메뉴 건너뛰기




Volumn 35, Issue 2-4, 2011, Pages 287-309

A review of the three most popular maintenance systems: How well is the energy sector represented?

Author keywords

CBM; Condition based maintenance; Energy sector; Literature review; RCM; Reliability centred maintenance; Total productive maintenance; TPM

Indexed keywords

CIRCUIT THEORY;

EID: 84857161955     PISSN: 09547118     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJGEI.2011.045024     Document Type: Review
Times cited : (18)

References (106)
  • 1
    • 4143106122 scopus 로고    scopus 로고
    • State of implementation of TPM in SMIs: A survey study in Malaysia
    • Ahmed, S., Hassan, M. and Taha, Z. (2004) 'State of implementation of TPM in SMIs: a survey study in Malaysia', Journal of Quality in Maintenance Engineering, Vol. 10, No. 2, pp.93-106.
    • (2004) Journal of Quality in Maintenance Engineering , vol.10 , Issue.2 , pp. 93-106
    • Ahmed, S.1    Hassan, M.2    Taha, Z.3
  • 2
    • 17744386725 scopus 로고    scopus 로고
    • TPM can go beyond maintenance: Excerpt from a case implementation
    • DOI 10.1108/13552510510589352
    • Ahmed, S., Hassan, M. and Taha, Z. (2005) 'TPM can go beyond maintenance: excerpt from a case implementation', Journal of Quality in Maintenance Engineering, Vol. 11, No. 1, pp.19-42. (Pubitemid 40574285)
    • (2005) Journal of Quality in Maintenance Engineering , vol.11 , Issue.1 , pp. 19-42
    • Ahmed, S.1    Hassan, M.Hj.2    Taha, Z.3
  • 3
    • 34848886094 scopus 로고    scopus 로고
    • An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise
    • DOI 10.1108/13552510710829443
    • Ahuja, I.P.S. and Khamba, J.S. (2007) 'An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise', Journal of Quality in Maintenance Engineering, Vol. 13, No. 4, pp.338-352. (Pubitemid 47511652)
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.4 , pp. 338-352
    • Ahuja, I.P.S.1    Khamba, J.S.2
  • 5
    • 44849098073 scopus 로고    scopus 로고
    • Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry
    • Ahuja, I.P.S. and Khamba, J.S. (2008b) 'Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry', Journal of Quality in Maintenance Engineering, Vol. 14, No. 2, pp.123-147.
    • (2008) Journal of Quality in Maintenance Engineering , vol.14 , Issue.2 , pp. 123-147
    • Ahuja, I.P.S.1    Khamba, J.S.2
  • 6
    • 38149094414 scopus 로고    scopus 로고
    • An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance
    • Ahuja, I.P.S. and Khamba, J.S. (2008c) 'An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance', International Journal of Quality & Reliability Management, Vol. 25, No. 2, pp.147-172.
    • (2008) International Journal of Quality & Reliability Management , vol.25 , Issue.2 , pp. 147-172
    • Ahuja, I.P.S.1    Khamba, J.S.2
  • 7
    • 44949247393 scopus 로고    scopus 로고
    • Justification of total productive maintenance initiatives in Indian manufacturing industry for achieving core competitiveness
    • Ahuja, I.P.S. and Khamba, J.S. (2008d) 'Justification of total productive maintenance initiatives in Indian manufacturing industry for achieving core competitiveness', Journal of Manufacturing Technology Management, Vol. 19, No. 5, pp.645-669.
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.5 , pp. 645-669
    • Ahuja, I.P.S.1    Khamba, J.S.2
  • 9
    • 70249150079 scopus 로고    scopus 로고
    • A case study of total productive maintenance implementation at precision tube mills
    • Ahuja, I.P.S. and Kumar, P. (2009) 'A case study of total productive maintenance implementation at precision tube mills', Journal of Quality in Maintenance Engineering, Vol. 15, No. 3, pp.241-258.
    • (2009) Journal of Quality in Maintenance Engineering , vol.15 , Issue.3 , pp. 241-258
    • Ahuja, I.P.S.1    Kumar, P.2
  • 10
    • 44349131399 scopus 로고    scopus 로고
    • Fresh grounds for improvement
    • Aiquang, L. (2007) 'Fresh grounds for improvement', Manufacturing Engineer, Vol. 86, No. 5, pp.24-27.
    • (2007) Manufacturing Engineer , vol.86 , Issue.5 , pp. 24-27
    • Aiquang, L.1
  • 11
    • 0442279095 scopus 로고    scopus 로고
    • The role of total productive maintenance in business excellence
    • 6
    • Al-Hassan, K., Chan, J. and Metcalfe, A. (2000) 'The role of total productive maintenance in business excellence', Total Quality Management, Vol. 11, Nos. 4/5/6, pp.596-601.
