메뉴 건너뛰기




Volumn 38, Issue 7-8, 2008, Pages 801-808

Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach

Author keywords

Common due date; Deterioration jobs; Earliness tardiness; Learning effect; Parallel machine; Scheduling; Sequence dependent setup time

Indexed keywords

DETERIORATION; DYNAMIC PROGRAMMING; EDUCATION; MATHEMATICAL PROGRAMMING; NONLINEAR PROGRAMMING; PARALLEL PROGRAMMING;

EID: 49649118743     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-007-1128-3     Document Type: Article
Times cited : (76)

References (47)
  • 1
    • 3943054030 scopus 로고    scopus 로고
    • Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
    • Hino CM, Ronconi DP, Mendes AB (2005) Minimizing earliness and tardiness penalties in a single-machine problem with a common due date. Eur J Oper Res 160:190-201
    • (2005) Eur J Oper Res , vol.160 , pp. 190-201
    • Hino, C.M.1    Ronconi, D.P.2    Mendes, A.B.3
  • 3
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • 1
    • Baker KR, Scudder GD (1990) Sequencing with earliness and tardiness penalties: a review. Oper Res 38(1):22-36
    • (1990) Oper Res , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 4
    • 0035145661 scopus 로고    scopus 로고
    • Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties
    • Bank J, Werner F (2001) Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties. Math Comput Model 33:363-383
    • (2001) Math Comput Model , vol.33 , pp. 363-383
    • Bank, J.1    Werner, F.2
  • 5
    • 0034228084 scopus 로고    scopus 로고
    • Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach
    • Zhu Z, Heady RB (2000) Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach. Comput Ind Eng 38:297-305
    • (2000) Comput Ind Eng , vol.38 , pp. 297-305
    • Zhu, Z.1    Heady, R.B.2
  • 6
    • 0037395532 scopus 로고    scopus 로고
    • Parallel machine earliness and tardiness scheduling with proportional weights
    • Sun H, Wang G (2003) Parallel machine earliness and tardiness scheduling with proportional weights. Comput Oper Res 30:801-808
    • (2003) Comput Oper Res , vol.30 , pp. 801-808
    • Sun, H.1    Wang, G.2
  • 7
    • 0002349523 scopus 로고
    • Weighted-tardiness scheduling on parallel machines with proportional weights
    • 1
    • Arkin EM, Roundy RO (1991) Weighted-tardiness scheduling on parallel machines with proportional weights. Oper Res 39(1):64-81
    • (1991) Oper Res , vol.39 , pp. 64-81
    • Arkin, E.M.1    Roundy, R.O.2
  • 8
    • 0036568108 scopus 로고    scopus 로고
    • Approximation algorithms for common due date assignment and job scheduling on parallel machines
    • Xiao W-Q, Li C-L (2002) Approximation algorithms for common due date assignment and job scheduling on parallel machines. IIE Transactions 34:467-477
    • (2002) IIE Transactions , vol.34 , pp. 467-477
    • Xiao, W.-Q.1    Li, C.-L.2
  • 9
    • 0034631284 scopus 로고    scopus 로고
    • Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
    • 10
    • Radhakrishnan S, Ventura JA (2000) Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times. Int J Prod Res 38(10):2233-2252
    • (2000) Int J Prod Res , vol.38 , pp. 2233-2252
    • Radhakrishnan, S.1    Ventura, J.A.2
  • 10
    • 0041732082 scopus 로고    scopus 로고
    • Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
    • Yi Y, Wang DW (2003) Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. J Intell Manuf 14:311-322
    • (2003) J Intell Manuf , vol.14 , pp. 311-322
    • Yi, Y.1    Wang, D.W.2
  • 11
    • 24144460572 scopus 로고    scopus 로고
    • Two-phase sub population genetic algorithm for parallel machine-scheduling problem
    • Chang P-C, Chen S-H, Lin K-L (2005) Two-phase sub population genetic algorithm for parallel machine-scheduling problem. Expert Syst Appl 29:705-712
