Volumn 101, Issue , 2012, Pages 59-66

Integrating production, inventory and maintenance planning for a parallel system with dependent components

Author keywords

Common cause; Economic dependence; Integration; Minimal repair; Parallel systems; Preventive maintenance; Production planning

Indexed keywords

BACKORDERS; COMMON CAUSE; COMMON CAUSE FAILURE; FACTOR MODEL; FINITE PLANNING HORIZON; GROUP MAINTENANCE; HOLDING COSTS; LOT SIZING; MAINTENANCE PLANNING; MINIMAL REPAIR; MULTIPLE COMPONENTS; NUMERICAL EXAMPLE; PARALLEL COMPONENT; PARALLEL SYSTEM; PERFORMING MAINTENANCE; PERIODIC GROUPS; PREVENTIVE AND CORRECTIVE MAINTENANCE; PRODUCTION COST; PRODUCTION PLANNING; PRODUCTION SYSTEM; SETUP COSTS; SINGLE COMPONENTS; SYSTEM FAILURES;

EID: 84857265449     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2012.02.001     Document Type: Article
Times cited : (99)

References (27)
  • 1
    • 0033198250 scopus 로고    scopus 로고
    • Integrating maintenance and production decisions in a hierarchical production planning environment
    • DOI 10.1016/S0305-0548(99)00022-2, PII S0305054899000222
    • L. Weinstein, and C.H. Chung Integrating maintenance and production decisions in a hierarchical production planning environment Computers and Operations Research 26 1011 1999 1059 1074 (Pubitemid 29346433)
    • (1999) Computers and Operations Research , vol.26 , Issue.10-11 , pp. 1059-1074
    • Weinstein, L.1    Chung, C.-H.2
  • 2
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1109/TR.2005.845967
    • C.R. Cassady, and E. Kutanoglu Integrating preventive maintenance planning and production scheduling for a single machine IEEE Transactions on Reliability 54 2 2005 304 309 (Pubitemid 41005032)
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 3
    • 33947276768 scopus 로고    scopus 로고
    • An integrated production and preventive maintenance planning model
    • DOI 10.1016/j.ejor.2006.06.032, PII S0377221706004693
    • E.H. Aghezzaf, M.A. Jamali, and D. Ait-Kadi An integrated production and preventive maintenance planning model European Journal of Operational Research 181 2 2007 679 685 (Pubitemid 46420747)
    • (2007) European Journal of Operational Research , vol.181 , Issue.2 , pp. 679-685
    • Aghezzaf, E.H.1    Jamali, M.A.2    Ait-Kadi, D.3
  • 4
    • 44849093491 scopus 로고    scopus 로고
    • Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system
    • A. Chelbi, N. Rezg, and M. Radhoui Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system Journal of Quality in Maintenance Engineering 14 2 2008 161 176
    • (2008) Journal of Quality in Maintenance Engineering , vol.14 , Issue.2 , pp. 161-176
    • Chelbi, A.1    Rezg, N.2    Radhoui, M.3
  • 5
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problems
    • A. Berrichi, L. Amoedo, F. Yalaoui, E. Chatelet, and M. Mezghiche Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problems Journal of Intelligent Manufacturing 20 2009 389 400
    • (2009) Journal of Intelligent Manufacturing , vol.20 , pp. 389-400
    • Berrichi, A.1    Amoedo, L.2    Yalaoui, F.3    Chatelet, E.4    Mezghiche, M.5
  • 6
    • 77956339995 scopus 로고    scopus 로고
    • An integrated model for production and preventive maintenance planning in multi-state systems
    • M. Nourelfath, M.C. Fitouhi, and M. Machani An integrated model for production and preventive maintenance planning in multi-state systems IEEE Transactions on Reliability 59 3 2010 496 506
    • (2010) IEEE Transactions on Reliability , vol.59 , Issue.3 , pp. 496-506