    • (2000) Total Quality Management , vol.11 , Issue.4-5 , pp. 596-601
    • Al-Hassan, K.1    Chan, J.2    Metcalfe, A.3
  • 12
    • 0030385467 scopus 로고    scopus 로고
    • Total quality maintenance: An approach for continuous reduction in costs of quality products
    • Al-Najjar, B. (1996) 'Total quality maintenance: an approach for continuous reduction in costs of quality products', Journal of Quality in Maintenance Engineering, Vol. 2, No. 3, pp.4-20.
    • (1996) Journal of Quality in Maintenance Engineering , vol.2 , Issue.3 , pp. 4-20
    • Al-Najjar, B.1
  • 13
    • 0037432505 scopus 로고    scopus 로고
    • Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    • Al-Najjar, B. and Alsyouf, I. (2003) 'Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making', International Journal of Production Economics, Vol. 84, No. 1, pp.85-100.
    • (2003) International Journal of Production Economics , vol.84 , Issue.1 , pp. 85-100
    • Al-Najjar, B.1    Alsyouf, I.2
  • 14
    • 0141988591 scopus 로고    scopus 로고
    • RCM introduction: Process and requirements management aspects
    • Backlund, F. and Akersten, P.A. (2003) 'RCM introduction: process and requirements management aspects', Journal of Quality in Maintenance Engineering, Vol. 9, No. 3, pp.250-264.
    • (2003) Journal of Quality in Maintenance Engineering , vol.9 , Issue.3 , pp. 250-264
    • Backlund, F.1    Akersten, P.A.2
  • 15
    • 0032688919 scopus 로고    scopus 로고
    • Factors affecting successful implementation of total productive maintenance: A UK manufacturing case study perspective
    • Bamber, C., Sharp, J. and Hides, M. (1999) 'Factors affecting successful implementation of total productive maintenance: a UK manufacturing case study perspective', Journal of Quality in Maintenance Engineering, Vol. 5, No. 3, pp.162-181.
    • (1999) Journal of Quality in Maintenance Engineering , vol.5 , Issue.3 , pp. 162-181
    • Bamber, C.1    Sharp, J.2    Hides, M.3
  • 16
    • 84986100055 scopus 로고    scopus 로고
    • Developing management systems towards integrated manufacturing: A case study perspective
    • Bamber, C., Sharp, J. and Hides, M. (2000) 'Developing management systems towards integrated manufacturing: a case study perspective', Integrated Manufacturing Systems, Vol. 11, No. 7, pp.454-461.
    • (2000) Integrated Manufacturing Systems , vol.11 , Issue.7 , pp. 454-461
    • Bamber, C.1    Sharp, J.2    Hides, M.3
  • 17
    • 9344257931 scopus 로고    scopus 로고
    • You may need RCM to enhance TPM implementation
    • Ben-Daya, M. (2000) 'You may need RCM to enhance TPM implementation', Journal of Quality in Maintenance Engineering, Vol. 6, No. 2, pp.82-85.
    • (2000) Journal of Quality in Maintenance Engineering , vol.6 , Issue.2 , pp. 82-85
    • Ben-Daya, M.1
  • 18
    • 0346707419 scopus 로고    scopus 로고
    • Field experience with a condition-based maintenance program of 20-kV XLPE distribution system using IRC-analysis
    • Birkner, P. (2004) 'Field experience with a condition-based maintenance program of 20-kV XLPE distribution system using IRC-analysis', IEEE Transactions on Power Delivery, Vol. 19, No. 1, pp.3-8.
    • (2004) IEEE Transactions on Power Delivery , vol.19 , Issue.1 , pp. 3-8
    • Birkner, P.1
  • 19
    • 0030681870 scopus 로고    scopus 로고
    • An enhanced approach for implementing total productive maintenance in the manufacturing environment
    • Blanchard, S. (1997) 'An enhanced approach for implementing total productive maintenance in the manufacturing environment', Journal of Quality in Maintenance Engineering, Vol. 3, No. 2, pp.69-80.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.2 , pp. 69-80
    • Blanchard, S.1
  • 22
    • 33645503310 scopus 로고    scopus 로고
    • An empirical study of lean production in the ceramic tile industry in Spain
    • DOI 10.1108/01443570610659883
    • Bonavia, T. and Martin, J. (2006) 'An empirical study of lean production in the ceramic tile industry in Spain', International Journal of Operations & Production Management, Vol. 26, No. 5, pp.505-531. (Pubitemid 43502365)
    • (2006) International Journal of Operations and Production Management , vol.26 , Issue.5 , pp. 505-531
    • Bonavia, T.1    Marin, J.A.2
  • 23
    • 2942555112 scopus 로고    scopus 로고
    • Relationship between total maintenance and performance
    • Brah, S.A. and Chong, W.K. (2004) 'Relationship between total maintenance and performance', International Journal of Production Research, Vol. 42, No. 12, pp.2383-2401.
