메뉴 건너뛰기




Volumn , Issue , 2010, Pages 41-50

Automated materials tracking and locating: Impact modeling and estimation

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMATED MATERIALS; CONSTRUCTION PRODUCTIVITY; CONSTRUCTION SUPPLY CHAIN; FIELD TRIAL; GPS TECHNOLOGIES; IMPACT MODELING; INTEGRATED SYSTEMS; RESEARCH QUESTIONS; RF-ID TAGS; SCHEDULE PERFORMANCE; TECHNOLOGY IMPACT; TORONTO;

EID: 77956317988     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41109(373)5     Document Type: Conference Paper
Times cited : (7)

References (14)
  • 1
    • 0012035787 scopus 로고    scopus 로고
    • Simulation of construction processes: Traditional practices versus lean principles
    • Berkeley, CA: International Group for Lean Construction
    • Al-Sudairi, A. A., Diekmann, J. E., Songer, A. D., & Brown, H. M. (1999). Simulation of Construction Processes: Traditional Practices Versus Lean Principles. IGLC-7 (pp. 39-50). Berkeley, CA: International Group for Lean Construction.
    • (1999) IGLC-7 , pp. 39-50
    • Al-Sudairi, A.A.1    Diekmann, J.E.2    Songer, A.D.3    Brown, H.M.4
  • 2
    • 0012035785 scopus 로고    scopus 로고
    • Construction Industry Institute, University of Texas at Austin. Austin, Texas: Construction Industry Institue
    • Construction Industry Institute. (1999). Procurement and Materials Management: A Guide to Effective Project Execution. University of Texas at Austin. Austin, Texas: Construction Industry Institue.
    • (1999) Procurement and Materials Management: A Guide to Effective Project Execution
  • 3
    • 77956314440 scopus 로고    scopus 로고
    • Construction Industry Institute, University of Texas at Austin. Austin, Texas: Construction Industry Institute
    • Construction Industry Institute. (2008). RT-240 Leveraging Technology to Improve Construction Productivity,Publication No. 240-311, University of Texas at Austin. Austin, Texas: Construction Industry Institute.
    • (2008) RT-240 Leveraging Technology to Improve Construction Productivity, Publication No. , pp. 240-311
  • 5
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
    • DOI 10.1016/j.autcon.2006.07.004, PII S0926580506000574
    • Ergen, E., Akinci, B., & Sacks, R. (2007). Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS. Automation in Construction, 16 (3), 354-367. (Pubitemid 46205287)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 7
    • 0032664468 scopus 로고    scopus 로고
    • Materials management: The key to successful project management
    • Kini, D. (1999). Materials Management: The Key to Successful Project Management. Journal of Managment in Engineering, 30-34.
    • (1999) Journal of Managment in Engineering , pp. 30-34
    • Kini, D.1
  • 13
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998). Pull-Driven Scheduling for Pipe Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Managment, 124 (4), 279-288.
    • (1998) Journal of Construction Engineering and Managment , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.