메뉴 건너뛰기




Volumn 18, Issue 6, 2011, Pages 1537-1544

Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues

Author keywords

EPQ model; Multiple deliveries; Production; Random defective items; Replenishment lot size; Rework; Scrap items

Indexed keywords

COST FUNCTIONS; DEFECTS; MATRIX ALGEBRA; PRODUCTION; QUALITY ASSURANCE;

EID: 84862909645     PISSN: 10263098     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.scient.2011.09.008     Document Type: Article
Times cited : (23)

References (28)
  • 5
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1986 48 55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 6
    • 0023435379 scopus 로고
    • Optimal inspection policies in serial production system including scrap, rework, and repair: An MILP approach
    • B.J. Yum, and E.D. McDowell Optimal inspection policies in serial production system including scrap, rework, and repair: an MILP approach International Journal of Production Research 25 10 1987 1451 1464
    • (1987) International Journal of Production Research , vol.25 , Issue.10 , pp. 1451-1464
    • Yum, B.J.1    McDowell, E.D.2
  • 8
    • 0027927229 scopus 로고
    • Productioninventory systems with unreliable machines
    • M. Berg, M.J.M. Posner, and H. Zhao Productioninventory systems with unreliable machines Operations Research 42 1994 111 118
    • (1994) Operations Research , vol.42 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 10
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo, and J.K. Ord The impact of imperfect processes on production run times Decision Sciences 31 2000 773 785
    • (2000) Decision Sciences , vol.31 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 11
    • 0036565334 scopus 로고    scopus 로고
    • Multistage production to order with rework capability
    • A. Grosfeld-Nir, and Y. Gerchak Multistage production to order with rework capability Management Science 48 5 2002 652 664 (Pubitemid 34648421)
    • (2002) Management Science , vol.48 , Issue.5 , pp. 652-664
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 12
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single- stage production system
    • A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single- stage production system Computers & Industrial Engineering 47 2004 77 89
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 13
  • 16
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Y-S.P. Chiu, K-K. Chen, F-T. Cheng, and M-F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers and Mathematics with Applications 59 2 2010 919 932
    • (2010) Computers and Mathematics with Applications , vol.59 , Issue.2 , pp. 919-932
    • Chiu, Y.-S.P.1    Chen, K.-K.2    Cheng, F.-T.3    Wu, M.-F.4
  • 18
    • 0017416997 scopus 로고
    • Integrated inventory model for a single supplierSingle customer problem
    • S.K. Goyal Integrated inventory model for a single supplierSingle customer problem International Journal of Production Research 15 1977 107 111
    • (1977) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 19
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • A. Banerjee A joint economic-lot-size model for purchaser and vendor Decision Sciences 17 1986 292 311
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 20
  • 21
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • L. Lu A one-vendor multi-buyer integrated inventory model European Journal of Operational Research 81 2 1995 312 323
    • (1995) European Journal of Operational Research , vol.81 , Issue.2 , pp. 312-323
    • Lu, L.1
  • 22
    • 0030190937 scopus 로고    scopus 로고
    • Optimizing a production system with a fixed delivery schedule
    • R.M. Hill Optimizing a production system with a fixed delivery schedule Journal of the Operational Research Society 47 1996 954 960 (Pubitemid 126576160)
    • (1996) Journal of the Operational Research Society , vol.47 , Issue.7 , pp. 954-960
    • Hill, R.M.1
  • 23
    • 0032002459 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model
    • PII S0377221797000325
    • S. Viswanathan Optimal strategy for the integrated vendorbuyer inventory model European Journal of Operational Research 105 1998 38 42 (Pubitemid 128387758)
    • (1998) European Journal of Operational Research , vol.105 , Issue.1 , pp. 38-42
    • Viswanathan, S.1
  • 24
    • 0033297229 scopus 로고    scopus 로고
    • Optimal batch size for a production system operating under periodic delivery policy
    • R.A. Sarker, and L.R. Khan Optimal batch size for a production system operating under periodic delivery policy Computers and Industrial Engineering 37 1999 711 730
    • (1999) Computers and Industrial Engineering , vol.37 , pp. 711-730
    • Sarker, R.A.1    Khan, L.R.2
  • 25
    • 4644312239 scopus 로고    scopus 로고
    • Integrated single vendor single buyer model with stochastic demand and variable lead time
    • M. Ben-Daya, and M. Hariga Integrated single vendor single buyer model with stochastic demand and variable lead time International Journal of Production Economics 92 1 2004 75 80
    • (2004) International Journal of Production Economics , vol.92 , Issue.1 , pp. 75-80
    • Ben-Daya, M.1    Hariga, M.2
  • 26
    • 29144436069 scopus 로고    scopus 로고
    • Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
    • DOI 10.1016/j.cor.2005.02.019, PII S0305054805000754
    • A. Diponegoro, and B.R. Sarker Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries Computers and Operations Research 33 8 2006 2387 2404 (Pubitemid 41802295)
    • (2006) Computers and Operations Research , vol.33 , Issue.8 , pp. 2387-2404
    • Diponegoro, A.1    Sarker, B.R.2
  • 27
    • 68649107898 scopus 로고    scopus 로고
    • Incorporating multi-delivery policy and quality assurance into economic production lot size problem
    • Y-S.P. Chiu, S.W. Chiu, C-Y. Li, and C-K. Ting Incorporating multi-delivery policy and quality assurance into economic production lot size problem Journal of Scientific and Industrial Research 68 2009 505 512
    • (2009) Journal of Scientific and Industrial Research , vol.68 , pp. 505-512
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Li, C.-Y.3    Ting, C.-K.4
  • 28
    • 0004256022 scopus 로고    scopus 로고
    • International edition Prentice-Hall New Jersey, USA pp. 739741
    • R.L. Rardin Optimization in Operations Research International edition 1998 Prentice-Hall New Jersey, USA pp. 739741
    • (1998) Optimization in Operations Research
    • Rardin, R.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.