    • (2004) International Journal of Production Research , vol.42 , Issue.12 , pp. 2383-2401
    • Brah, S.A.1    Chong, W.K.2
  • 24
    • 1542741117 scopus 로고    scopus 로고
    • Implementing total productive maintenance: A comparative study of the UK and Japanese foundry industries
    • Carannante, T., Haigh, R. and Morris, D. (1996) 'Implementing total productive maintenance: a comparative study of the UK and Japanese foundry industries', Total Quality Management, Vol. 7, No. 6, pp.605-611. (Pubitemid 126416311)
    • (1996) Total Quality Management , vol.7 , Issue.6 , pp. 605-611
    • Carannante, T.1    Haigh, R.H.2    Morris, D.S.3
  • 26
    • 2342525394 scopus 로고    scopus 로고
    • The status of maintenance management in UK manufacturing organisations: Results from a pilot survey
    • Cholasuke, C., Bhardwa, R. and Antong, J. (2004) 'The status of maintenance management in UK manufacturing organisations: results from a pilot survey', Journal of Quality in Maintenance Engineering, Vol. 10, No. 1, pp.5-15.
    • (2004) Journal of Quality in Maintenance Engineering , vol.10 , Issue.1 , pp. 5-15
    • Cholasuke, C.1    Bhardwa, R.2    Antong, J.3
  • 27
    • 30144435073 scopus 로고    scopus 로고
    • Managing the condition-based maintenance of a combined-cycle power plant: An approach using soft computing techniques
    • DOI 10.1016/j.jlp.2005.07.018, PII S0950423005001476
    • Ciarapica, F.E. and Giacchetta, G. (2006) 'Managing the condition-based maintenance of a combined-cycle power plant: an approach using soft computing techniques', Journal of Loss Prevention in the Process Industries, Vol. 19, No. 4, pp.316-325. (Pubitemid 43053163)
    • (2006) Journal of Loss Prevention in the Process Industries , vol.19 , Issue.4 , pp. 316-325
    • Ciarapica, F.E.1    Giacchetta, G.2
  • 28
    • 0031362970 scopus 로고    scopus 로고
    • Total productive maintenance practices: A survey in Italy
    • Cigolini, R. and Turco, F. (1997) 'Total productive maintenance practices: a survey in Italy', Journal of Quality in Maintenance Engineering, Vol. 3, No. 4, pp.259-272.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.4 , pp. 259-272
    • Cigolini, R.1    Turco, F.2
  • 29
    • 0348164729 scopus 로고    scopus 로고
    • Implementing TPM in plant maintenance: Some organisational barriers
    • Cooke, F.L. (2000) 'Implementing TPM in plant maintenance: some organisational barriers', International Journal of Quality & Reliability Management, Vol. 17, No. 9, pp.1003-1016.
    • (2000) International Journal of Quality & Reliability Management , vol.17 , Issue.9 , pp. 1003-1016
    • Cooke, F.L.1
  • 30
    • 0141988590 scopus 로고    scopus 로고
    • Plant maintenance strategy: Evidence from four british manufacturing firms
    • Cooke, F.L. (2003) 'Plant maintenance strategy: evidence from four British manufacturing firms', Journal of Quality in Maintenance Engineering, Vol. 9, No. 3, pp.239-249.
    • (2003) Journal of Quality in Maintenance Engineering , vol.9 , Issue.3 , pp. 239-249
    • Cooke, F.L.1
  • 32
    • 60249099120 scopus 로고    scopus 로고
    • Real-time turbine maintenance system
    • Chen, T-L. (2009) 'Real-time turbine maintenance system', Expert Systems with Applications, Vol. 36, No. 4, pp.8676-8681.
    • (2009) Expert Systems with Applications , vol.36 , Issue.4 , pp. 8676-8681
    • Chen, T.-L.1
  • 33
    • 0035501405 scopus 로고    scopus 로고
    • Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
    • DOI 10.1016/S0272-6963(01)00066-3, PII S0272696301000663
    • Cua, K., McKone, K. and Schroeder, R. (2001) 'Relationships between implementation of TQM, JIT, and TPM and manufacturing performance', Journal of Operations Management, Vol. 19, No. 6, pp.675-694. (Pubitemid 32935334)
    • (2001) Journal of Operations Management , vol.19 , Issue.6 , pp. 675-694
    • Cua, K.O.1    McKone, K.E.2    Schroeder, R.G.3
  • 34
    • 3543111420 scopus 로고    scopus 로고
    • Overall equipment effectiveness as a measure of operational improvement - A practical analysis
    • DOI 10.1108/01443570010355750
    • Dal, B., Tugwell, P. and Greatbanks, R. (2000) 'Overall equipment effectiveness as a measure of operational improvement: a practical analysis', International Journal of Operations & Production Management, Vol. 20, No. 12, pp.1488-1502. (Pubitemid 39025956)
    • (2000) International Journal of Operations and Production Management , vol.20 , Issue.12 , pp. 1488-1502
    • Dal, B.1    Tugwell, P.2    Greatbanks, R.3
  • 35
    • 0036641667 scopus 로고    scopus 로고
    • Application of RCM to a medium scale industry
    • DOI 10.1016/S0951-8320(02)00011-X, PII S095183200200011X
    • Deshpande, V. and Modak, J. (2002) 'Application of RCM to a medium scale industry', Reliability Engineering and System Safety, Vol. 77, No. 1, pp.31-43. (Pubitemid 34808398)
    • (2002) Reliability Engineering and System Safety , vol.77 , Issue.1 , pp. 31-43
    • Deshpande, V.S.1    Modak, J.P.2
  • 36
    • 0037399777 scopus 로고    scopus 로고
    • Maintenance strategy for tilting table of rolling mill based on reliability considerations
    • Deshpande, V. and Modak, J. (2003) 'Maintenance strategy for tilting table of rolling mill based on reliability considerations', Reliability Engineering and System Safety, Vol. 80, No. 1, pp.1-18.