    • Nourelfath, M.1    Fitouhi, M.C.2    MacHani, M.3
  • 8
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • DOI 10.1016/S0377-2217(01)00197-7, PII S0377221701001977
    • H. Wang A survey of maintenance policies of deteriorating systems European Journal of Operational Research 139 2002 469 489 (Pubitemid 34249626)
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 10
    • 0023452252 scopus 로고
    • Optimal group maintenance policies with continuous and periodic inspections
    • D. Assaf, and J.G. Shanthikumar Optimal group maintenance policies with continuous and periodic inspection Management Science 33 1987 1440 1452 (Pubitemid 18535976)
    • (1987) Management Science , vol.33 , Issue.1 , pp. 1440-1452
    • Assaf, D.1    Shanthikumar, G.J.2
  • 11
    • 0025434321 scopus 로고
    • Optimal m-failure policies with random repair time
    • DOI 10.1016/0167-6377(90)90019-2
    • J.G. Wilson, and A. Benmerzouga Optimal m-failure policies with random repair time Operations Research Letters 9 1990 203 209 (Pubitemid 20719853)
    • (1990) Operations Research Letters , vol.9 , Issue.3 , pp. 203-209
    • Wilson John, G.1    Benmerzouga Ali2
  • 12
    • 0001647606 scopus 로고
    • (m, T) group maintenance policies
    • P. Ritchken, and J.G. Wilson (m, T) group maintenance policies Management Science 36 1990 632 639
    • (1990) Management Science , vol.36 , pp. 632-639
    • Ritchken, P.1    Wilson, J.G.2
  • 13
    • 0018767815 scopus 로고
    • Further results of replacement problem of a parallel system in random environment
    • T. Nakagawa Further results on replacement problem of a parallel system in a random environment Journal of Applied Probability 16 1979 923 926 (Pubitemid 10457238)
    • (1979) Journal of Applied Probability , vol.16 , Issue.4 , pp. 923-926
    • Nakagawa, T.1
  • 14
    • 0036735040 scopus 로고    scopus 로고
    • Treatment of general dependencies in system fault-tree and risk analysis
    • J.K. Vaurio Treatment of general dependencies in system fault-tree and risk analysis IEEE Transactions on Reliability 51 2002 278 287
    • (2002) IEEE Transactions on Reliability , vol.51 , pp. 278-287
    • Vaurio, J.K.1
  • 15
    • 0037226554 scopus 로고    scopus 로고
    • Common cause failure probabilities in standby safety system fault tree analysis with testing - Scheme and timing dependencies
    • J.K. Vaurio Common cause failure probabilities in standby safety system fault tree analysis with testing - scheme and timing dependencies Reliability Engineering and System Safety 79 2003 43 57
    • (2003) Reliability Engineering and System Safety , vol.79 , pp. 43-57
    • Vaurio, J.K.1
  • 16
    • 0037361658 scopus 로고    scopus 로고
    • Development of the DQFM method to consider the effect of correlation of component failures in seismic PSA of nuclear power plant
    • Y. Watanabe, T. Oikawa, and K. Muramatsu Development of the DQFM method to consider the effect of correlation of component failures in seismic PSA of nuclear power plant Reliability Engineering and System Safety 79 2003 265 279
    • (2003) Reliability Engineering and System Safety , vol.79 , pp. 265-279
    • Watanabe, Y.1    Oikawa, T.2    Muramatsu, K.3
  • 17
    • 0035720641 scopus 로고    scopus 로고
    • Incorporating common-cause failures into nonrepairable multistate series-parallel system analysis
    • DOI 10.1109/24.983398, PII S0018952901113539
    • G. Levitin Incorporating common-cause failures into non repairable multistate seriesparallel system analysis IEEE Transactions on Reliability 50 2001 380 388 (Pubitemid 34191856)
