-
1
-
-
4143063433
-
Cladding sector road map for realizing the CIM vision
-
Agbasi, E., Anumba, C. and Gibb, A. (2004), "Cladding sector road map for realizing the CIM vision", Industrial Management & Data Systems, Vol. 104 No. 6, pp. 526-32.
-
(2004)
Industrial Management & Data Systems
, vol.104
, Issue.6
, pp. 526-532
-
-
Agbasi, E.1
Anumba, C.2
Gibb, A.3
-
2
-
-
0029206961
-
Preventive maintenance: Stand-alone manufacturing compared with cellular manufacturing
-
Bateman, J. (1995), "Preventive maintenance: stand-alone manufacturing compared with cellular manufacturing", Industrial Management, Vol. 37 No. 1, pp. 19-21.
-
(1995)
Industrial Management
, vol.37
, Issue.1
, pp. 19-21
-
-
Bateman, J.1
-
3
-
-
0002688423
-
Maintenance and quality: The missing link
-
Ben-Daya, M. and Duffuaa, S.O. (1995), "Maintenance and quality: the missing link", Journal of Quality in Maintenance Engineering, Vol. 1 No. 1, pp. 20-6.
-
(1995)
Journal of Quality in Maintenance Engineering
, vol.1
, Issue.1
, pp. 20-26
-
-
Ben-Daya, M.1
Duffuaa, S.O.2
-
4
-
-
0031381681
-
The successful development of information systems for FMS: Some useful lessons
-
Canel, C. (1997), "The successful development of information systems for FMS: some useful lessons", Industrial Management & Data Systems, Vol. 97 No. 8, pp. 316-9.
-
(1997)
Industrial Management & Data Systems
, vol.97
, Issue.8
, pp. 316-319
-
-
Canel, C.1
-
5
-
-
0036110487
-
The use of score card in the management of production operations
-
Cebrian, L.I. and Vinegla, A.L. (2002), "The use of score card in the management of production operations", Industrial Management & Data Systems, Vol. 102 No. 1, pp. 39-46.
-
(2002)
Industrial Management & Data Systems
, vol.102
, Issue.1
, pp. 39-46
-
-
Cebrian, L.I.1
Vinegla, A.L.2
-
6
-
-
0033115993
-
Evaluations of operational control rules in scheduling a flexible manufacturing system
-
Chan, F.T.S. (1999), "Evaluations of operational control rules in scheduling a flexible manufacturing system", Robotics and Computer-Integrated Manufacturing, Vol. 5, pp. 121-32.
-
(1999)
Robotics and Computer-Integrated Manufacturing
, vol.5
, pp. 121-132
-
-
Chan, F.T.S.1
-
7
-
-
0027626981
-
FMS scheduling and control: Learning to achieve multiple goals
-
Chaturvedi, A.R. (1993), "FMS scheduling and control: learning to achieve multiple goals", Expert Systems with Applications, Vol. 6, pp. 267-86.
-
(1993)
Expert Systems with Applications
, vol.6
, pp. 267-286
-
-
Chaturvedi, A.R.1
-
8
-
-
0026417692
-
A survey of maintenance models for multi-unit systems
-
Cho, D.I. and Parlar, M. (1991), "A survey of maintenance models for multi-unit systems", European Journal of Operational Research, Vol. 51, pp. 1-23.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 1-23
-
-
Cho, D.I.1
Parlar, M.2
-
9
-
-
21144445085
-
Towards a framework of the performance evaluation of SMEs' industry portals
-
Chou, T.C. and Hsu, L. (2005), "Towards a framework of the performance evaluation of SMEs' industry portals", Industrial Management & Data Systems, Vol. 105 No. 4, pp. 527-44.
-
(2005)
Industrial Management & Data Systems
, vol.105
, Issue.4
, pp. 527-544
-
-
Chou, T.C.1
Hsu, L.2
-
10
-
-
0032655091
-
A holistic approach to the maintenance problem
-
Coettzee, A. (1999), "A holistic approach to the maintenance problem", Journal of Quality in Maintenance Engineering, Vol. 5 No. 3, pp. 276-80.