    • (2003) Reliability Engineering and System Safety , vol.80 , Issue.1 , pp. 1-18
    • Deshpande, V.1    Modak, J.2
  • 38
    • 62349140135 scopus 로고    scopus 로고
    • Justification for the next generation of maintenance modelling techniques
    • Doyle, E., Lee, C-G. and Cho, D. (2009) 'Justification for the next generation of maintenance modelling techniques', Journal of the Operational Research Society, Vol. 60, No. 4, pp.461-470.
    • (2009) Journal of the Operational Research Society , vol.60 , Issue.4 , pp. 461-470
    • Doyle, E.1    Lee, C.-G.2    Cho, D.3
  • 39
    • 0031654333 scopus 로고    scopus 로고
    • Predictive maintenance techniques and their relevance to construction plant
    • Edwards, D.J., Holt, G.D. and Harris, F.C. (1998) 'Predictive maintenance techniques and their relevance to construction plant', Journal of Quality in Maintenance Engineering, Vol. 4, No. 1, pp.25-37.
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.1 , pp. 25-37
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 40
    • 0036284013 scopus 로고    scopus 로고
    • Practical application of RCM to local authority housing: A pilot study
    • DOI 10.1108/13552510210429992
    • El-Haram, M. and Horner, M. (2002) 'Practical application of RCM to local authority housing: a pilot study', Journal of Quality in Maintenance Engineering, Vol. 8, No. 2, pp.135-143. (Pubitemid 34697286)
    • (2002) Journal of Quality in Maintenance Engineering , vol.8 , Issue.2 , pp. 135-143
    • El-Haram, M.A.1    Horner, M.W.2
  • 41
    • 5044227167 scopus 로고    scopus 로고
    • Implementing total productive maintenance in Nigerian manufacturing industries
    • DOI 10.1016/j.apenergy.2004.01.007
    • Eti, M., Ogaji, S. and Probert, S. (2004) 'Implementing total productive maintenance in Nigerian manufacturing industries', Applied Energy, Vol. 79, No. 4, pp.385-401. (Pubitemid 39338376)
    • (2004) Applied Energy , vol.79 , Issue.4 , pp. 385-401
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 42
    • 22144480085 scopus 로고    scopus 로고
    • Maintenance schemes and their implementation for the Afam Thermal-Power Station
    • DOI 10.1016/j.apenergy.2004.10.011, PII S0306261904001758
    • Eti, M., Ogaji, S. and Probert, S. (2005) 'Maintenance schemes and their implementation for the Afam thermal-power station', Applied Energy, Vol. 82, No. 3, pp.255-265. (Pubitemid 40979641)
    • (2005) Applied Energy , vol.82 , Issue.3 , pp. 255-265
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 43
    • 28144457531 scopus 로고    scopus 로고
    • Strategic maintenance-management in Nigerian industries
    • DOI 10.1016/j.apenergy.2005.02.004, PII S0306261905000255
    • Eti, M., Ogaji, S. and Probert, S. (2006a) 'Strategic maintenance-management in Nigerian industries', Applied Energy, Vol. 83, No. 3, pp.211-227. (Pubitemid 41697703)
    • (2006) Applied Energy , vol.83 , Issue.3 , pp. 211-227
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 44
    • 33746126878 scopus 로고    scopus 로고
    • Development and implementation of preventive-maintenance practices in Nigerian industries
    • DOI 10.1016/j.apenergy.2006.01.001, PII S0306261906000031
    • Eti, M., Ogaji, S. and Probert, S. (2006b) 'Development and implementation of preventive-maintenance practices in Nigerian industries', Applied Energy, Vol. 83, No. 10, pp.1163-1179. (Pubitemid 44081967)
    • (2006) Applied Energy , vol.83 , Issue.10 , pp. 1163-1179
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 45
    • 33747480569 scopus 로고    scopus 로고
    • Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture
    • DOI 10.1016/j.apenergy.2006.01.002, PII S0306261906000079
    • Eti, M., Ogaji, S. and Probert, S. (2006c) 'Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture', Applied Energy, Vol. 83, No. 11, pp.1235-1248. (Pubitemid 44255801)
    • (2006) Applied Energy , vol.83 , Issue.11 , pp. 1235-1248
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 46
    • 33751055995 scopus 로고    scopus 로고
    • Integrating reliability, availability, maintainability and supportability with risk analysis for improved operation of the Afam thermal power-station
    • DOI 10.1016/j.apenergy.2006.05.001, PII S0306261906000675
