-
1
-
-
0000816725
-
Branch-and-price: column generation for solving huge integer programs
-
C Barnhart EL Johnson GL Nemhauser MWP Savelsbergh PH Vance 1998 Branch-and-price: column generation for solving huge integer programs Oper Res 46 316 329 Barnhart C, Johnson EL, Nemhauser GL, Savelsbergh MWP, Vance PH (1998) Branch-and-price: column generation for solving huge integer programs. Oper Res 46:316–329
-
(1998)
Oper Res
, vol.46
, pp. 316-329
-
-
Barnhart, C1
Johnson, EL2
Nemhauser, GL3
Savelsbergh, MWP4
Vance, PH5
-
2
-
-
85121082940
-
-
Borndörfer R, Grötschel M, Lukac S, Mitusch K, Schlechte T, Schultz S, Tanner A (2005) An auctioning approach to railway slot allocation. ZIB Technical Report ZR-05-45
-
-
-
-
3
-
-
0032203470
-
Allocation of scarce track capacity using Lagrangian relaxation
-
U Brännlund PO Lindberg A Nöu JE Nilsson 1998 Allocation of scarce track capacity using Lagrangian relaxation Transp Sci 32 358 369 10.1287/trsc.32.4.358 Brännlund U, Lindberg PO, Nöu A, Nilsson JE (1998) Allocation of scarce track capacity using Lagrangian relaxation. Transp Sci 32:358–369
-
(1998)
Transp Sci
, vol.32
, pp. 358-369
-
-
Brännlund, U1
Lindberg, PO2
Nöu, A3
Nilsson, JE4
-
4
-
-
0028436769
-
A fast heuristic for the train scheduling problem
-
X Cai CJ Goh 1994 A fast heuristic for the train scheduling problem Comput Oper Res 21 499 510 10.1016/0305-0548(94)90099-X Cai X, Goh CJ (1994) A fast heuristic for the train scheduling problem. Comput Oper Res 21:499–510
-
(1994)
Comput Oper Res
, vol.21
, pp. 499-510
-
-
Cai, X1
Goh, CJ2
-
5
-
-
0036759198
-
Modeling and solving the train timetabling problem
-
A Caprara M Fischetti P Toth 2002 Modeling and solving the train timetabling problem Oper Res 50 851 861 10.1287/opre.50.5.851.362 Caprara A, Fischetti M, Toth P (2002) Modeling and solving the train timetabling problem. Oper Res 50:851–861
-
(2002)
Oper Res
, vol.50
, pp. 851-861
-
-
Caprara, A1
Fischetti, M2
Toth, P3
-
6
-
-
85121074837
-
-
A Caprara L Kroon M Monaci M Peeters P Toth 2006 Passenger railway optimization C Barnhart G Laporte Handbooks in operations research and management science, vol 14 Elsevier Amsterdam 129 187 Caprara A, Kroon L, Monaci M, Peeters M, Toth P (2006) Passenger railway optimization. In: Barnhart C, Laporte G (eds) Handbooks in operations research and management science, vol 14. Elsevier, Amsterdam, pp 129–187
-
-
-
-
7
-
-
33644594453
-
A Lagrangian heuristic approach to real-world train timetabling problems
-
A Caprara M Monaci P Toth PL Guida 2006 A Lagrangian heuristic approach to real-world train timetabling problems Disc Appl Math 154 738 753 10.1016/j.dam.2005.05.026 Caprara A, Monaci M, Toth P, Guida PL (2006) A Lagrangian heuristic approach to real-world train timetabling problems. Disc Appl Math 154:738–753
-
(2006)
Disc Appl Math
, vol.154
, pp. 738-753
-
-
Caprara, A1
Monaci, M2
Toth, P3
Guida, PL4
-
8
-
-
0029236610
-
A model, algorithms and strategy for train pathing
-
M Carey D Lockwood 1995 A model, algorithms and strategy for train pathing J Oper Res Soc 46 988 1005 10.1038/sj/jors/0460806 Carey M, Lockwood D (1995) A model, algorithms and strategy for train pathing. J Oper Res Soc 46:988–1005
-
(1995)
J Oper Res Soc
, vol.46
, pp. 988-1005
-
-
Carey, M1
Lockwood, D2
-
9
-
-
0031234257
-
Heuristic techniques for single line train scheduling
-
A Higgings E Kozan L Ferreira 1997 Heuristic techniques for single line train scheduling J Heuristics 3 43 62 10.1023/A:1009672832658 Higgings A, Kozan E, Ferreira L (1997) Heuristic techniques for single line train scheduling. J Heuristics 3:43–62
-
(1997)
J Heuristics
, vol.3
, pp. 43-62
-
-
Higgings, A1
Kozan, E2
Ferreira, L3
-
10
-
-
0026104713
