Amelco Electric v. City of Thousand Oaks, 27 Cal. 4th 228, 115 Cal. Rptr. 2d 900, 38 P.3d 1120, rehearing denied by 2002 Cal. LEXIS 1689 (March 13)
-
Amelco Electric v. City of Thousand Oaks, 27 Cal. 4th 228, 115 Cal. Rptr. 2d 900, 38 P.3d 1120, rehearing denied by 2002 Cal. LEXIS 1689 (March 13, 2002).
-
(2002)
-
-
-
2
-
-
77955322746
-
-
The Appeal of Coates Industrial Piping, Inc., VABCA No. 5412 (July 26)
-
The Appeal of Coates Industrial Piping, Inc., VABCA No. 5412 (July 26, 1999).
-
(1999)
-
-
-
3
-
-
77955317934
-
-
The Appeal of Gulf Coast Trading Co., ENGBCA No. 5795
-
The Appeal of Gulf Coast Trading Co., ENGBCA No. 5795 (1994).
-
(1994)
-
-
-
4
-
-
77955318586
-
-
The Appeal of P. J. Dick, Inc., VABCA Nos. 6080-6082, 01-2 BCA (CCH) (September 27)
-
The Appeal of P. J. Dick, Inc., VABCA Nos. 6080-6082, 01-2 BCA (CCH) (September 27, 2001).
-
(2001)
-
-
-
5
-
-
33845785874
-
-
Association for the Advancement of Cost Engineering (AACE) International, Inc AACE International Recommended Practice No. 25R-03, Morgantown, W.Va
-
Association for the Advancement of Cost Engineering (AACE) International, Inc. (2004). " Estimating lost labor productivity in construction claims.." AACE International Recommended Practice No. 25R-03, Morgantown, W.Va.
-
(2004)
Estimating Lost Labor Productivity in Construction Claims
-
-
-
6
-
-
77955341442
-
-
Atlas Constr. Co., Inc., GSBCA No. 8593, 90-1 B.C.A (CCH)
-
Atlas Constr. Co., Inc., GSBCA No. 8593, 90-1 B.C.A (CCH) (1990).
-
(1990)
-
-
-
7
-
-
77955310282
-
-
Bell BCI Co. v. United States, No. 03-1613C, 81 Fed. Cl. 617 (April 21)
-
Bell BCI Co. v. United States, No. 03-1613C, 81 Fed. Cl. 617 (April 21, 2008).
-
(2008)
-
-
-
8
-
-
77955322600
-
-
C. Norman Peterson Co. v. Container Cor, 172 Cal. A3d 628, 218 Cal. Rptr. 592
-
C. Norman Peterson Co. v. Container Corp., 172 Cal. App. 3d 628, 218 Cal. Rptr. 592 (1985).
-
(1985)
-
-
-
9
-
-
77955338391
-
-
Centex Bateson Construction Co., VABCA No. 4613, 99-1 BCA 30,153, at 149,259
-
Centex Bateson Construction Co., VABCA No. 4613, 99-1 BCA 30,153, at 149,259 (1998).
-
(1998)
-
-
-
10
-
-
77955326680
-
-
Central Mechanical Constr., ASBCA No. 29434, 86-3 BCA (CCH)
-
Central Mechanical Constr., ASBCA No. 29434, 86-3 BCA (CCH) (1986).
-
(1986)
-
-
-
11
-
-
77955338698
-
-
Charles G. Williams Constr., Inc., ASBCA No. 33766, 89-2 B.C.A, CCH
-
Charles G. Williams Constr., Inc., ASBCA No. 33766, 89-2 B.C.A, CCH (1989).
-
(1989)
-
-
-
12
-
-
77955337249
-
-
Clark Concrete Contractors, Inc. v. General Services Administration, GSBCA No. 14340, 99-1 BCA (CCH)
-
Clark Concrete Contractors, Inc. v. General Services Administration, GSBCA No. 14340, 99-1 BCA (CCH) (1999).
-
(1999)
-
-
-
13
-
-
77955333572
-
-
The Clark Construction Group, Inc., VABCA No. 5674, 00-1 B.C.A (April 5)
-
The Clark Construction Group, Inc., VABCA No. 5674, 00-1 B.C.A (April 5, 2000).
-
(2000)
-
-
-
14
-
-
77955312269
-
-
Coley Properties Cor v. United States, 593 F.2d 380
-
Coley Properties Corp. v. United States, 593 F.2d 380 (1979).
-
(1979)
-
-
-
15
-
-
77955339760
-
-
David J. Tiernay, GSBCA Nos. 7107, 6198, 88-2 BCA. (CCH)
-
David J. Tiernay, GSBCA Nos. 7107, 6198, 88-2 BCA. (CCH) (1988).