    • Eti, M., Ogaji, S. and Probert, S. (2007) 'Integrating reliability, availability, maintainability and supportability with risk analysis for improved operation of the Afam thermal power-station', Applied Energy, Vol. 84, No. 2, pp.202-221. (Pubitemid 44754734)
    • (2007) Applied Energy , vol.84 , Issue.2 , pp. 202-221
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 47
    • 0036449680 scopus 로고    scopus 로고
    • TPM: Situation and procedure for a soft introduction in Italian factories
    • DOI 10.1108/09544780210447456
    • Ferrari, E., Pareschi, A., Persona, A. and Regattieri, A. (2002) 'TPM: situation and procedure for a soft introduction in Italian factories', The TQM Magazine, Vol. 14, No. 6, pp.350-358. (Pubitemid 35443135)
    • (2002) TQM Magazine , vol.14 , Issue.6 , pp. 350-358
    • Ferrari, E.1    Pareschi, A.2    Persona, A.3    Regattieri, A.4
  • 49
    • 33746931196 scopus 로고    scopus 로고
    • Maintenance management: Literature review and directions
    • DOI 10.1108/13552510610685075
    • Garg, A. and Deshmukh, S. (2006) 'Maintenance management: literature review and directions', Journal of Quality in Maintenance Engineering, Vol. 12, No. 3, pp.205-238. (Pubitemid 44200058)
    • (2006) Journal of Quality in Maintenance Engineering , vol.12 , Issue.3 , pp. 205-238
    • Garg, A.1    Deshmukh, S.G.2
  • 50
    • 33745482844 scopus 로고    scopus 로고
    • A risk-sensitive approach to total productive maintenance
    • DOI 10.1016/j.automatica.2006.02.006, PII S0005109806000999
    • Gosavi, A. (2006) 'A risk-sensitive approach to total productive maintenance', Automatica, Vol. 42, No. 8, pp.1321-1330. (Pubitemid 43962912)
    • (2006) Automatica , vol.42 , Issue.8 , pp. 1321-1330
    • Gosavi, A.1
  • 51
    • 33744509849 scopus 로고    scopus 로고
    • Managing commitment: increasing the odds for successful implementation of TQM, TPM or RCM
    • DOI 10.1108/02656710310500815
    • Hansson, J. and Backlund, F. and Lycke, L. (2003) 'Managing commitment: increasing the odds for successful implementation of TQM, TPM or RCM', International Journal of Quality & Reliability Management, Vol. 20, No. 9, pp.993-1008. (Pubitemid 37422306)
    • (2003) International Journal of Quality and Reliability Management , vol.20 , Issue.9 , pp. 993-1008
    • Hansson, J.1    Backlund, F.2    Lycke, L.3
  • 52
    • 0034813753 scopus 로고    scopus 로고
    • A study of total productive maintenance implementation
    • DOI 10.1108/13552510110404495
    • Ireland, F. and Dale, B. (2001) 'A study of total productive maintenance implementation', Journal of Quality in Maintenance Engineering, Vol. 7, No. 3, pp.183-191. (Pubitemid 32914604)
    • (2001) Journal of Quality in Maintenance Engineering , vol.7 , Issue.3 , pp. 183-191
    • Ireland, F.1    Dale, B.G.2
  • 53
    • 0030656766 scopus 로고    scopus 로고
    • Optimal replacement policy and the structure of software for condition-based maintenance
    • Jardine, A.K.S., Banjevic, D. and Makis, V. (1997) 'Optimal replacement policy and the structure of software for condition-based maintenance', Journal of Quality in Maintenance Engineering, Vol. 3, No. 2, pp.109-119.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.2 , pp. 109-119
    • Jardine, A.K.S.1    Banjevic, D.2    Makis, V.3
  • 55
  • 56
    • 0036904045 scopus 로고    scopus 로고
    • A prototype cost model of functional check decisions in reliability-centred maintenance
    • DOI 10.1057/palgrave.jors.2601453
    • Jia, X. and Christer, A. (2002) 'A prototype cost model of functional check decisions in reliability-centred maintenance', Journal of the Operational Research Society, Vol. 53, No. 12, pp.1380-1384. (Pubitemid 35468893)
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.12 , pp. 1380-1384
    • Jia, X.1    Christer, A.H.2
  • 58
    • 0031383801 scopus 로고    scopus 로고
    • The status of maintenance management in swedish manufacturing firms
    • Jonsson, P. (1997) 'The status of maintenance management in Swedish manufacturing firms', Journal of Quality in Maintenance Engineering, Vol. 3, No. 4, pp.233-258.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.4 , pp. 233-258
    • Jonsson, P.1
  • 60
    • 84857161909 scopus 로고
    • Plant and equipment effectiveness
    • January/February
    • Kennedy, R. (1994) 'Plant and equipment effectiveness', Maintenance Journal, January/February.