    • (2005) Expert Syst Appl , vol.29 , pp. 705-712
    • Chang, P.-C.1    Chen, S.-H.2    Lin, K.-L.3
  • 12
    • 10644241667 scopus 로고    scopus 로고
    • Parallel machine selection and job scheduling to minimize machine cost and job tardiness
    • Caoa D, Chena M, Wanb G (2005) Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Comput Oper Res 32:1995-2012
    • (2005) Comput Oper Res , vol.32 , pp. 1995-2012
    • Caoa, D.1    Chena, M.2    Wanb, G.3
  • 13
    • 34047181001 scopus 로고    scopus 로고
    • Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
    • DOI: 10.1016/j.cor.2006.02.009
    • Anghinolfi D, Paolucci M (2007) Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach. Comput Oper Res DOI 10.1016/j.cor.2006.02.009
    • (2007) Comput Oper Res
    • Anghinolfi, D.1    Paolucci, M.2
  • 14
    • 9644302529 scopus 로고    scopus 로고
    • Earliness/tardiness scheduling with setup considerations
    • Sourd F (2005) Earliness/tardiness scheduling with setup considerations. Comput Oper Res 32:1849-1865
    • (2005) Comput Oper Res , vol.32 , pp. 1849-1865
    • Sourd, F.1
  • 15
    • 33750025008 scopus 로고    scopus 로고
    • A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
    • 3
    • Lopes MJP, de Carvalho JMV (2007) A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times. Eur J Oper Res 176(3):1508-1527
    • (2007) Eur J Oper Res , vol.176 , pp. 1508-1527
    • Lopes, M.J.P.1    De Carvalho, J.M.V.2
  • 16
    • 0035427775 scopus 로고    scopus 로고
    • Scheduling problems with a learning effect
    • Mosheiov G (2001) Scheduling problems with a learning effect. Eur J Oper Res 132:687-693
    • (2001) Eur J Oper Res , vol.132 , pp. 687-693
    • Mosheiov, G.1
  • 17
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning considerations
    • Biskup D (1999) Single-machine scheduling with learning considerations. Eur J Oper Res 115:173-178
    • (1999) Eur J Oper Res , vol.115 , pp. 173-178
    • Biskup, D.1
  • 18
    • 0037449223 scopus 로고    scopus 로고
    • Scheduling with general job-dependent learning curves
    • Mosheiov G, Sidney JB (2003) Scheduling with general job-dependent learning curves. Eur J Oper Res 147:665-670
    • (2003) Eur J Oper Res , vol.147 , pp. 665-670
    • Mosheiov, G.1    Sidney, J.B.2
  • 19
    • 33846579161 scopus 로고    scopus 로고
    • Minimizing total tardiness in a scheduling problem with a learning effect
    • 7
    • Eren T, Güner E (2007) Minimizing total tardiness in a scheduling problem with a learning effect. Appl Math Model 31(7):1351-1361
    • (2007) Appl Math Model , vol.31 , pp. 1351-1361
    • Eren, T.1    Güner, E.2
  • 20
    • 33750993497 scopus 로고    scopus 로고
    • Single machine and two machine flowshop scheduling with general learning functions
    • 2
    • Koulamas C, Kyparisis GJ (2007) Single machine and two machine flowshop scheduling with general learning functions. Eur J Oper Res 178(2):402-407
    • (2007) Eur J Oper Res , vol.178 , pp. 402-407
    • Koulamas, C.1    Kyparisis, G.J.2
  • 21
    • 33746239045 scopus 로고    scopus 로고
    • Minimizing the total completion time in a single machine scheduling problem with a time dependent learning effect
    • 2
    • Kuo WH, Yang DL (2006) Minimizing the total completion time in a single machine scheduling problem with a time dependent learning effect. Eur J Oper Res 174(2):1184-1190
    • (2006) Eur J Oper Res , vol.174 , pp. 1184-1190
    • Kuo, W.H.1    Yang, D.L.2
  • 22
    • 29144506060 scopus 로고    scopus 로고
    • Single machine group scheduling with a time dependent learning effect
    • Kuo WH, Yang DL (2006) Single machine group scheduling with a time dependent learning effect. Eur J Oper Res 33:2099-2112
    • (2006) Eur J Oper Res , vol.33 , pp. 2099-2112
    • Kuo, W.H.1    Yang, D.L.2