-
(1988)
-
-
-
16
-
-
77955335898
-
-
Dawson Constr. Co., VABCA Nos. 3306-3310, 93-3 BCA. (CCH) (), affirmed, 34 F.3d 1080 (Fed. Cir. 1994)
-
Dawson Constr. Co., VABCA Nos. 3306-3310, 93-3 BCA. (CCH) (1993), affirmed, 34 F.3d 1080 (Fed. Cir. 1994).
-
(1993)
-
-
-
17
-
-
77955335046
-
-
Dyson & Co., ASBCA No. 21673, 78-2 BCA, CCH
-
Dyson & Co., ASBCA No. 21673, 78-2 BCA, CCH (1978).
-
(1978)
-
-
-
18
-
-
77955321752
-
-
Electronics & Missile Facilities v. United States, 416 F.2d 1345 (Ct. Cl.)
-
Electronics & Missile Facilities v. United States, 416 F.2d 1345 (Ct. Cl. 1969).
-
(1969)
-
-
-
19
-
-
77955332486
-
-
Freeman-Darling, Inc., GSBCA No. 7112 (April 27)
-
Freeman-Darling, Inc., GSBCA No. 7112 (April 27, 1989).
-
(1989)
-
-
-
20
-
-
77955328879
-
-
Fru-Con Constr. Cor v. United States, 43 Fed. Cl. 306 (Ct. Cl.)
-
Fru-Con Constr. Corp. v. United States, 43 Fed. Cl. 306 (Ct. Cl. 1999).
-
(1999)
-
-
-
21
-
-
0242494806
-
Baseline determination in construction labor productivity-loss claims
-
DOI 10.1061/(ASCE)0742-597X(2003)19:4(160)
-
Gulezian, R., and Samelian, F. (2003). " Baseline determination in construction labor productivity-loss claims.." J. Manage. Eng. JMENEA 0742-597X, 19 (4), 160-165. 10.1061/(ASCE)0742-597X(2003)19:4(160) (Pubitemid 40329312)
-
(2003)
Journal of Management in Engineering
, vol.19
, Issue.4
, pp. 160-165
-
-
Gulezian, R.1
Samelian, F.2
-
22
-
-
33845773765
-
-
Research Report 158-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex
-
Hanna, A. S. (2001). " Quantifying the cumulative impact of change orders or electrical and mechanical contractors.." Research Report 158-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(2001)
Quantifying the Cumulative Impact of Change Orders or Electrical and Mechanical Contractors
-
-
Hanna, A.S.1
-
23
-
-
11344268966
-
Quantitative impacts of project change
-
Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex
-
Ibbs, C. W., and Allen, W. E. (1995). " Quantitative impacts of project change.." Source Document 108, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(1995)
Source Document 108
-
-
Ibbs, C.W.1
Allen, W.E.2
-
24
-
-
29044440796
-
Improved measured mile analysis technique
-
DOI 10.1061/(ASCE)0733-9364(2005)131:12(1249)
-
Ibbs, W., and Liu, M. (2005). " Improved measured mile analysis technique.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (12), 1249-1256. 10.1061/(ASCE)0733-9364(2005)131:12(1249) (Pubitemid 41788462)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.12
, pp. 1249-1256
-
-
Ibbs, W.1
Liu, M.2
-
25
-
-
33845801312
-
Quantified impacts of project change
-
DOI 10.1061/(ASCE)1052-3928(2007)133:1(45)
-
Ibbs, W., Nguyen, L. D., and Lee, S. (2007). " Quantified impacts of project change.." J. Profl. Issues Eng. Educ. Pract. JPEPE3 1052-3928, 133 (1), 45-52. 10.1061/(ASCE)1052-3928(2007)133:1(45) (Pubitemid 44975068)
-
(2007)
Journal of Professional Issues in Engineering Education and Practice
, vol.133
, Issue.1
, pp. 45-52
-
-
Ibbs, W.1
Nguyen, L.D.2
Lee, S.3
-
26
-
-
77955329248
-
-
James Corporation d/b/a James Construction v. North Allegheny School District, et al., No. 1268 C.D. 2007 (Pa. Comwlth. November 30)
-
James Corporation d/b/a James Construction v. North Allegheny School District, et al., No. 1268 C.D. 2007 (Pa. Comwlth. November 30, 2007).
-
(2007)
-
-
-
27
-
-
27744591034
-
Update on proving and pricing inefficiency claims
-
ZZZZZZ 0272-0116
-
Jones, R. M. (2003). " Update on proving and pricing inefficiency claims.." Constr. Lawyer ZZZZZZ 0272-0116, 23 (Summer), 3-11.