-
(1999)
Journal of Quality in Maintenance Engineering
, vol.5
, Issue.3
, pp. 276-280
-
-
Coettzee, A.1
-
11
-
-
20344369817
-
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
-
Das, S.R. and Canel, C. (2005), "An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system", International Journal Production Economics, Vol. 97, pp. 247-62.
-
(2005)
International Journal Production Economics
, vol.97
, pp. 247-262
-
-
Das, S.R.1
Canel, C.2
-
12
-
-
3543111420
-
Overall equipment effectiveness as a measure of operational improvement, a practical analysis
-
Dal, B., Tug well, P. and Great banks, R. (2000), "Overall equipment effectiveness as a measure of operational improvement, a practical analysis", International Journal of Operations & Production Management, Vol. 20 No. 12, pp. 1488-502.
-
(2000)
International Journal of Operations & Production Management
, vol.20
, Issue.12
, pp. 1488-1502
-
-
Dal, B.1
Tug Well, P.2
Great Banks, R.3
-
13
-
-
5044227167
-
Implementing total productive maintenance in Nigerian manufacturing industries
-
Eti, M.C., Ogaji, S.O.T. and Probert, S.D. (2004), "Implementing total productive maintenance in Nigerian manufacturing industries", Applied Energy, Vol. 79 No. 4, pp. 385-401.
-
(2004)
Applied Energy
, vol.79
, Issue.4
, pp. 385-401
-
-
Eti, M.C.1
Ogaji, S.O.T.2
Probert, S.D.3
-
14
-
-
2942603692
-
Maintenance modeling its strategic impact
-
Frendall, L.D., Patterson, J.W. and Kneedy, W.J. (1997), "Maintenance modeling its strategic impact", Journal of Managerial Issues, Vol. 9 No. 4, pp. 440-8.
-
(1997)
Journal of Managerial Issues
, vol.9
, Issue.4
, pp. 440-448
-
-
Frendall, L.D.1
Patterson, J.W.2
Kneedy, W.J.3
-
15
-
-
0037328890
-
A modeling technique for loading scheduling and problems in FMS
-
Gamila, M.A. and Motavalli, S. (2003), "A modeling technique for loading scheduling and problems in FMS", Robotics and Computer-Integrated Manufacturing, Vol. 19, pp. 45-54.
-
(2003)
Robotics and Computer-Integrated Manufacturing
, vol.19
, pp. 45-54
-
-
Gamila, M.A.1
Motavalli, S.2
-
16
-
-
0345476206
-
Availability, performance and service of FMS
-
Hammer, H. (1987), "Availability, performance and service of FMS", The FMS Magazine, Vol. 5 No. 4, pp. 180-6.
-
(1987)
The FMS Magazine
, vol.5
, Issue.4
, pp. 180-186
-
-
Hammer, H.1
-
17
-
-
0003389651
-
Total productive maintenance and its link to total quality management
-
Jostes, R.S. and Helms, M.M. (1994), "Total productive maintenance and its link to total quality management", Work Study, Vol. 43 No. 7, pp. 18-20.
-
(1994)
Work Study
, vol.43
, Issue.7
, pp. 18-20
-
-
Jostes, R.S.1
Helms, M.M.2
-
18
-
-
0033481849
-
Evaluation and improvement of manufacturing performance measurement systems - The role of OEE
-
Jonsson, P. and Lesshammar, A. (1999), "Evaluation and improvement of manufacturing performance measurement systems - the role of OEE", International Journal of Operations & Production Management, Vol. 19 No. 1, pp. 55-78.