    • (1994) Maintenance Journal
    • Kennedy, R.1
  • 61
    • 0345759911 scopus 로고    scopus 로고
    • Lean manufacturing in temperature dependent processes with interruptions
    • Lee, W. and Allwood, J. (2003) 'Lean manufacturing in temperature dependent processes with interruptions', International Journal of Operations & Production Management, Vol. 23, No. 11, pp.1377-1400. (Pubitemid 38037947)
    • (2003) International Journal of Operations and Production Management , vol.23 , Issue.11-12 , pp. 1377-1400
    • Lee, W.L.1    Allwood, J.M.2
  • 62
    • 33749003757 scopus 로고    scopus 로고
    • Using principal components in a proportional hazards model with applications in condition-based maintenance
    • DOI 10.1057/palgrave.jors.2602058
    • Lin, D., Banjevic, D. and Jardine, A. (2006) 'Using principal components in a proportional hazards models with applications in condition-based maintenance', Journal of the Operational Research Society, Vol. 57, No. 8, pp.910-919. (Pubitemid 44447493)
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.8 , pp. 910-919
    • Lin, D.1    Banjevic, D.2    Jardine, A.K.S.3
  • 63
    • 33645505886 scopus 로고    scopus 로고
    • Utilizing advanced maintenance practices and information technology to achieve maximum equipment reliability
    • Liptrot, D. and Palarchio, G. (2000) 'Utilizing advanced maintenance practices and information technology to achieve maximum equipment reliability', International Journal of Quality & Reliability Management, Vol. 17, No. 8, pp.919-928.
    • (2000) International Journal of Quality & Reliability Management , vol.17 , Issue.8 , pp. 919-928
    • Liptrot, D.1    Palarchio, G.2
  • 64
    • 0032396016 scopus 로고    scopus 로고
    • Measurement of overall equipment effectiveness as a basis for TPM activities
    • Ljungberg, O. (1998) 'Measurement of overall equipment effectiveness as a basis for TPM activities', International Journal of Operations & Production Management, Vol. 18, No. 5, pp.495-507.
    • (1998) International Journal of Operations & Production Management , vol.18 , Issue.5 , pp. 495-507
    • Ljungberg, O.1
  • 66
    • 0442280145 scopus 로고    scopus 로고
    • Implementation of total productive maintenance in support of an established total quality programme
    • McAdam, R. and Duffner, A. (1996) 'Implementation of total productive maintenance in support of an established total quality programme', Total Quality Management, Vol. 7, No. 6, pp.613-630.
    • (1996) Total Quality Management , vol.7 , Issue.6 , pp. 613-630
    • McAdam, R.1    Duffner, A.2
  • 68
    • 4143095195 scopus 로고    scopus 로고
    • Implementation of proactive maintenance in the Egyptian glass company
    • Mostafa, S.I. (2004) 'Implementation of proactive maintenance in the Egyptian glass company', Journal of Quality in Maintenance Engineering, Vol. 10, No. 2, pp.107-122.
    • (2004) Journal of Quality in Maintenance Engineering , vol.10 , Issue.2 , pp. 107-122
    • Mostafa, S.I.1
  • 70
    • 33645522071 scopus 로고    scopus 로고
    • Twenty-first century maintenance organization: Part 1 - The asset management model
    • Applied Technology Publications, Barrington, IL
    • Moubray, J. (2003) 'Twenty-first century maintenance organization: part 1 - the asset management model', Maintenance Technology, Applied Technology Publications, Barrington, IL.
