-
1
-
-
3943054030
-
Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
-
Hino CM, Ronconi DP, Mendes AB (2005) Minimizing earliness and tardiness penalties in a single-machine problem with a common due date. Eur J Oper Res 160:190-201
-
(2005)
Eur J Oper Res
, vol.160
, pp. 190-201
-
-
Hino, C.M.1
Ronconi, D.P.2
Mendes, A.B.3
-
3
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
1
-
Baker KR, Scudder GD (1990) Sequencing with earliness and tardiness penalties: a review. Oper Res 38(1):22-36
-
(1990)
Oper Res
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
4
-
-
0035145661
-
Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties
-
Bank J, Werner F (2001) Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties. Math Comput Model 33:363-383
-
(2001)
Math Comput Model
, vol.33
, pp. 363-383
-
-
Bank, J.1
Werner, F.2
-
5
-
-
0034228084
-
Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach
-
Zhu Z, Heady RB (2000) Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach. Comput Ind Eng 38:297-305
-
(2000)
Comput Ind Eng
, vol.38
, pp. 297-305
-
-
Zhu, Z.1
Heady, R.B.2
-
6
-
-
0037395532
-
Parallel machine earliness and tardiness scheduling with proportional weights
-
Sun H, Wang G (2003) Parallel machine earliness and tardiness scheduling with proportional weights. Comput Oper Res 30:801-808
-
(2003)
Comput Oper Res
, vol.30
, pp. 801-808
-
-
Sun, H.1
Wang, G.2
-
7
-
-
0002349523
-
Weighted-tardiness scheduling on parallel machines with proportional weights
-
1
-
Arkin EM, Roundy RO (1991) Weighted-tardiness scheduling on parallel machines with proportional weights. Oper Res 39(1):64-81
-
(1991)
Oper Res
, vol.39
, pp. 64-81
-
-
Arkin, E.M.1
Roundy, R.O.2
-
8
-
-
0036568108
-
Approximation algorithms for common due date assignment and job scheduling on parallel machines
-
Xiao W-Q, Li C-L (2002) Approximation algorithms for common due date assignment and job scheduling on parallel machines. IIE Transactions 34:467-477
-
(2002)
IIE Transactions
, vol.34
, pp. 467-477
-
-
Xiao, W.-Q.1
Li, C.-L.2
-
9
-
-
0034631284
-
Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
-
10
-
Radhakrishnan S, Ventura JA (2000) Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times. Int J Prod Res 38(10):2233-2252
-
(2000)
Int J Prod Res
, vol.38
, pp. 2233-2252
-
-
Radhakrishnan, S.1
Ventura, J.A.2
-
10
-
-
0041732082
-
Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
-
Yi Y, Wang DW (2003) Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. J Intell Manuf 14:311-322
-
(2003)
J Intell Manuf
, vol.14
, pp. 311-322
-
-
Yi, Y.1
Wang, D.W.2
-
11
-
-
24144460572
-
Two-phase sub population genetic algorithm for parallel machine-scheduling problem
-
Chang P-C, Chen S-H, Lin K-L (2005) Two-phase sub population genetic algorithm for parallel machine-scheduling problem. Expert Syst Appl 29:705-712
-
(2005)
Expert Syst Appl
, vol.29
, pp. 705-712
-
-
Chang, P.-C.1
Chen, S.-H.2
Lin, K.-L.3
-
12
-
-
10644241667
-
Parallel machine selection and job scheduling to minimize machine cost and job tardiness
-
Caoa D, Chena M, Wanb G (2005) Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Comput Oper Res 32:1995-2012
-
(2005)
Comput Oper Res
, vol.32
, pp. 1995-2012
-
-
Caoa, D.1
Chena, M.2
Wanb, G.3
-
13
-
-
34047181001
-
Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
-
DOI: 10.1016/j.cor.2006.02.009
