-
1
-
-
36849023499
-
Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
-
DOI 10.1016/j.ejor.2006.07.044, PII S0377221706008320
-
C. Andrés, C. Miralles, and R. Pastor Balancing and scheduling tasks in assembly lines with sequence-dependent setup times European Journal of Operational Research 187 3 2008 1212 1223 (Pubitemid 350236632)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1212-1223
-
-
Andres, C.1
Miralles, C.2
Pastor, R.3
-
2
-
-
0011765006
-
Calibration of GA parameters: The design of experiments approach
-
T.P. Bagchi, and K. Deb Calibration of GA parameters: The design of experiments approach Computer Science and Informatics 26 3 1996 46 56
-
(1996)
Computer Science and Informatics
, vol.26
, Issue.3
, pp. 46-56
-
-
Bagchi, T.P.1
Deb, K.2
-
3
-
-
78650268610
-
Meta-heuristics to solve single-machine scheduling problem with sequence-dependent setup time and deteriorating jobs
-
10.1007/s00170-010-2526-5
-
U. Bahalke, A.M. Yolmeh, and K. Shahanaghi Meta-heuristics to solve single-machine scheduling problem with sequence-dependent setup time and deteriorating jobs International Journal of Advanced Manufacturing Technology 50 2010 749 759 10.1007/s00170-010-2526-5
-
(2010)
International Journal of Advanced Manufacturing Technology
, vol.50
, pp. 749-759
-
-
Bahalke, U.1
Yolmeh, A.M.2
Shahanaghi, K.3
-
4
-
-
0027675494
-
Balancing two-sided assembly lines: A case study
-
J.J. Bartholdi Balancing two-sided assembly lines: A case study International Journal of Production Research 31 1993 2447 2461 (Pubitemid 23708903)
-
(1993)
International Journal of Production Research
, vol.31
, Issue.10
, pp. 2447-2461
-
-
Bartholdi, J.J.1
-
5
-
-
0022768294
-
Survey of exact algorithms for the simple assembly line balancing problem
-
I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 1986 909 932 (Pubitemid 16612186)
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars Ilker1
-
6
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
-
C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 2006 694 715 (Pubitemid 41336587)
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
7
-
-
67349130287
-
Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure
-
C. Becker, and A. Scholl Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure European Journal of Operational Research 199 2009 359 374
-
(2009)
European Journal of Operational Research
, vol.199
, pp. 359-374
-
-
Becker, C.1
Scholl, A.2
-
8
-
-
34249995941
-
A classification of assembly line balancing problems
-
DOI 10.1016/j.ejor.2006.10.010, PII S0377221706010435
-
N. Boysen, M. Fliedner, and A. Scholl A classification of assembly line balancing problems European Journal of Operational Research 183 2007 674 693 (Pubitemid 46891133)
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 674-693
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
9
-
-
0016027179
-
Assembly line balancing with multiple Stations
-
G.M. Buxey Assembly line balancing with multiple Stations Management Science 20 1974 1010 1021
-
(1974)
Management Science
, vol.20
, pp. 1010-1021
-
-
Buxey, G.M.1
-
11
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
E. Erel, and S. Sarin A survey of the assembly line balancing procedures Production Planning and Control 9 1998 414 434 (Pubitemid 128624333)
-
(1998)
Production Planning and Control
, vol.9
, Issue.5
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
12
-
-
0022911689
-
On methods for generating random partial orders
-
DOI 10.1016/0167-6377(86)90066-0
-
W. Gehrlein On methods for generating random partial orders Operations Research Letters 5 6 1986 285 291 (Pubitemid 17533137)
-
(1986)
Operations Research Letters
, vol.5
, Issue.6
, pp. 285-291
-
-
Gehrlein William, V.1
-
13
-
-
0346009089
-
Improved genetic algorithm for the permutation flowshop scheduling problem
-
DOI 10.1016/S0305-0548(03)00016-9
-
SK. Iyer, and B. Saxena Improved genetic algorithm for the permutation flowshop scheduling problem Computers & Operations Research 31 2004 593 606 (Pubitemid 38098445)
-
(2004)
Computers and Operations Research
, vol.31
, Issue.4
, pp. 593-606
-
-
Iyer, S.K.1