    • (2003) Maintenance Technology
    • Moubray, J.1
  • 73
    • 0031355991 scopus 로고    scopus 로고
    • Availability-based maintenance within an asset management programme
    • Organ, M., Whitehead, T. and Evans, M. (1997) 'Availability-based maintenance within an asset management programme', Journal of Quality in Maintenance Engineering, Vol. 3, No. 4, pp.221-232.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.4 , pp. 221-232
    • Organ, M.1    Whitehead, T.2    Evans, M.3
  • 74
    • 27644453641 scopus 로고    scopus 로고
    • Implementing the office total productive maintenance ("office TPM") program: A library case study
    • DOI 10.1108/00242530510611910
    • Patra, N., Tripathy, J. and Choudhary, B. (2005) 'Implementing the office total productive maintenance ('office TPM') program: a library case study', Library Review, Vol. 54, No. 7, pp.415-424. (Pubitemid 41548490)
    • (2005) Library Review , vol.54 , Issue.7 , pp. 415-424
    • Kanta, N.K.1    Tripathy, J.K.2    Choudhary, B.K.3
  • 75
    • 33747120545 scopus 로고    scopus 로고
    • An empirical investigation on the relationship between business and maintenance strategies
    • DOI 10.1016/j.ijpe.2004.12.024, PII S0925527305000216, Strategic Issues and Innovation in Production Economics
    • Pinjala, S., Pintelon, L. and Vereecke, A. (2006) 'An empirical investigation on the relationship between business and maintenance strategies', International Journal of Production Economics, Vol. 104, No. 1, pp.214-229. (Pubitemid 44223994)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 214-229
    • Pinjala, S.K.1    Pintelon, L.2    Vereecke, A.3
  • 77
    • 0030674968 scopus 로고    scopus 로고
    • A Petri-net based machine tool maintenance management system
    • Prickett, P. (1997) 'A Petri-net based machine tool maintenance management system', Industrial Management & Data Systems, Vol. 97, No. 4, pp.143-149. (Pubitemid 127490885)
    • (1997) Industrial Management and Data Systems , vol.97 , Issue.4 , pp. 143-149
    • Prickett, P.1
  • 78
    • 0032645116 scopus 로고    scopus 로고
    • An integrated approach to autonomous maintenance management
    • Prickett, P.W. (1999) 'An integrated approach to autonomous maintenance management', Integrated Manufacturing Systems, Vol. 10, No. 4, pp.233-242.
    • (1999) Integrated Manufacturing Systems , vol.10 , Issue.4 , pp. 233-242
    • Prickett, P.W.1
  • 79
    • 0036793777 scopus 로고    scopus 로고
    • From preventive to condition-based maintenance
    • Quinn, B. (2002) 'From preventive to condition-based maintenance', Pollution Engineering, Vol. 34, No. 8, pp.38-39.
    • (2002) Pollution Engineering , vol.34 , Issue.8 , pp. 38-39
    • Quinn, B.1
  • 80
    • 84857148852 scopus 로고    scopus 로고
    • Implementation of total productive manufacturing concept with reference to lean manufacturing in a processing industry in mysore: A practical approach
    • Ramesh, V., Sceenivasa Prasad, K. and Srinivas, T. (2008) 'Implementation of total productive manufacturing concept with reference to lean manufacturing in a processing industry in Mysore: a practical approach', The ICFAI University Journal of Operations Management, Vol. 7, No. 4, pp.45-57.
    • (2008) The ICFAI University Journal of Operations Management , vol.7 , Issue.4 , pp. 45-57
    • Ramesh, V.1    Prasad, S.2    Srinivas, K.T.3
  • 81
    • 1842713363 scopus 로고    scopus 로고
    • Survival to success: The case of RHP Bearings, Blackburn
    • Regan, S. and Dale, B. (1999) 'Survival to success: the case of RHP Bearings, Blackburn', The TQM Magazine, Vol. 11, No. 1, pp.22-28. (Pubitemid 129642877)
    • (1999) TQM Magazine , vol.11 , Issue.1 , pp. 22-28
    • Regan, S.1    Dale, B.G.2
  • 83
    • 33747881577 scopus 로고    scopus 로고
    • Analysis of the fall of TPM in companies
    • DOI 10.1016/j.jmatprotec.2006.03.102, PII S092401360600224X
    • Rodrigues, M. and Hatakeyama, K. (2006) 'Analysis of the fall of TPM in companies', Journal of Materials Processing Technology, Vol. 179, Nos. 1/2/3, pp.276-279. (Pubitemid 44293356)
    • (2006) Journal of Materials Processing Technology , vol.179 , Issue.1-3 , pp. 276-279
    • Rodrigues, M.1    Hatakeyama, K.2
  • 84
    • 18844432563 scopus 로고    scopus 로고
    • Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context
    • Seth, D. and Tripathi, D. (2005) 'Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context', International Journal of Quality & Reliability Management, Vol. 22, No. 3, pp.256-277.
    • (2005) International Journal of Quality & Reliability Management , vol.22 , Issue.3 , pp. 256-277
    • Seth, D.1    Tripathi, D.2
  • 85
    • 33748572917 scopus 로고    scopus 로고
    • A critical study of TQM and TPM approaches on business performance of Indian manufacturing industry
    • DOI 10.1080/14783360600595203, PII N40262L73R710186
    • Seth, D. and Tripathi, D. (2006) 'A critical study of TQM and TPM approaches on business performance of Indian manufacturing industry', Total Quality Management, Vol. 17, No. 7, pp.811-824. (Pubitemid 44373627)
    • (2006) Total Quality Management and Business Excellence , vol.17 , Issue.7 , pp. 811-824
    • Seth, D.1    Tripathi, D.2
  • 86
    • 25844519801 scopus 로고    scopus 로고
    • FLM to select suitable maintenance strategy in process industries using MISO model
    • DOI 10.1108/13552510510626981
    • Sharma, R., Kumar, D. and Kumar, P. (2005) 'FLM to select suitable maintenance strategy in process industries using MISO model', Journal of Quality in Maintenance Engineering, Vol. 11, No. 4, pp.359-374. (Pubitemid 41392797)
    • (2005) Journal of Quality in Maintenance Engineering , vol.11 , Issue.4 , pp. 359-374
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 87
    • 33644598208 scopus 로고    scopus 로고
    • Manufacturing excellence through TPM implementation: A practical analysis
    • Sharma, R., Kumar, D. and Kumar, P. (2006) 'Manufacturing excellence through TPM implementation: a practical analysis', Industrial Management & Data Systems, Vol. 106, No. 2, pp.256-280.