-
Anghinolfi D, Paolucci M (2007) Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach. Comput Oper Res DOI 10.1016/j.cor.2006.02.009
-
(2007)
Comput Oper Res
-
-
Anghinolfi, D.1
Paolucci, M.2
-
14
-
-
9644302529
-
Earliness/tardiness scheduling with setup considerations
-
Sourd F (2005) Earliness/tardiness scheduling with setup considerations. Comput Oper Res 32:1849-1865
-
(2005)
Comput Oper Res
, vol.32
, pp. 1849-1865
-
-
Sourd, F.1
-
15
-
-
33750025008
-
A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
-
3
-
Lopes MJP, de Carvalho JMV (2007) A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times. Eur J Oper Res 176(3):1508-1527
-
(2007)
Eur J Oper Res
, vol.176
, pp. 1508-1527
-
-
Lopes, M.J.P.1
De Carvalho, J.M.V.2
-
16
-
-
0035427775
-
Scheduling problems with a learning effect
-
Mosheiov G (2001) Scheduling problems with a learning effect. Eur J Oper Res 132:687-693
-
(2001)
Eur J Oper Res
, vol.132
, pp. 687-693
-
-
Mosheiov, G.1
-
17
-
-
0345201636
-
Single-machine scheduling with learning considerations
-
Biskup D (1999) Single-machine scheduling with learning considerations. Eur J Oper Res 115:173-178
-
(1999)
Eur J Oper Res
, vol.115
, pp. 173-178
-
-
Biskup, D.1
-
18
-
-
0037449223
-
Scheduling with general job-dependent learning curves
-
Mosheiov G, Sidney JB (2003) Scheduling with general job-dependent learning curves. Eur J Oper Res 147:665-670
-
(2003)
Eur J Oper Res
, vol.147
, pp. 665-670
-
-
Mosheiov, G.1
Sidney, J.B.2
-
19
-
-
33846579161
-
Minimizing total tardiness in a scheduling problem with a learning effect
-
7
-
Eren T, Güner E (2007) Minimizing total tardiness in a scheduling problem with a learning effect. Appl Math Model 31(7):1351-1361
-
(2007)
Appl Math Model
, vol.31
, pp. 1351-1361
-
-
Eren, T.1
Güner, E.2
-
20
-
-
33750993497
-
Single machine and two machine flowshop scheduling with general learning functions
-
2
-
Koulamas C, Kyparisis GJ (2007) Single machine and two machine flowshop scheduling with general learning functions. Eur J Oper Res 178(2):402-407
-
(2007)
Eur J Oper Res
, vol.178
, pp. 402-407
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
21
-
-
33746239045
-
Minimizing the total completion time in a single machine scheduling problem with a time dependent learning effect
-
2
-
Kuo WH, Yang DL (2006) Minimizing the total completion time in a single machine scheduling problem with a time dependent learning effect. Eur J Oper Res 174(2):1184-1190
-
(2006)
Eur J Oper Res
, vol.174
, pp. 1184-1190
-
-
Kuo, W.H.1
Yang, D.L.2
-
22
-
-
29144506060
-
Single machine group scheduling with a time dependent learning effect
-
Kuo WH, Yang DL (2006) Single machine group scheduling with a time dependent learning effect. Eur J Oper Res 33:2099-2112
-
(2006)
Eur J Oper Res
, vol.33
, pp. 2099-2112
-
-
Kuo, W.H.1
Yang, D.L.2
-
23
-
-
33747152563
-
A bi-criteria two-machine flowshop scheduling problem with a learning effect
-
9
-
Chen P, Wu C-C, Lee W-C (2006) A bi-criteria two-machine flowshop scheduling problem with a learning effect. J Oper Res Soc 57(9):1113-1125
-
(2006)
J Oper Res Soc
, vol.57
, pp. 1113-1125
-
-
Chen, P.1
Wu, C.-C.2
Lee, W.-C.3
-
24
-
-
0030305471
-
-Shaped policies to schedule deteriorating jobs
-
Mosheiov G (1996) -shaped policies to schedule deteriorating jobs. J Oper Res Soc 47:1184-1191
-
(1996)
J Oper Res Soc
, vol.47
