메뉴 건너뛰기




Volumn 14, Issue 2, 2008, Pages 161-176

Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

Author keywords

Inventory; Lot size; Preventive maintenance; Quality

Indexed keywords

COMPUTER NETWORKS; MAINTENANCE; MANUFACTURE; PAPER; PRODUCTION ENGINEERING; PUBLIC POLICY;

EID: 44849093491     PISSN: 13552511     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552510810877665     Document Type: Article
Times cited : (47)

References (13)
  • 1
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben Daya, M. (2002), "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance", International Journal of Production Economics, No. 76, pp. 257-64.
    • (2002) International Journal of Production Economics , Issue.76 , pp. 257-64
    • Ben Daya, M.1
  • 2
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
    • Chelbi, A. and Ait-Kadi, D. (2004), "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance", European Journal of Operational Research, Vol. 156 No. 3, pp. 712-18.
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 712-18
    • Chelbi, A.1    Ait-Kadi, D.2
  • 3
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • Cheung, K.L. and Hausman, W.H. (1997), "Joint determination of preventive maintenance and safety stocks in an unreliable production environment", Naval Research Logistics, Vol. 44, pp. 257-72.
    • (1997) Naval Research Logistics , vol.44 , pp. 257-72
    • Cheung, K.L.1    Hausman, W.H.2
  • 4
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y. and Gershwin, S.B. (1992), "Manufacturing flow line systems: a review of models and analytical results", Queueing Systems, Vol. 12, pp. 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 5
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenevelt, H., Pintelon, L. and Seidman, A. (1992), "Production lot sizing with machine breakdowns", Management Science, Vol. 38 No. 1, pp. 104-23.
    • (1992) Management Science , vol.38 , Issue.1 , pp. 104-23
    • Groenevelt, H.1    Pintelon, L.2    Seidman, A.3
  • 6
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Hau, L., Meir, L. and Rosenblatt, J. (1987), "Simultaneous determination of production cycle and inspection schedules in a production system", Management Science, Vol. 33 No. 9, pp. 1125-36.
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-36
    • Hau, L.1    Meir, L.2    Rosenblatt, J.3
  • 7
    • 0031069214 scopus 로고    scopus 로고
    • Optimal lot sizing with regular maintenance interruptions
    • Moueen, K., Salameh, M. and Jaber, Y. (1996), "Optimal lot sizing with regular maintenance interruptions", Applied Mathematical Modelling, Vol. 21, pp. 85-90.
    • (1996) Applied Mathematical Modelling , vol.21 , pp. 85-90
    • Moueen, K.1    Salameh, M.2    Jaber, Y.3
  • 8
    • 0002895112 scopus 로고
    • Investing in new parameter values in the discounted EOQ model
    • Porteus, E.L. (1985), "Investing in new parameter values in the discounted EOQ model", Naval Research Logistics, Vol. 33, pp. 39-48.
    • (1985) Naval Research Logistics , vol.33 , pp. 39-48
    • Porteus, E.L.1
  • 9
    • 2442663120 scopus 로고    scopus 로고
    • Joint optimization of preventive maintenance and inventory control in a production line using simulation
    • Rezg, N., Xie, X. and Mati, Y. (2004), "Joint optimization of preventive maintenance and inventory control in a production line using simulation", International Journal of Production Research, Vol. 42 No. 10, pp. 2029-46.
    • (2004) International Journal of Production Research , vol.42 , Issue.10 , pp. 2029-46
    • Rezg, N.1    Xie, X.2    Mati, Y.3
  • 10
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production process
    • Rosenblatt, M. (1986), "Economic production cycles with imperfect production process", IIE Transactions, Vol. 18, pp. 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.1
  • 12
    • 0035546071 scopus 로고    scopus 로고
    • Optima control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
    • Tadashi, D., Hiroyuki, O. and Shunji, O. (2001), "Optima control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment", International Journal of Production Economics, Vol. 74, pp. 147-55.
    • (2001) International Journal of Production Economics , vol.74 , pp. 147-55
    • Tadashi, D.1    Hiroyuki, O.2    Shunji, O.3
  • 13
    • 0027342083 scopus 로고
    • Performance analysis of a transfer line with unreliable machines and finite buffers
    • Xie, X. (1993), "Performance analysis of a transfer line with unreliable machines and finite buffers", IIE Transactions, Vol. 25, pp. 99-108.
    • (1993) IIE Transactions , vol.25 , pp. 99-108
    • Xie, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.