-
1
-
-
33947215449
-
Costs in relation to production runs
-
Staunton RE (1947) Costs in relation to production runs. NACA Bull 28(18):1117-1127
-
(1947)
NACA Bull
, vol.28
, Issue.18
, pp. 1117-1127
-
-
Staunton, R.E.1
-
2
-
-
0030189476
-
Determination of the optimal production run and the most profitable process mean for a production process
-
Chen SL, Chung KJ (1996) Determination of the optimal production run and the most profitable process mean for a production process. Int J Prod Res 34(7):2051-2058
-
(1996)
Int J Prod Res
, vol.34
, Issue.7
, pp. 2051-2058
-
-
Chen, S.L.1
Chung, K.J.2
-
3
-
-
0026820547
-
Optimal tool replacement with nondecreasing tool wear
-
Jeang A, Yang K (1992) Optimal tool replacement with nondecreasing tool wear. Int J Prod Res 30(2):299-314
-
(1992)
Int J Prod Res
, vol.30
, Issue.2
, pp. 299-314
-
-
Jeang, A.1
Yang, K.2
-
4
-
-
0001769328
-
Optimal control of processes subject to linear trends
-
Gibra IN (1967) Optimal control of processes subject to linear trends. J Ind Eng 18(1):35-41
-
(1967)
J Ind Eng
, vol.18
, Issue.1
, pp. 35-41
-
-
Gibra, I.N.1
-
5
-
-
0031648198
-
A generalized economic model for joint determination of production run, inspection schedule and control chart design
-
Rahim MA, Ben-Daya M (1998) A generalized economic model for joint determination of production run, inspection schedule and control chart design. Int J Prod Res 36(1):277-289
-
(1998)
Int J Prod Res
, vol.36
, Issue.1
, pp. 277-289
-
-
Rahim, M.A.1
Ben-Daya, M.2
-
6
-
-
0000311361
-
Optimal production run for a process with random linear drift
-
Rahim MA, Banerjee PK (1988) Optimal production run for a process with random linear drift. Omega 16(4):347-351
-
(1988)
Omega
, vol.16
, Issue.4
, pp. 347-351
-
-
Rahim, M.A.1
Banerjee, P.K.2
-
7
-
-
0031161828
-
Variance reduction in a process with random linear drift
-
Al-Sultan KS, Al-Fawzan MA (1997) Variance reduction in a process with random linear drift. Int J Prod Res 35(6):1523-1533
-
(1997)
Int J Prod Res
, vol.35
, Issue.6
, pp. 1523-1533
-
-
Al-Sultan, K.S.1
Al-Fawzan, M.A.2
-
8
-
-
0031553157
-
An extension of Rahim and Banerjee's model for a process with upper and lower specification limits
-
Al-Sultan KS, Al-Fawzan MA (1997) An extension of Rahim and Banerjee's model for a process with upper and lower specification limits. Int J Prod Econ 53:265-280
-
(1997)
Int J Prod Econ
, vol.53
, pp. 265-280
-
-
Al-Sultan, K.S.1
Al-Fawzan, M.A.2
-
9
-
-
0024622482
-
Optimal control of a linear trend process with quadratic loss
-
Drezner Z, Wesolowsky GO (1989) Optimal control of a linear trend process with quadratic loss. IIE Trans 21(1):66-72
-
(1989)
IIE Trans
, vol.21
, Issue.1
, pp. 66-72
-
-
Drezner, Z.1
Wesolowsky, G.O.2
-
10
-
-
0030168581
-
Optimal tool replacement with asymmetric quadratic loss
-
Makis V (1996) Optimal tool replacement with asymmetric quadratic loss. IIE Trans 28:463-466
-
(1996)
IIE Trans
, vol.28
, pp. 463-466
-
-
Makis, V.1
-
11
-
-
0035518406
-
Optimal control of a deteriorating process with a quadratic loss function
-
Al-Fawzan MA, Rahim MA (2001) Optimal control of a deteriorating process with a quadratic loss function. Qual Reliab Eng Int 17:459-466
-
(2001)
Qual Reliab Eng Int
, vol.17
, pp. 459-466
-
-
Al-Fawzan, M.A.1
Rahim, M.A.2
-
12
-
-
0035340520
-
Optimal production run length and inspection schedules in a deteriorating production process
-
Kim CH, Hong Y, Chang SY (2001) Optimal production run length and inspection schedules in a deteriorating production process. IIE Trans 33(5):421-426
-
(2001)
IIE Trans
, vol.33
, Issue.5
, pp. 421-426
-
-
Kim, C.H.1
Hong, Y.2
Chang, S.Y.3
-
13
-
-
84950942108
-
Cost savings due to variance reduction in a canning process
-
Golhar DY, Pollock SM (1992) Cost savings due to variance reduction in a canning process. IIE Trans 24(1):89-92
-
(1992)
IIE Trans
, vol.24
, Issue.1
, pp. 89-92
-
-
Golhar, D.Y.1
Pollock, S.M.2
-
14
-
-
0005132854
-
Optimal process variance under Taguchi loss
-
Samar KM, Chakraborty D (1995) Optimal process variance under Taguchi loss. Int J Qual Reliab Manage 12(9):14-29
-
(1995)
Int J Qual Reliab Manage
, vol.12
, Issue.9
, pp. 14-29
-
-
Samar, K.M.1
Chakraborty, D.2
-
15
-
-
0344210953
-
The determination of mean and/or variance shifts with artificial neural networks
-
Dedeakayogullari I, Burnak N (1999) The determination of mean and/or variance shifts with artificial neural networks. Int J Prod Res 37(10):2191-2200
-
(1999)
Int J Prod Res
, vol.37
, Issue.10
, pp. 2191-2200
-
-
Dedeakayogullari, I.1
Burnak, N.2
-
16
-
-
0009335447
-
Joint determination of the optimum target mean and variance of a process
-
Rahim MA, Al-Sultan KS (2000) Joint determination of the optimum target mean and variance of a process. J Qual Maint Eng 6(3):192-199
-
(2000)
J Qual Maint Eng
, vol.6
, Issue.3
, pp. 192-199
-
-
Rahim, M.A.1
Al-Sultan, K.S.2
|