-
1
-
-
0030408029
-
Railroad capacity and traffic analysis using SIMON
-
R. Bergmark Railroad capacity and traffic analysis using SIMON J. Allan C.A. Brebbia R.J. Hill G. Sciutto Computers in Railways V 1996 WIT Press Ashurst, UK 183 191
-
(1996)
, pp. 183-191
-
-
Bergmark, R.1
-
2
-
-
0003939480
-
Introduction to Stochastic Programming
-
J.R. Birge F. Louveaux Introduction to Stochastic Programming 1997 Springer New York
-
(1997)
-
-
Birge, J.R.1
Louveaux, F.2
-
3
-
-
0031594060
-
Optimizing scheduled times, allowing for behavioural response
-
M. Carey Optimizing scheduled times, allowing for behavioural response Transportation Research Part B 32 5 1998 329 342
-
(1998)
Transportation Research Part B
, vol.32
, Issue.5
, pp. 329-342
-
-
Carey, M.1
-
4
-
-
0032885173
-
Ex ante heuristic measures of schedule reliability
-
M. Carey Ex ante heuristic measures of schedule reliability Transportation Research Part B 33 7 1999 473 494
-
(1999)
Transportation Research Part B
, vol.33
, Issue.7
, pp. 473-494
-
-
Carey, M.1
-
5
-
-
4544241843
-
Advanced railway planning using Max-Plus algebra
-
A.F. de Kort Advanced railway planning using Max-Plus algebra J. Allan C.A. Brebbia R.J. Hill G. Sciutto Computers in Railways VII 2000 WIT Press Ashurst, UK 257 266
-
(2000)
, pp. 257-266
-
-
de Kort, A.F.1
-
7
-
-
0032259192
-
The max-plus algebra approach to railway timetable design
-
R.M.P. Goverde The max-plus algebra approach to railway timetable design B. Mellitt R.J. Hill J. Allan G. Sciutto C.A. Brebbia Computers in Railways VI 1998 WIT Press Ashurst, UK 339 350
-
(1998)
, pp. 339-350
-
-
Goverde, R.M.P.1
-
8
-
-
85120277163
-
-
Goverde, R.M.P., 2005. Punctuality of railway operations and timetable stability analysis. Ph.D. Thesis, Technical University Delft.
-
-
-
-
9
-
-
85120261685
-
-
Goverde, R.M.P., Hooghiemstra, G., Lopuhaa, H.P., 2001. Statistical analysis of train traffic: the Eindhoven Case. TRAIL Studies in Transportation Science, S2001/1, TRAIL Research School, Delft.
-
-
-
-
10
-
-
0031597057
-
Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling
-
S.F. Hallowell P.T. Harker Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling Transportation Research Part A 32 6 1998 279 295
-
(1998)
Transportation Research Part A
, vol.32
, Issue.6
, pp. 279-295
-
-
Hallowell, S.F.1
Harker, P.T.2
-
12
-
-
0032206316
-
Modelling train delays in urban networks
-
A. Higgins E. Kozan Modelling train delays in urban networks Transportation Science 32 4 1998 346 357
-
(1998)
Transportation Science
, vol.32
, Issue.4
, pp. 346-357
-
-
Higgins, A.1
Kozan, E.2
-
14
-
-
0035263422
-
Running times on railway sections with heterogeneous train traffic
-
T. Huisman R.J. Boucherie Running times on railway sections with heterogeneous train traffic Transportation Research Part B 35 2001 271 292
-
(2001)
Transportation Research Part B
, vol.35
, pp. 271-292
-
-
Huisman, T.1
Boucherie, R.J.2
-
15
-
-
85120289563
-
-
Hürlimann, D., 2001. Objektorientierte Modellierung von Infrastrukturelementen und Betriebsvorgängen im Eisenbahnwesen. Ph.D. Thesis, ETH Zürich, (in German).
-
-
-
-
16
-
-
21844526971
-
Probabilistic bounds (via large deviations) for the solutions of stochastic programming problems
-
Y.M. Kaniovski A.J. King R.J.-B. Wets Probabilistic bounds (via large deviations) for the solutions of stochastic programming problems Annals of Operations Research 56 1995 189 208
-
(1995)
Annals of Operations Research
, vol.56
, pp. 189-208
-
-
Kaniovski, Y.M.1
King, A.J.2
Wets, R.J.-B.3
-
17
-
-
0001659305
-
Asymptotic theory for solutions in statistical estimations and Stochastic Programming
-
A.J. King T. Rockafellar Asymptotic theory for solutions in statistical estimations and Stochastic Programming Mathematics of Operations Research 18 1993 148 162
-
(1993)
Mathematics of Operations Research
, vol.18
, pp. 148-162
-
-
King, A.J.1
Rockafellar, T.2
-
18
-
-
0036013019
-
The sample average approximation method for stochastic discrete optimization
-
A.J. Kleywegt A. Shapiro T. Homem-de-Mello The sample average approximation method for stochastic discrete optimization SIAM Journal on Optimization 12 2 2001 479 502
-
(2001)
SIAM Journal on Optimization
, vol.12
, Issue.2
, pp. 479-502
-
-
Kleywegt, A.J.1
Shapiro, A.2
Homem-de-Mello, T.3
-
19
-
-
27144517715
-
VirtuOS: Simulieren von Bahnbetrieb
-
H. König VirtuOS: Simulieren von Bahnbetrieb Betrieb und Verkehr 50 1–2 2001 44 47 (in German)
-
(2001)
Betrieb und Verkehr
, vol.50
, Issue.1–2
, pp. 44-47
-
-
König, H.1
-
20
-
-
44249086435
-
Cyclic railway timetabling: a stochastic optimisation approach
-
L.G. Kroon R. Dekker M.J.C.M. Vromans Cyclic railway timetabling: a stochastic optimisation approach F. Geraets L.G. Kroon A. Schöbel D. Wagner C. Zaroliagis Algorithmic Methods in Railway Optimization Lecture Notes in Computer Science vol. 4359 2007 Springer 41 66
-
(2007)
, pp. 41-66
-
-
Kroon, L.G.1
Dekker, R.2
Vromans, M.J.C.M.3
-
21
-
-
85120255178
-
-
Liebchen, Ch., 2006. Periodic timetable optimization in public transport. Ph.D. Thesis, Technical University Berlin, Berlin.