-
(2003)
Constr. Lawyer
, vol.23
, Issue.SUMMER
, pp. 3-11
-
-
Jones, R.M.1
-
29
-
-
77955311078
-
-
Litton Systems, Inc., Ingalls Shipbuilding Division, ASBCA No. 17578, 78-1 B.C.A, CCH
-
Litton Systems, Inc., Ingalls Shipbuilding Division, ASBCA No. 17578, 78-1 B.C.A, CCH (1978).
-
(1978)
-
-
-
30
-
-
29044446463
-
Getting the most out of your measured mile' approach
-
CIEGAG 0009-7853
-
Loulakis, M. C., and Santiago, S. J. (1999). " Getting the most out of your measured mile' approach.." Civ. Eng. (N.Y.) CIEGAG 0009-7853, 69 (11), 69.
-
(1999)
Civ. Eng. (N.Y.)
, vol.69
, Issue.11
, pp. 69
-
-
Loulakis, M.C.1
Santiago, S.J.2
-
31
-
-
77955314580
-
Distinguishing quantum meruit and unjust enrichment in the construction setting
-
0015-3915
-
McConnell, H. H. (1997). " Distinguishing quantum meruit and unjust enrichment in the construction setting.." The Florida Bar Journal, 71 (3), 88. 0015-3915
-
(1997)
The Florida Bar Journal
, vol.71
, Issue.3
, pp. 88
-
-
McConnell, H.H.1
-
32
-
-
77955310608
-
-
Pittman Constr. Co. v. United States, 2 Cl. Ct. 211
-
Pittman Constr. Co. v. United States, 2 Cl. Ct. 211 (1983).
-
(1983)
-
-
-
33
-
-
77955315740
-
-
Rice v. United States, 317 U.S. 61, 64-65
-
Rice v. United States, 317 U.S. 61, 64-65 (1942).
-
(1942)
-
-
-
34
-
-
77955335735
-
-
Southwest Marine, Inc., DOT BCA No. 1663, 94-3 BCA, CCH
-
Southwest Marine, Inc., DOT BCA No. 1663, 94-3 BCA, CCH (1994).
-
(1994)
-
-
-
35
-
-
77955329878
-
-
State ex rel. Dept. of Trans v. Guy F. Atkinson Co., 187 Cal. A3d 25, 231 Cal. Rptr. 382
-
State ex rel. Dept. of Transp. v. Guy F. Atkinson Co., 187 Cal. App. 3d 25, 231 Cal. Rptr. 382 (1986).
-
(1986)
-
-
-
36
-
-
14744282331
-
Quantification of losses caused by labor inefficiencies: Where is the elusive measured mile?
-
ZZZZZZ 1526-159X
-
Thomas, H. R., and Sanvido, V. E. (2000). " Quantification of losses caused by labor inefficiencies: Where is the elusive measured mile? " Constr. Law Bus. ZZZZZZ 1526-159X, 1 (3), 1-14.
-
(2000)
Constr. Law Bus.
, vol.1
, Issue.3
, pp. 1-14
-
-
Thomas, H.R.1
Sanvido, V.E.2
-
37
-
-
0344240116
-
Construction baseline productivity: Theory and practice
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:5(295)
-
Thomas, H. R., and Završki, I. (1999). " Construction baseline productivity: Theory and practice.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (5), 295-303. 10.1061/(ASCE)0733-9364(1999)125:5(295)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 295-303
-
-
Thomas, H.R.1
Završki, I.2
-
38
-
-
77955327184
-
-
Triax Co. v. United States, 28 Fed. Cl. 733
-
Triax Co. v. United States, 28 Fed. Cl. 733 (1993).
-
(1993)
-
-
-
39
-
-
77955319479
-
-
Watt Plumbing, Air Conditioning & Elec., Inc. v. Tulsa Rig, Reel & Mfg. Co., 533 P.2d 980, 983 (Su Ct. Okla.)
-
Watt Plumbing, Air Conditioning & Elec., Inc. v. Tulsa Rig, Reel & Mfg. Co., 533 P.2d 980, 983 (Sup. Ct. Okla. 1975).
-
(1975)
-
-
-
40
-
-
0022702177
-
The measured mile: Proving construction inefficiency costs
-
COENDE 0378-3839
-
Zink, D. A. (1986). " The measured mile: Proving construction inefficiency costs.." Coastal Eng. COENDE 0378-3839, 28 (4), 19-21.
-
(1986)
Coastal Eng.
, vol.28
, Issue.4
, pp. 19-21
-
-
Zink, D.A.1
|