-
Tactical scheduling of rail operations: the SCAN I system
-
D Jovanovic PT Harker 1991 Tactical scheduling of rail operations: the SCAN I system Transp Sci 25 46 64 Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46–64
-
(1991)
Transp Sci
, vol.25
, pp. 46-64
-
-
Jovanovic, D1
Harker, PT2
-
11
-
-
0043207353
-
A variable trip time model for cyclic railway timetabling
-
LG Kroon LWP Peeters 2003 A variable trip time model for cyclic railway timetabling Transp Sci 37 198 212 10.1287/trsc.37.2.198.15247 Kroon LG, Peeters LWP (2003) A variable trip time model for cyclic railway timetabling. Transp Sci 37:198–212
-
(2003)
Transp Sci
, vol.37
, pp. 198-212
-
-
Kroon, LG1
Peeters, LWP2
-
12
-
-
85121075830
-
-
Liebchen C, Proksch M, Wagner FH (2004) Performance of algorithms for periodic timetable optimization. TU Preprint 021/2004, TU Berlin Computer-aided transit scheduling. Lecture notes in economics and mathematical systems. Springer, Berlin (to appear)
-
-
-
-
13
-
-
85121085958
-
-
Lindner T (2000) Train schedule optimization in public rail transport. Ph.D. Thesis, University of Technology, Braunschweig
-
-
-
-
14
-
-
27844497911
-
Cost optimal periodic train scheduling
-
T Lindner UT Zimmermann 2005 Cost optimal periodic train scheduling Math Methods Oper Res 62 281 295 10.1007/s00186-005-0001-0 Lindner T, Zimmermann UT (2005) Cost optimal periodic train scheduling. Math Methods Oper Res 62:281–295
-
(2005)
Math Methods Oper Res
, vol.62
, pp. 281-295
-
-
Lindner, T1
Zimmermann, UT2
-
15
-
-
0030412990
-
A constraint generation algorithm for the construction of periodic railway timetables
-
M Odijk 1996 A constraint generation algorithm for the construction of periodic railway timetables Transp Res 30 455 464 10.1016/0191-2615(96)00005-7 Odijk M (1996) A constraint generation algorithm for the construction of periodic railway timetables. Transp Res 30:455–464
-
(1996)
Transp Res
, vol.30
, pp. 455-464
-
-
Odijk, M1
-
16
-
-
85121077313
-
-
E. Oliveira and B.M. Smith, “A Job-Shop Scheduling Model for the Single-Track Railway Scheduling Problem ”, Technical Report 2000.21, School of Computing Research Report, University of Leeds, 2000.
-
-
-
-
17
-
-
85121083775
-
-
Peeters LWP (2003) Cyclic railway timetable optimization. Ph.D. Thesis, Erasmus Research Institute of Management, Erasmus University, Rotterdam
-
-
-
-
18
-
-
85121062507
-
-
LWP Peeters LG Kroon 2001 A cycle based optimization model for the cyclic railway timetabling problem J Daduna S Voss Computer-aided transit scheduling, lecture notes in economics and mathematical systems, vol 505 Springer Berlin 275 296 Peeters LWP, Kroon LG (2001) A cycle based optimization model for the cyclic railway timetabling problem. In: Daduna J, Voss S (eds) Computer-aided transit scheduling, lecture notes in economics and mathematical systems, vol 505. Springer, Berlin, pp 275–296
-
-
-
-
19
-
-
0008917539
-
A mathematical model for periodic event scheduling problems
-
P Serafini W Ukovich 1989 A mathematical model for periodic event scheduling problems SIAM J Disc Math 2 550 581 10.1137/0402049 Serafini P, Ukovich W (1989) A mathematical model for periodic event scheduling problems. SIAM J Disc Math 2:550–581
-
(1989)
SIAM J Disc Math
, vol.2
, pp. 550-581
-
-
Serafini, P1
Ukovich, W2
-
20
-
-
85121082096
-
-
Schrijver A, Steenbeek A (1994) Timetable construction for railned. Technical Report, CWI, Amsterdam (in Dutch)
-
-
-
-
21
-
-
85121072860
-
-
B Szpigel 1973 Optimal train scheduling on a single track railway M Ross OR’72 North-Holland Amsterdam 343 351 Szpigel B (1973) Optimal train scheduling on a single track railway. In: Ross M (ed) OR’72. North-Holland, Amsterdam, pp 343–351
-
-
-
|