  • 23
    • 33747152563 scopus 로고    scopus 로고
    • A bi-criteria two-machine flowshop scheduling problem with a learning effect
    • 9
    • Chen P, Wu C-C, Lee W-C (2006) A bi-criteria two-machine flowshop scheduling problem with a learning effect. J Oper Res Soc 57(9):1113-1125
    • (2006) J Oper Res Soc , vol.57 , pp. 1113-1125
    • Chen, P.1    Wu, C.-C.2    Lee, W.-C.3
  • 24
    • 0030305471 scopus 로고    scopus 로고
    • -Shaped policies to schedule deteriorating jobs
    • Mosheiov G (1996) -shaped policies to schedule deteriorating jobs. J Oper Res Soc 47:1184-1191
    • (1996) J Oper Res Soc , vol.47 , pp. 1184-1191
    • Mosheiov, G.1
  • 25
    • 0024137249 scopus 로고
    • Single facility scheduling with nonlinear processing times
    • Gupta JND, Gupta SK (1988) Single facility scheduling with nonlinear processing times. Comput Ind Eng 14:387-393
    • (1988) Comput Ind Eng , vol.14 , pp. 387-393
    • Gupta, J.N.D.1    Gupta, S.K.2
  • 26
    • 0025700721 scopus 로고
    • Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem
    • Kunnatur AS, Gupta SK (1990) Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. Eur J Oper Res 47:56-64
    • (1990) Eur J Oper Res , vol.47 , pp. 56-64
    • Kunnatur, A.S.1    Gupta, S.K.2
  • 27
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • Browne S, Yechiali U (1990) Scheduling deteriorating jobs on a single processor. Oper Res 38:495-498
    • (1990) Oper Res , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 28
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • 7
    • Alidaee B, Womer NK (1999) Scheduling with time dependent processing times: review and extensions. J Oper Res Soc 50(7):711-720
    • (1999) J Oper Res Soc , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 29
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • 6
    • Mosheiov G (1994) Scheduling jobs under simple linear deterioration. Comput Oper 21(6):653-659
    • (1994) Comput Oper , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 30
    • 0026258725 scopus 로고
    • V-shaped policies for scheduling deteriorating jobs
    • Mosheiov G (1991) V-shaped policies for scheduling deteriorating jobs. Oper Res 39:979-991
    • (1991) Oper Res , vol.39 , pp. 979-991
    • Mosheiov, G.1
  • 31
    • 0142246404 scopus 로고    scopus 로고
    • Minimization of maximum lateness under linear deterioration
    • Hsu YS, Lin BMT (2003) Minimization of maximum lateness under linear deterioration. Omega 31:459-469
    • (2003) Omega , vol.31 , pp. 459-469
    • Hsu, Y.S.1    Lin, B.M.T.2
  • 32
    • 27844604203 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines
    • Wang JB, Xia ZQ (2006) Flow shop scheduling with deteriorating jobs under dominating machines. Omega 34:327-336
    • (2006) Omega , vol.34 , pp. 327-336
    • Wang, J.B.1    Xia, Z.Q.2
  • 33
    • 33748318134 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    • 1
    • Wang JB, Ng CTD, Cheng TCE, Liu LL (2006) Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl Math Comput 180(1):185-193
    • (2006) Appl Math Comput , vol.180 , pp. 185-193
    • Wang, J.B.1    Ng, C.T.D.2    Cheng, T.C.E.3    Liu, L.L.4
  • 34
    • 33750843991 scopus 로고    scopus 로고
    • Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
    • 1
    • Wang X, Cheng TCE (2007) Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. Eur J Oper Res 178(1):57-70
    • (2007) Eur J Oper Res , vol.178 , pp. 57-70
    • Wang, X.1    Cheng, T.C.E.2
  • 35
    • 33748913175 scopus 로고    scopus 로고
    • Single-machine scheduling problems with the effects of learning and deterioration
    • 4
    • Wang JB (2007) Single-machine scheduling problems with the effects of learning and deterioration. Omega 35(4):397-402
    • (2007) Omega , vol.35 , pp. 397-402