    • (2001) IEEE Transactions on Reliability , vol.50 , Issue.4 , pp. 380-388
    • Levitin, G.1
  • 18
    • 0242708898 scopus 로고    scopus 로고
    • On the effect of redundancy for systems with dependent components
    • S. Kotz, C.D. Lai, and M. Xie On the effect of redundancy for systems with dependent components IIE Transactions 35 2003 1103 1110
    • (2003) IIE Transactions , vol.35 , pp. 1103-1110
    • Kotz, S.1    Lai, C.D.2    Xie, M.3
  • 19
    • 0742307383 scopus 로고    scopus 로고
    • Optimization of replacement times using imperfect monitoring information
    • A. Barros, C. Bérenguer, and A. Grall Optimization of replacement times using imperfect monitoring information IEEE Transactions on Reliability 52 2003 523 533
    • (2003) IEEE Transactions on Reliability , vol.52 , pp. 523-533
    • Barros, A.1    Bérenguer, C.2    Grall, A.3
  • 20
    • 0036968625 scopus 로고    scopus 로고
    • Solving multi-item lot sizing problems with MIP solver using classification and reformulation
    • L.A. Wolsey Solving multi-item lot sizing problems with MIP solver using classification and reformulation Management Science 48 12 2002 1587 1602
    • (2002) Management Science , vol.48 , Issue.12 , pp. 1587-1602
    • Wolsey, L.A.1
  • 22
    • 0033117170 scopus 로고    scopus 로고
    • Joint redundancy and maintenance optimization for multistate seriesparallel systems
    • G. Levitin, and A. Lisnianski Joint redundancy and maintenance optimization for multistate seriesparallel systems Reliability Engineering & System Safety 64 1 1999 33 42
    • (1999) Reliability Engineering & System Safety , vol.64 , Issue.1 , pp. 33-42
    • Levitin, G.1    Lisnianski, A.2
  • 23
    • 0034135276 scopus 로고    scopus 로고
    • Optimization of imperfect preventive maintenance for multi-state systems
    • DOI 10.1016/S0951-8320(99)00067-8
    • G. Levitin, and A. Lisnianski Optimization of imperfect preventive maintenance for multi-state systems Reliability Engineering & System Safety 67 2 2000 193 203 (Pubitemid 32212610)
    • (2000) Reliability Engineering and System Safety , vol.67 , Issue.2 , pp. 193-203
    • Levitin, G.1    Lisnianski, A.2
  • 25
    • 70349448409 scopus 로고    scopus 로고
    • An approach to maintenance optimization where safety issues are important
    • J. Vatn, and T. Aven An approach to maintenance optimization where safety issues are important Reliability Engineering & System Safety 95 1 2010 58 63
    • (2010) Reliability Engineering & System Safety , vol.95 , Issue.1 , pp. 58-63
    • Vatn, J.1    Aven, T.2
  • 26
    • 4344630824 scopus 로고    scopus 로고
    • Dynamic modeling of the tradeoff between productivity and safety in critical engineering systems
    • M.M. Cowing, M.E. Paté-Cornell, and P.W. Glynn Dynamic modeling of the tradeoff between productivity and safety in critical engineering systems Reliability Engineering & System Safety 86 3 2004 269 284
    • (2004) Reliability Engineering & System Safety , vol.86 , Issue.3 , pp. 269-284
    • Cowing, M.M.1    Paté-Cornell, M.E.2    Glynn, P.W.3
  • 27
    • 0030105804 scopus 로고    scopus 로고
    • An overall model for maintenance optimization
    • DOI 10.1016/0951-8320(95)00055-0
    • J. Vatn, P. Hokstad, and L. Bodsberg An overall model for maintenance optimization Reliability Engineering & System Safety 51 3 1996 241 257 (Pubitemid 126349478)
    • (1996) Reliability Engineering and System Safety , vol.51 , Issue.3 , pp. 241-257
    • Vatn, J.1    Hokstad, P.2    Bodsberg, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.