-
-
-
-
22
-
-
85120245643
-
-
Linderoth, J.T., Shapiro, A., Wright, S.J., 2002. The empirical behavior of sampling methods for stochastic programming. Optimization Technical Report 02-01. University of Wisconsin-Madison.
-
-
-
-
23
-
-
0345097656
-
Train network simulator for support of network wide planning of infrastructure and timetables
-
D. Middelkoop M. Bouwman Train network simulator for support of network wide planning of infrastructure and timetables J. Allan C.A. Brebbia R.J. Hill G. Sciutto Computers in Railways VII 2000 WIT Press Ashurst, UK 267 276
-
(2000)
, pp. 267-276
-
-
Middelkoop, D.1
Bouwman, M.2
-
24
-
-
0012700693
-
Periodic network optimization with different arc frequencies
-
K. Nachtigall Periodic network optimization with different arc frequencies Discrete Applied Mathematics 69 1996 1 17
-
(1996)
Discrete Applied Mathematics
, vol.69
, pp. 1-17
-
-
Nachtigall, K.1
-
25
-
-
85120245946
-
-
Peeters, L.W.P., 2003. Cyclic railway timetable optimization. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam School of Management.
-
-
-
-
26
-
-
0020128317
-
A structured model for rail line simulation and optimization
-
E.R. Petersen A.J. Taylor A structured model for rail line simulation and optimization Transportation Science 18 1982 192 206
-
(1982)
Transportation Science
, vol.18
, pp. 192-206
-
-
Petersen, E.R.1
Taylor, A.J.2
-
27
-
-
85120273804
-
-
Retel Helmrich, M.J., 2006. Improving robustness of a railway timetable through stochastic optimisation of supplementary times. M.Sc. Thesis, Erasmus University Rotterdam, Rotterdam School of Economics.
-
-
-
-
28
-
-
0004020933
-
Simulation
-
S.M. Ross Simulation third ed. 2002 Academic Press San Diego
-
(2002)
-
-
Ross, S.M.1
-
29
-
-
85120256541
-
-
Rudolph, R., 2004. Entwicklung von Strategieen zur optimierten Anordnung und Dimensionierung von Zeitzuschlägen im Eisenbahnbetrieb. Ph.D. Thesis, Universität Hannover (in German).
-
-
-
-
32
-
-
0034550507
-
On the rate of convergence of optimal solutions of Monte Carlo approximations of stochastic programs
-
A. Shapiro T. Homem-de-Mello On the rate of convergence of optimal solutions of Monte Carlo approximations of stochastic programs SIAM Journal on Optimization 11 1 2000 70 86
-
(2000)
SIAM Journal on Optimization
, vol.11
, Issue.1
, pp. 70-86
-
-
Shapiro, A.1
Homem-de-Mello, T.2
-
33
-
-
4544292765
-
PETER, a performance evaluator for railway timetables
-
G. Soto y Koelemeijer A.R. Iounoussov R.M.P. Goverde R.J. van Egmond PETER, a performance evaluator for railway timetables J. Allan C.A. Brebbia R.J. Hill G. Sciutto Computers in Railways VII 2000 WIT Press Ashurst, UK 405 414
-
(2000)
, pp. 405-414
-
-
Soto y Koelemeijer, G.1
Iounoussov, A.R.2
Goverde, R.M.P.3
van Egmond, R.J.4
-
34
-
-
85120263255
-
-
U.I.C. Timetable recovery margins to guarantee timekeeping – recovery margins. Leaflet 451-1 (2000) U.I.C., Paris, France.
-
-
-
-
35
-
-
85120266161
-
-
Vromans, M.J.C.M., 2005. Reliability of railway systems. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam School of Management.
-
-
-
-
36
-
-
0030396273
-
Simulation models: important aids for Banverket’s planning process
-
M. Wahlborg Simulation models: important aids for Banverket’s planning process J. Allan C.A. Brebbia R.J. Hill G. Sciutto Computers in Railways V 1996 WIT Press Ashurst, UK 175 181
-
(1996)
, pp. 175-181
-
-
Wahlborg, M.1
-
37
-
-
85120256620
-
-
Wakob, H., 1985. Ableitung eines generellen Wartemodells zur Ermittlung der planmässigen Wartezeiten im Eisenbahnbetrieb unter besonderer Berücksichtigung der Aspekte Leistungsfähigkeit und Anlagebelastung. Ph.D. Thesis, Verkehrwissenschaftlichen Institut, RWTH Aachen (in German).
-
-
-
-
38
-
-
33748684041
-
Verspätungsübertragungen in Fernverkehrsnetzen
-
W. Weigand Verspätungsübertragungen in Fernverkehrsnetzen Eisenbahntechnische Rundschau 30 1981 915 920 (in German)
-
(1981)
Eisenbahntechnische Rundschau
, vol.30
, pp. 915-920
-
-
Weigand, W.1
-
39
-
-
85120254582
-
-
Yuan, J., 2006. Stochastic modelling of train delays and delay propagation in stations. Ph.D. Thesis, Technical University Delft.
-
-
-
|