    • Wang, J.B.1
  • 36
    • 33845309968 scopus 로고    scopus 로고
    • Flow shop scheduling problems with decreasing linear deterioration under dominant machines
    • 7
    • Wang JB (2007) Flow shop scheduling problems with decreasing linear deterioration under dominant machines. Comput Oper Res 34(7):2043-2058
    • (2007) Comput Oper Res , vol.34 , pp. 2043-2058
    • Wang, J.B.1
  • 37
    • 33745866674 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
    • 2
    • Wu CC, Lee WC (2006) Two-machine flowshop scheduling to minimize mean flow time under linear deterioration. Int J Prod Econ 103(2):572-584
    • (2006) Int J Prod Econ , vol.103 , pp. 572-584
    • Wu, C.C.1    Lee, W.C.2
  • 38
    • 34250866835 scopus 로고    scopus 로고
    • A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs
    • DOI: 10.1016/j.ijpe.2006.11.014
    • Kang L, Ng CT (2006) A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs. Int J Prod Econ DOI 10.1016/j.ijpe.2006.11.014
    • (2006) Int J Prod Econ
    • Kang, L.1    Ng, C.T.2
  • 39
    • 2342656496 scopus 로고    scopus 로고
    • Due-date assignment and single machine scheduling with deteriorating jobs
    • 2
    • Cheng TCE, Kang L, Ng CT (2004) Due-date assignment and single machine scheduling with deteriorating jobs. J Oper Res Soc 55(2):198-203
    • (2004) J Oper Res Soc , vol.55 , pp. 198-203
    • Cheng, T.C.E.1    Kang, L.2    Ng, C.T.3
  • 40
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing time: Some solvable cases
    • 3
    • Sundararaghavan PS, Kunnathur AS (1994) Single machine scheduling with start time dependent processing time: some solvable cases. Eur J Oper Res 78(3):394-403
    • (1994) Eur J Oper Res , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2
  • 41
    • 0029390921 scopus 로고
    • Scheduling jobs with step-deterioration: Minimizing makespan on a single and multi-machine
    • 4
    • Mosheiov G (1995) Scheduling jobs with step-deterioration: minimizing makespan on a single and multi-machine. Comput Ind Eng 28(4):869-879
    • (1995) Comput Ind Eng , vol.28 , pp. 869-879
    • Mosheiov, G.1
  • 43
    • 0025700721 scopus 로고
    • Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem
    • Kunnatur AS, Gupta SK (1990) Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. Eur J Oper Res 47:56-64
    • (1990) Eur J Oper Res , vol.47 , pp. 56-64
    • Kunnatur, A.S.1    Gupta, S.K.2
  • 44
    • 0032136143 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs to minimize makespan
    • Kubiak W, Van de Velde S (1998) Scheduling deteriorating jobs to minimize makespan. Nav Res Log 45:511-523
    • (1998) Nav Res Log , vol.45 , pp. 511-523
    • Kubiak, W.1    Van De Velde, S.2
  • 45
    • 0024137249 scopus 로고
    • Single facility scheduling with nonlinear processing times
    • Gupta JND, Gupta SK (1988) Single facility scheduling with nonlinear processing times. Comput Ind Eng 14:387-393
    • (1988) Comput Ind Eng , vol.14 , pp. 387-393
    • Gupta, J.N.D.1    Gupta, S.K.2
  • 46
    • 0037063772 scopus 로고    scopus 로고
    • Scheduling jobs with values exponentially deteriorating over time
    • Voutsinas GT, Pappis CP (2002) Scheduling jobs with values exponentially deteriorating over time. Int J Prod Econ 79:163-169
    • (2002) Int J Prod Econ , vol.79 , pp. 163-169
    • Voutsinas, G.T.1    Pappis, C.P.2
  • 47
    • 85059110622 scopus 로고    scopus 로고
    • A concise survey on the scheduling problems with deteriorating processing times
    • Cheng TCE, Ding Q, Lin BMT (2003) A concise survey on the scheduling problems with deteriorating processing times. Eur J Oper Res 152:1-13
    • (2003) Eur J Oper Res , vol.152 , pp. 1-13
    • Cheng, T.C.E.1    Ding, Q.2    Lin, B.M.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.