
-
(2009)
Computers and Industrial Engineering
, vol.57
, pp. 949-957
-
-
Jabbarizadeh, F.1
Zandieh, M.2
Talebi, D.3
-
5
-
-
52049090864
-
A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
-
J. Jungwattanakit, M. Reodecha, P. Chaovalitwongse, and F. Werner A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria Computers and Operations Research 36 2009 358 378
-
(2009)
Computers and Operations Research
, vol.36
, pp. 358-378
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
7
-
-
77952615049
-
Scheduling a dynamic flexible flow line with sequence-dependent setup times: A simulation analysis
-
H.R. Kia, H. Davoudpour, and M. Zandieh Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis International Journal of Production Research 48 2010 4019 4042
-
(2010)
International Journal of Production Research
, vol.48
, pp. 4019-4042
-
-
Kia, H.R.1
Davoudpour, H.2
Zandieh, M.3
-
8
-
-
41949089868
-
Distributed feedback control algorithm for dynamic truck loading scheduling problem
-
DOI 10.1016/j.amc.2007.09.068, PII S0096300307009952
-
J. Kim, and C. Ok Distributed feedback control algorithm for dynamic truck loading scheduling problem Applied Mathematics and Computation 199 2008 275 284 (Pubitemid 351508331)
-
(2008)
Applied Mathematics and Computation
, vol.199
, Issue.1
, pp. 275-284
-
-
Kim, J.1
Ok, C.2
-
10
-
-
38849188495
-
Scheduling multistage batch plants with parallel units and no interstage storage
-
DOI 10.1016/j.compchemeng.2007.02.002, PII S0098135407000324
-
Y. Liu, and I.A. Karimi Scheduling multistage batch plants with parallel units and no intermediate storage Computers and Chemical Engineering 32 2008 671 693 (Pubitemid 351199671)
-
(2008)
Computers and Chemical Engineering
, vol.32
, Issue.4-5
, pp. 671-693
-
-
Liu, Y.1
Karimi, I.A.2
-
11
-
-
0032166612
-
A simulation study for dynamic scheduling in a hybrid assembly/job shop considering the JIT context
-
D.H. Moon, and D.P. Christy A simulation study for dynamic scheduling in a hybrid assembly/job shop considering the JIT context Production Planning and Control 9 1998 532 541 (Pubitemid 128624344)
-
(1998)
Production Planning and Control
, vol.9
, Issue.6
, pp. 532-541
-
-
Moon, D.H.1
Christy, D.P.2
-
13
-
-
34548628251
-
A differential evolution approach for the common due date early/tardy job scheduling problem
-
DOI 10.1016/j.cor.2006.08.013, PII S0305054806002024
-
A.C. Nearchou A differential evolution approach for the common due date early/tardy job scheduling problem Computers and Operations Research 35 2008 1329 1343 (Pubitemid 47404773)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1329-1343
-
-
Nearchou, A.C.1
-
14
-
-
72449178613
-
Simulation modeling and analysis for production scheduling using real-time dispatching rules: A case study in canned fruit industry
-
P. Parthanadeea, and J. Buddhakulsomsiri Simulation modeling and analysis for production scheduling using real-time dispatching rules: a case study in canned fruit industry Computers and Electronics in Agriculture 70 2010 245 255
-
(2010)
Computers and Electronics in Agriculture
, vol.70
, pp. 245-255
-
-
Parthanadeea, P.1
Buddhakulsomsiri, J.2
-
15
-
-
0034468359
-
Performance of real-time distributed arrival time control in heterarchical manufacturing systems
-
DOI 10.1023/A:1007643520025
-
V.V. Prabhu Performance of real-time distributed arrival time control in heterarchical manufacturing systems IIE Transactions 32 2000 323 331 (Pubitemid 32210813)
-
(2000)
IIE Transactions (Institute of Industrial Engineers)
, vol.32
, Issue.4
, pp. 323-331
-
-
Prabhu, V.V.1
-
16
-
-
33751071385
-
A taxonomy of flexible flow line scheduling procedures
-
DOI 10.1016/j.ejor.2006.01.042, PII S0377221706001202
-
D. Quadt, and H. Kuhn A taxonomy of flexible flow line scheduling procedures European Journal of Operational Research 178 2007 686 698 (Pubitemid 44765139)
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.3
, pp. 686-698
-
-
Quadt, D.1
Kuhn, H.2
-
19
-
-
0037395532
-
Parallel machine earliness and tardiness scheduling with proportional weights
-
DOI 10.1016/S0305-0548(02)00055-2, PII S0305054802000552
-
H. Sun, and G. Wang Parallel machine earliness and tardiness scheduling with proportional weights Computers and Operations Research 30 2003 801 808 (Pubitemid 36175285)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.5
, pp. 801-808
-
-
Sun, H.1
Wang, G.2
-
20
-
-
49649118743
-
Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach
-
M.D. Toksarl, and E. Guner Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach International Journal of Advanced Manufacturing Technology 38 2007 801 808
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.38
, pp. 801-808
-
-
Toksarl, M.D.1
Guner, E.2
|