메뉴 건너뛰기




Volumn 24, Issue , 2012, Pages 120-129

Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components

Author keywords

Automated data collection; Cost sharing; Information technology; Radio frequency identification; RFID; Simulation

Indexed keywords

AUTOMATED DATA COLLECTION; CONCRETE WALL; CONSTRUCTION SUPPLY CHAIN; COST SAVING; COST SHARING; DECISION SUPPORT TOOLS; MATERIAL TRACKING; PRECAST COMPONENTS; RFID TECHNOLOGY; SIMULATION; SIMULATION-BASED; TECHNOLOGY INVESTMENTS; TRACK COMPONENTS;

EID: 84860292786     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.02.005     Document Type: Article
Times cited : (96)

References (21)
  • 3
    • 33644672678 scopus 로고    scopus 로고
    • The application of active radio frequency identification technology for tool tracking on construction job sites
    • P.M. Goodrum, M.A. McLaren, and A. Durfee The application of active radio frequency identification technology for tool tracking on construction job sites Automation in Construction 15 2006 292 302
    • (2006) Automation in Construction , vol.15 , pp. 292-302
    • Goodrum, P.M.1    McLaren, M.A.2    Durfee, A.3
  • 4
    • 29144515805 scopus 로고    scopus 로고
    • Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
    • J. Song, C.T. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction 15 2006 166-177-20
    • (2006) Automation in Construction , vol.15 , pp. 16620-17720
    • Song, J.1    Haas, C.T.2    Caldas, C.3    Ergen, E.4    Akinci, B.5
  • 5
    • 70350064472 scopus 로고    scopus 로고
    • Automated recognition of 3D cad objects in site laser scans for project 3D status visualization and performance control
    • F. Bosche, C.T. Haas, and B. Akinci Automated recognition of 3D cad objects in site laser scans for project 3D status visualization and performance control Journal of Computing in Civil Engineering 23 2009 311 318
    • (2009) Journal of Computing in Civil Engineering , vol.23 , pp. 311-318
    • Bosche, F.1    Haas, C.T.2    Akinci, B.3
  • 6
    • 77952902998 scopus 로고    scopus 로고
    • Benefits and barriers of construction project monitoring using high-resolution automated cameras
    • J.S. Bohn, and J. Teizer Benefits and barriers of construction project monitoring using high-resolution automated cameras Journal of Construction Engineering and Management-ASCE 136 2010 632 640
    • (2010) Journal of Construction Engineering and Management-ASCE , vol.136 , pp. 632-640
    • Bohn, J.S.1    Teizer, J.2
  • 7
    • 67651043223 scopus 로고    scopus 로고
    • Embedded system for construction asset tracking combining radio and ultrasound signals
    • W.S. Jang, and M.J. Skibniewski Embedded system for construction asset tracking combining radio and ultrasound signals Journal of Computing in Civil Engineering-ASCE 23 2009 221 229
    • (2009) Journal of Computing in Civil Engineering-ASCE , vol.23 , pp. 221-229
    • Jang, W.S.1    Skibniewski, M.J.2
  • 8
    • 33745325795 scopus 로고    scopus 로고
    • Using global positioning system to improve materials - Locating processes on industrial projects
    • C.H. Caldas, D. Grau, and C.T. Haas Using global positioning system to improve materials - locating processes on industrial projects Journal of Construction Engineering and Management-ASCE 132 2006 741 749
    • (2006) Journal of Construction Engineering and Management-ASCE , vol.132 , pp. 741-749
    • Caldas, C.H.1    Grau, D.2    Haas, C.T.3
  • 9
    • 80053648019 scopus 로고    scopus 로고
    • Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
    • T. Cheng, M. Venugopal, J. Teizer, and P.A. Vela Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments Automation in Construction 20 2011 1173 1184
    • (2011) Automation in Construction , vol.20 , pp. 1173-1184
    • Cheng, T.1    Venugopal, M.2    Teizer, J.3    Vela, P.A.4
  • 11
    • 68049115666 scopus 로고    scopus 로고
    • Assessing the impact of materials tracking technologies on construction craft productivity
    • D. Grau, C.H. Caldas, C.T. Haas, P.M. Goodrum, and J. Gong Assessing the impact of materials tracking technologies on construction craft productivity Automation in Construction 18 2009 903 911
    • (2009) Automation in Construction , vol.18 , pp. 903-911
    • Grau, D.1    Caldas, C.H.2    Haas, C.T.3    Goodrum, P.M.4    Gong, J.5
  • 14
    • 67349159070 scopus 로고    scopus 로고
    • Developing a precast production management system using RFID technology
    • S.Y.L. Yin, H.P. Tserng, J.C. Wang, and S.C. Tsai Developing a precast production management system using RFID technology Automation in Construction 18 2009 677 691
    • (2009) Automation in Construction , vol.18 , pp. 677-691
    • Yin, S.Y.L.1    Tserng, H.P.2    Wang, J.C.3    Tsai, S.C.4
  • 17
    • 77951139448 scopus 로고    scopus 로고
    • Evaluating RFID investment on a supply chain using tagging cost sharing factor
    • A. Ustundag Evaluating RFID investment on a supply chain using tagging cost sharing factor International Journal of Production Research 48 2010 2549 2562
    • (2010) International Journal of Production Research , vol.48 , pp. 2549-2562
    • Ustundag, A.1
  • 21
    • 75649106487 scopus 로고    scopus 로고
    • Methodology for conducting discrete-event simulation studies in construction engineering and management
    • J.C. Martinez Methodology for conducting discrete-event simulation studies in construction engineering and management Journal of Construction Engineering and Management-ASCE 136 2010 3 16
    • (2010) Journal of Construction Engineering and Management-ASCE , vol.136 , pp. 3-16
    • Martinez, J.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.