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.1
, pp. 55-78
-
-
Jonsson, P.1
Lesshammar, A.2
-
19
-
-
0023398997
-
Issues in the maintenance of flexible manufacturing systems
-
Kennedy, W.J. Jr (1987), "Issues in the maintenance of flexible manufacturing systems", Maintenance Management International, Vol. 7 No. 1, pp. 43-52.
-
(1987)
Maintenance Management International
, vol.7
, Issue.1
, pp. 43-52
-
-
Kennedy Jr., W.J.1
-
20
-
-
3543045474
-
Consistency, accuracy lead to maximum OEE benefits
-
Kotze, D. (1993), "Consistency, accuracy lead to maximum OEE benefits", TPM Newsletter, Vol. 4 No. 2.
-
(1993)
TPM Newsletter
, vol.4
, Issue.2
-
-
Kotze, D.1
-
21
-
-
0032676749
-
Use mathematical modeling to give your TPM implementation effort an extra boost
-
Lawrence, J.J. (1999), "Use mathematical modeling to give your TPM implementation effort an extra boost", Journal of Quality in Maintenance Engineering, Vol. 5, pp. 62-9.
-
(1999)
Journal of Quality in Maintenance Engineering
, vol.5
, pp. 62-69
-
-
Lawrence, J.J.1
-
22
-
-
2342427050
-
An integrated evaluation system based on the continuous improvement model of IS performance
-
Leem, C.S. and Kim, I. (2004), "An integrated evaluation system based on the continuous improvement model of IS performance", Industrial Management & Data Systems, Vol. 104 No. 2, pp. 115-28.
-
(2004)
Industrial Management & Data Systems
, vol.104
, Issue.2
, pp. 115-128
-
-
Leem, C.S.1
Kim, I.2
-
23
-
-
0033481849
-
Evaluation and improvement of manufacturing performance measurement systems - The role of OEE
-
Lesshammar, M. (1999), "Evaluation and improvement of manufacturing performance measurement systems - the role of OEE", International Journal of Operations and Production Management, Vol. 19 No. 1, pp. 55-78.
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.1
, pp. 55-78
-
-
Lesshammar, M.1
-
24
-
-
0032396016
-
Measurement of overall equipment effectiveness as a basis for TPM activities
-
Ljungberg, O. (1998), "Measurement of overall equipment effectiveness as a basis for TPM activities", International Journal of Operations & Production Management, Vol. 18 No. 5, pp. 495-507.
-
(1998)
International Journal of Operations & Production Management
, vol.18
, Issue.5
, pp. 495-507
-
-
Ljungberg, O.1
-
25
-
-
0001258678
-
A global MILP model for FMS scheduling
-
Liu, J. and McCarthy, B.L. (1997), "A global MILP model for FMS scheduling", European Journal of Operational Research, Vol. 100 Nos 3, 1, pp. 441-53.
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.31
, pp. 441-453
-
-
Liu, J.1
McCarthy, B.L.2
-
26
-
-
0001302858
-
TPM: Planned and autonomous maintenance: Bridging the gap between practice and research
-
McKone, K. and Wiess, E. (1998), "TPM: planned and autonomous maintenance: bridging the gap between practice and research", Production and Operations Management, Vol. 7 No. 4, pp. 335-51.
-
(1998)
Production and Operations Management
, vol.7
, Issue.4
, pp. 335-351
-
-
McKone, K.1
Wiess, E.2
-
27
-
-
0011005678
-
Installation of flexible manufacturing systems teaches management lessons in integration, labor, costs, and benefits
-
Meredith, J.R. (1988), "Installation of flexible manufacturing systems teaches management lessons in integration, labor, costs, and benefits", Industrial Engineering, Vol. 20 No. 4, pp. 17-27.
