-
2
-
-
33846372659
-
Productivity of Egyptian temporary labor in excavation work
-
Refaat H. Abdel-Razek Productivity of Egyptian temporary labor in excavation work Journal of the Egyptian Society of Engineers 43 3 2004 3 8
-
(2004)
Journal of the Egyptian Society of Engineers
, vol.43
, Issue.3
, pp. 3-8
-
-
Abdel-Razek, R.H.1
-
3
-
-
0028393273
-
Action-response model and loss of productivity in construction
-
David W. Halligan, Laura A. Demsetz, James D. Brown, and Clark B. Pace Action-response model and loss of productivity in construction Journal of Construction Engineering and Management, ASCE 120 1 1994 47 64
-
(1994)
Journal of Construction Engineering and Management, ASCE
, vol.120
, Issue.1
, pp. 47-64
-
-
Halligan, D.W.1
Demsetz, L.A.2
Brown, J.D.3
Pace, C.B.4
-
5
-
-
0025694102
-
Modeling construction labor productivity
-
Randolph H. Thomas, William F. Maloney, R. Malcolm, W. Horner, Gray R. Smith, Vir K. Handa, and Steve R. Sanders Modeling construction labor productivity Journal of Construction Engineering and Management, ASCE 116 4 1990 705 726
-
(1990)
Journal of Construction Engineering and Management, ASCE
, vol.116
, Issue.4
, pp. 705-726
-
-
Thomas, R.H.1
Maloney, W.F.2
Malcolm, R.3
Horner, W.4
Smith, G.R.5
Handa, V.K.6
Sanders, S.R.7
-
6
-
-
84859422648
-
-
Pennsylvania Transportation Institute, The Pennsylvania State University, Transportation Research Building, March
-
Randolph H. Thomas, Principles of Construction Labor Productivity Measurement and Processing, Report Number PTI 2K14, Pennsylvania Transportation Institute, The Pennsylvania State University, Transportation Research Building, March, 2000, pp. 1-54.
-
(2000)
Principles of Construction Labor Productivity Measurement and Processing, Report Number PTI 2K14
, pp. 1-54
-
-
Randolph, H.T.1
-
15
-
-
84859424676
-
-
thesis presented to Alexandria University, in partial fulfillment of the requirements for the degree of Master of Science
-
Hesham Ahmed Ibrahim, Construction Labor Productivity under Different Effects" thesis presented to Alexandria University, in partial fulfillment of the requirements for the degree of Master of Science, 1997.
-
(1997)
Construction Labor Productivity under Different Effects
-
-
Ahmed Ibrahim, H.1
-
16
-
-
34247339111
-
Improving productivity of tiling operations: A case study
-
Ain Shams University, Egyptian Society of Engineers and Canadian Society for Civil Engineers, Cairo, Egypt, 14-21 April
-
Abdel-Hady Hosny, Refaat H. Abdel-Razek, Nadia Elyamany, Improving productivity of tiling operations: a case study. in: Proceedings of the International Colloquium on Structural Engineering, Ain Shams University, Egyptian Society of Engineers and Canadian Society for Civil Engineers, Cairo, Egypt, 14-21 April 1992, pp. 397-407.
-
(1992)
Proceedings of the International Colloquium on Structural Engineering
, pp. 397-407
-
-
Hosny, A.1
Abdel-Razek, R.H.2
Elyamany, N.3
-
18
-
-
84859424076
-
Construction Manpower Productivity: State-of-the-Art Concepts
-
Alexandria University, in partial fulfillment of the requirements for the degree of Master of Engineering
-
Khaled M. El-Gohary, Mostafa E. Shehata, Construction Manpower Productivity: State-of-the-Art Concepts, Techniques of Measurement and Improvement" thesis presented to the Faculty of Engineering, Alexandria University, in partial fulfillment of the requirements for the degree of Master of Engineering, 2009.
-
(2009)
Techniques of Measurement and Improvement" Thesis Presented to the Faculty of Engineering
-
-
El-Gohary, K.M.1
Shehata, M.E.2
-
19
-
-
81855224797
-
Work flow variation and labor productivity: Case study
-
Min Liu, Glenn Ballard, and William Ibbs Work flow variation and labor productivity: case study Journal of Management in Engineering, ASCE 27 4 2011 236 242
-
(2011)
Journal of Management in Engineering, ASCE
, vol.27
, Issue.4
, pp. 236-242
-
-
Liu, M.1
Ballard, G.2
Ibbs, W.3
|