, pp. 1184-1191
-
-
Mosheiov, G.1
-
25
-
-
0024137249
-
Single facility scheduling with nonlinear processing times
-
Gupta JND, Gupta SK (1988) Single facility scheduling with nonlinear processing times. Comput Ind Eng 14:387-393
-
(1988)
Comput Ind Eng
, vol.14
, pp. 387-393
-
-
Gupta, J.N.D.1
Gupta, S.K.2
-
26
-
-
0025700721
-
Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem
-
Kunnatur AS, Gupta SK (1990) Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. Eur J Oper Res 47:56-64
-
(1990)
Eur J Oper Res
, vol.47
, pp. 56-64
-
-
Kunnatur, A.S.1
Gupta, S.K.2
-
27
-
-
0025429963
-
Scheduling deteriorating jobs on a single processor
-
Browne S, Yechiali U (1990) Scheduling deteriorating jobs on a single processor. Oper Res 38:495-498
-
(1990)
Oper Res
, vol.38
, pp. 495-498
-
-
Browne, S.1
Yechiali, U.2
-
28
-
-
0032682389
-
Scheduling with time dependent processing times: Review and extensions
-
7
-
Alidaee B, Womer NK (1999) Scheduling with time dependent processing times: review and extensions. J Oper Res Soc 50(7):711-720
-
(1999)
J Oper Res Soc
, vol.50
, pp. 711-720
-
-
Alidaee, B.1
Womer, N.K.2
-
29
-
-
0028463787
-
Scheduling jobs under simple linear deterioration
-
6
-
Mosheiov G (1994) Scheduling jobs under simple linear deterioration. Comput Oper 21(6):653-659
-
(1994)
Comput Oper
, vol.21
, pp. 653-659
-
-
Mosheiov, G.1
-
30
-
-
0026258725
-
V-shaped policies for scheduling deteriorating jobs
-
Mosheiov G (1991) V-shaped policies for scheduling deteriorating jobs. Oper Res 39:979-991
-
(1991)
Oper Res
, vol.39
, pp. 979-991
-
-
Mosheiov, G.1
-
31
-
-
0142246404
-
Minimization of maximum lateness under linear deterioration
-
Hsu YS, Lin BMT (2003) Minimization of maximum lateness under linear deterioration. Omega 31:459-469
-
(2003)
Omega
, vol.31
, pp. 459-469
-
-
Hsu, Y.S.1
Lin, B.M.T.2
-
32
-
-
27844604203
-
Flow shop scheduling with deteriorating jobs under dominating machines
-
Wang JB, Xia ZQ (2006) Flow shop scheduling with deteriorating jobs under dominating machines. Omega 34:327-336
-
(2006)
Omega
, vol.34
, pp. 327-336
-
-
Wang, J.B.1
Xia, Z.Q.2
-
33
-
-
33748318134
-
Minimizing total completion time in a two-machine flow shop with deteriorating jobs
-
1
-
Wang JB, Ng CTD, Cheng TCE, Liu LL (2006) Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl Math Comput 180(1):185-193
-
(2006)
Appl Math Comput
, vol.180
, pp. 185-193
-
-
Wang, J.B.1
Ng, C.T.D.2
Cheng, T.C.E.3
Liu, L.L.4
-
34
-
-
33750843991
-
Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
-
1
-
Wang X, Cheng TCE (2007) Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. Eur J Oper Res 178(1):57-70
-
(2007)
Eur J Oper Res
, vol.178
, pp. 57-70
-
-
Wang, X.1
Cheng, T.C.E.2
-
35
-
-
33748913175
-
Single-machine scheduling problems with the effects of learning and deterioration
-
4
-
Wang JB (2007) Single-machine scheduling problems with the effects of learning and deterioration. Omega 35(4):397-402
-
(2007)
Omega
, vol.35
, pp. 397-402
-
-
Wang, J.B.1
-
36
-
-
33845309968
-
Flow shop scheduling problems with decreasing linear deterioration under dominant machines
-
7
-
Wang JB (2007) Flow shop scheduling problems with decreasing linear deterioration under dominant machines. Comput Oper Res 34(7):2043-2058
-
(2007)
Comput Oper Res
, vol.34
, pp. 2043-2058
-
-
Wang, J.B.1
-
37
-
-
33745866674
-
Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
-
2
-
Wu CC, Lee WC (2006) Two-machine flowshop scheduling to minimize mean flow time under linear deterioration. Int J Prod Econ 103(2):572-584
-
(2006)
Int J Prod Econ
, vol.103
, pp. 572-584
-
-
Wu, C.C.1
Lee, W.C.2
-
38
-
-
34250866835
-
A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs
-
DOI: 10.1016/j.ijpe.2006.11.014
-
Kang L, Ng CT (2006) A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs. Int J Prod Econ DOI 10.1016/j.ijpe.2006.11.014
-
(2006)
Int J Prod Econ
-
-
Kang, L.1
Ng, C.T.2
-
39
-
-
2342656496
-
Due-date assignment and single machine scheduling with deteriorating jobs
-
2
-
Cheng TCE, Kang L, Ng CT (2004) Due-date assignment and single machine scheduling with deteriorating jobs. J Oper Res Soc 55(2):198-203
-
(2004)
J Oper Res Soc
, vol.55
, pp. 198-203
-
-
Cheng, T.C.E.1
Kang, L.2
Ng, C.T.3
-
40
-
-
0028533158
-
Single machine scheduling with start time dependent processing time: Some solvable cases
-
3
-
Sundararaghavan PS, Kunnathur AS (1994) Single machine scheduling with start time dependent processing time: some solvable cases. Eur J Oper Res 78(3):394-403
-
(1994)
Eur J Oper Res
, vol.78
, pp. 394-403
-
-
Sundararaghavan, P.S.1
Kunnathur, A.S.2
-
41
-
-
0029390921
-
Scheduling jobs with step-deterioration: Minimizing makespan on a single and multi-machine
-
4
-
Mosheiov G (1995) Scheduling jobs with step-deterioration: minimizing makespan on a single and multi-machine. Comput Ind Eng 28(4):869-879
-
(1995)
Comput Ind Eng
, vol.28
, pp. 869-879
-
-
Mosheiov, G.1
-
42
-
-
0141828947
-
Scheduling jobs with piecewise linear decreasing processing times
-
6
-
Cheng TCE, Ding Q, Kovalyov MY, Bachman A, Janiak A (2003) Scheduling jobs with piecewise linear decreasing processing times. Nav Res Log 50(6):531-554
-
(2003)
Nav Res Log
, vol.50
, pp. 531-554
-
-
Cheng, T.C.E.1
Ding, Q.2
Kovalyov, M.Y.3
Bachman, A.4
Janiak, A.5
-
43
-
-
0025700721
-
Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem
-
Kunnatur AS, Gupta SK (1990) Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. Eur J Oper Res 47:56-64
-
(1990)
Eur J Oper Res
, vol.47
, pp. 56-64
-
-
Kunnatur, A.S.1
Gupta, S.K.2
-
44
-
-
0032136143
-
Scheduling deteriorating jobs to minimize makespan
-
Kubiak W, Van de Velde S (1998) Scheduling deteriorating jobs to minimize makespan. Nav Res Log 45:511-523
-
(1998)
Nav Res Log
, vol.45
, pp. 511-523
-
-
Kubiak, W.1
Van De Velde, S.2
-
45
-
-
0024137249
-
Single facility scheduling with nonlinear processing times
-
Gupta JND, Gupta SK (1988) Single facility scheduling with nonlinear processing times. Comput Ind Eng 14:387-393
-
(1988)
Comput Ind Eng
, vol.14
, pp. 387-393
-
-
Gupta, J.N.D.1
Gupta, S.K.2
-
46
-
-
0037063772
-
Scheduling jobs with values exponentially deteriorating over time
-
Voutsinas GT, Pappis CP (2002) Scheduling jobs with values exponentially deteriorating over time. Int J Prod Econ 79:163-169
-
(2002)
Int J Prod Econ
, vol.79
, pp. 163-169
-
-
Voutsinas, G.T.1
Pappis, C.P.2
-
47
-
-
85059110622
-
A concise survey on the scheduling problems with deteriorating processing times
-
Cheng TCE, Ding Q, Lin BMT (2003) A concise survey on the scheduling problems with deteriorating processing times. Eur J Oper Res 152:1-13
-
(2003)
Eur J Oper Res
, vol.152
, pp. 1-13
-
-
Cheng, T.C.E.1
Ding, Q.2
Lin, B.M.T.3
|