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.2 , pp. 256-280
    • Sharma, R.1    Kumar, D.2    Kumar, P.3
  • 88
    • 0001768007 scopus 로고    scopus 로고
    • A review of overall models for maintenance management
    • Sherwin, D.J. (2000) 'A review of overall models for maintenance management', Journal of Quality in Maintenance Engineering, Vol. 6, No. 3, pp.138-164.
    • (2000) Journal of Quality in Maintenance Engineering , vol.6 , Issue.3 , pp. 138-164
    • Sherwin, D.J.1
  • 93
    • 0142247474 scopus 로고    scopus 로고
    • The implementation and evaluation of total productive maintenance (TPM) - An action case study in a Hong Kong manufacturing company
    • Sun, H., Yam, R. and Wai-Keung, N. (2003) 'The implementation and evaluation of total productive maintenance (TPM) - an action case study in a Hong Kong manufacturing company', International Journal of Advanced Manufacturing Technology, Vol. 22, Nos. 3/4, pp.224-228.
    • (2003) International Journal of Advanced Manufacturing Technology , vol.22 , Issue.3-4 , pp. 224-228
    • Sun, H.1    Yam, R.2    Wai-Keung, N.3
  • 94
    • 0002082878 scopus 로고
    • Condition-based maintenance: Tools and decision making
    • Tsang, A.H.C. (1995) 'Condition-based maintenance: tools and decision making', Journal of Quality in Maintenance Engineering, Vol. 1, No. 3, pp.3-17.
    • (1995) Journal of Quality in Maintenance Engineering , vol.1 , Issue.3 , pp. 3-17
    • Tsang, A.H.C.1
  • 96
    • 33947206478 scopus 로고    scopus 로고
    • Implementation of total productive maintenance in food industry: A case study
    • DOI 10.1108/13552510710735087
    • Tsarouhas, P. (2007) 'Implementation of total productive maintenance in food industry: a case study', Journal of Quality in Maintenance Engineering, Vol. 13, No. 1, pp.5-18. (Pubitemid 46432519)
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.1 , pp. 5-18
    • Tsarouhas, P.1
  • 98
    • 0036449862 scopus 로고    scopus 로고
    • Total productive maintenance in a South African pulp and paper company: A case study
    • DOI 10.1108/09544780210447465
    • van der Wal, R. and Lynn, D. (2002) 'Total productive maintenance in a South African pulp and paper company: a case study', The TQM Magazine, Vol. 14, No. 6, pp.359-366. (Pubitemid 35443136)
    • (2002) TQM Magazine , vol.14 , Issue.6 , pp. 359-366
    • Van Der Wal, R.W.E.1    Lynn, D.2
  • 100
    • 0034319966 scopus 로고    scopus 로고
    • On the application of a model of condition-based maintenance
    • Wang, W., Scarf, P. and Smith, M. (2000) 'On the application of a model of condition-based maintenance', Journal of the Operational Research Society, Vol. 51, No. 11, pp.1218-1227. (Pubitemid 32017941)
    • (2000) Journal of the Operational Research Society , vol.51 , Issue.11 , pp. 1218-1227
    • Wang, W.1    Scarf, P.A.2    Smith, M.A.J.3
  • 103
    • 0142060370 scopus 로고
    • Japanese manufacturing strategy and the role of total productive maintenance
    • Yamashina, H. (1995) 'Japanese manufacturing strategy and the role of total productive maintenance', Journal of Quality in Maintenance Engineering, Vol. 1, No. 1, pp.27-38.
    • (1995) Journal of Quality in Maintenance Engineering , vol.1 , Issue.1 , pp. 27-38
    • Yamashina, H.1
  • 106
    • 70350291571 scopus 로고    scopus 로고
    • Estimating parameters of proportional hazards model based on expert knowledge and statistical data
    • Zuashkiani, A., Banjevic, D. and Jardine, A. (2009) 'Estimating parameters of proportional hazards model based on expert knowledge and statistical data', Journal of the Operational Research Society, Vol. 60, No. 12, pp.1621-1636.
    • (2009) Journal of the Operational Research Society , vol.60 , Issue.12 , pp. 1621-1636
    • Zuashkiani, A.1    Banjevic, D.2    Jardine, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.