Saxena, B.2
-
15
-
-
74549129380
-
Heuristic procedures for solving the general assembly line balancing problem with setups
-
L. Martino, and R. Pastor Heuristic procedures for solving the general assembly line balancing problem with setups International Journal of Production Research 46 6 2010 1787 1804
-
(2010)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1787-1804
-
-
Martino, L.1
Pastor, R.2
-
18
-
-
0020781916
-
Assembly line balancing with processing alternatives: An application
-
P.A. Pinto, D.G. Dannenbring, and B.M. Khumawala Assembly line balancing with processing alternatives: An application Management Science 29 1983 817 830
-
(1983)
Management Science
, vol.29
, pp. 817-830
-
-
Pinto, P.A.1
Dannenbring, D.G.2
Khumawala, B.M.3
-
20
-
-
12344285964
-
Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
-
DOI 10.1016/j.ejor.2004.01.022, PII S0377221704000529
-
R. Ruiz, C. Maroto, and J. Alcaraz Solving the flowshop scheduling problem with sequence-dependent setup times using advanced metaheuristics European Journal of Operational Research 165 2005 34 54 (Pubitemid 40135592)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.1
, pp. 34-54
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
21
-
-
30044449841
-
Two new robust genetic algorithms for the flowshop scheduling problem
-
DOI 10.1016/j.omega.2004.12.006, PII S0305048305000174
-
R. Ruiz, C. Maroto, and J. Alcaraz Two new robust genetic algorithms for the flowshop scheduling problem Omega 34 2006 461 476 (Pubitemid 43046058)
-
(2006)
Omega
, vol.34
, Issue.5
, pp. 461-476
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
23
-
-
25144482035
-
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
-
DOI 10.1016/j.ejor.2004.07.022, PII S0377221704004795, Balancing Assembly and Transfer Lines
-
A. Scholl, and C. Becker State-of-the-art exact and heuristic solution procedures for simple assembly line balancing European Journal of Operational Research 168 2006 666 693 (Pubitemid 41336586)
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 666-693
-
-
Scholl, A.1
Becker, C.2
-
24
-
-
43449085514
-
The sequence-dependent assembly line balancing problem
-
A. Scholl, N. Boysen, and M. Fliedner The sequence-dependent assembly line balancing problem OR Spectrum 30 2008 579 609
-
(2008)
OR Spectrum
, vol.30
, pp. 579-609
-
-
Scholl, A.1
Boysen, N.2
Fliedner, M.3
-
25
-
-
84858701728
-
The assembly line balancing and scheduling problem with sequence-dependent setup times: Problem extension, model formulation and efficient heuristics
-
FSU Jena
-
Scholl, A.; Boysen, N.; Fliedner, M. (2009). The assembly line balancing and scheduling problem with sequence-dependent setup times: Problem extension, model formulation and efficient heuristics. Jena Research Papers in Business and Economics 11/2009, FSU Jena.
-
(2009)
Jena Research Papers in Business and Economics 11/2009
-
-
Scholl, A.1
Boysen, N.2
Fliedner, M.3
-
27
-
-
78649835376
-
A simulated annealing algorithm for balancing the assembly line type 2 problem with sequence-dependent setup times between tasks
-
10.1080/00207540903471486
-
S.A. Seyed-Alagheband, S.M.T. FatemiGhomi, and M. Zandieh A simulated annealing algorithm for balancing the assembly line type 2 problem with sequence-dependent setup times between tasks International Journal of Production Research 49 3 2011 805 825 10.1080/00207540903471486
-
(2011)
International Journal of Production Research
, vol.49
, Issue.3
, pp. 805-825
-
-
Seyed-Alagheband, S.A.1
Fatemighomi, S.M.T.2
Zandieh, M.3
-
29
-
-
69749084638
-
Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem
-
10.1016/j.omega.2009.04.002
-
E. Vallada, and R. Ruiz Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem Omega 38 2010 57 67 10.1016/j.omega.2009.04.002
-
(2010)
Omega
, vol.38
, pp. 57-67
-
-
Vallada, E.1
Ruiz, R.2
-
30
-
-
0020116655
-
Assembly line balancing as generalized bin packing
-
T.S. Wee, and M.J. Magazine Assembly line balancing as generalized bin packing Operations Research Letters 1 1982 56 58
-
(1982)
Operations Research Letters
, vol.1
, pp. 56-58
-
-
Wee, T.S.1
Magazine, M.J.2
|