-
(1988)
Industrial Engineering
, vol.20
, Issue.4
, pp. 17-27
-
-
Meredith, J.R.1
-
28
-
-
0022787968
-
Justification techniques for advanced manufacturing technologies
-
Meredith, J.R. and Suresh, N.C. (1986), "Justification techniques for advanced manufacturing technologies", International Journal of Production Research, Vol. 24 No. 5, pp. 1043-57.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.5
, pp. 1043-1057
-
-
Meredith, J.R.1
Suresh, N.C.2
-
31
-
-
0042363413
-
Integrating industrial maintenance strategy into ERP
-
Nikolopoulos, K., Metaxiotis, K., Lekatis, N. and Assimakopoulos, V. (2003), "Integrating industrial maintenance strategy into ERP", Industrial Management & Data Systems, Vol. 103 No. 3, pp. 184-91.
-
(2003)
Industrial Management & Data Systems
, vol.103
, Issue.3
, pp. 184-191
-
-
Nikolopoulos, K.1
Metaxiotis, K.2
Lekatis, N.3
Assimakopoulos, V.4
-
32
-
-
0008573551
-
A hierarchical approach for FMS scheduling problem
-
Paulli, J. (1995), "A hierarchical approach for FMS scheduling problem", European Journal of Operational Research, Vol. 86 No. 1, pp. 32-42.
-
(1995)
European Journal of Operational Research
, vol.86
, Issue.1
, pp. 32-42
-
-
Paulli, J.1
-
33
-
-
0030674968
-
A petrinet based machine tool maintenance management system
-
Prickett, P. (1997), "A petrinet based machine tool maintenance management system", Industrial Management & Data Systems, Vol. 97 No. 4, pp. 143-9.
-
(1997)
Industrial Management & Data Systems
, vol.97
, Issue.4
, pp. 143-149
-
-
Prickett, P.1
-
35
-
-
18844412952
-
Enterprise resource planning and organizational innovation: A management perspective
-
Rodney, M.A. and Galloway, A. (2005), "Enterprise resource planning and organizational innovation: a management perspective", Industrial Management & Data Systems, Vol. 105 No. 3, pp. 280-90.
-
(2005)
Industrial Management & Data Systems
, vol.105
, Issue.3
, pp. 280-290
-
-
Rodney, M.A.1
Galloway, A.2
-
36
-
-
0031677986
-
5-S practice: A new tool for industrial management
-
Samuel, K.M. (1998), "5-S practice: a new tool for industrial management", Industrial Management & Data Systems, Vol. 98 No. 2, pp. 55-62.
-
(1998)
Industrial Management & Data Systems
, vol.98
, Issue.2
, pp. 55-62
-
-
Samuel, K.M.1
-
38
-
-
0142075369
-
Suitable switching policies for FMS scheduling
-
Somlo, J. (2004), "Suitable switching policies for FMS scheduling", Mechatronics, Vol. 14 No. 2, pp. 199-225.
-
(2004)
Mechatronics
, vol.14
, Issue.2
, pp. 199-225
-
-
Somlo, J.1
-
41
-
-
0036202972
-
Strategic dimensions of maintenance management
-
Tsang, A.H.C. (2002), "Strategic dimensions of maintenance management", Journal of Quality in Maintenance Engineering, Vol. 80 No. 1, pp. 7-39.
-
(2002)
Journal of Quality in Maintenance Engineering
, vol.80
, Issue.1
, pp. 7-39
-
-
Tsang, A.H.C.1
-
42
-
-
10444255425
-
Applying a knowledge management modeling tool for manufacturing vision (MV) development
-
Wang, C., Luxhøj, J.T. and Johansen, J. (2004), "Applying a knowledge management modeling tool for manufacturing vision (MV) development", Industrial Management & Data Systems, Vol. 104 No. 9, pp. 735-43.
-
(2004)
Industrial Management & Data Systems
, vol.104
, Issue.9
, pp. 735-743
-
-
Wang, C.1
Luxhøj, J.T.2
Johansen, J.3
-
43
-
-
0037062528
-
A framework for maintenance concept development
-
Wayenbergh, G. and Pintelon, L. (2002), "A framework for maintenance concept development", International Journal of Production Economics, Vol. 77, pp. 299-313.
-
(2002)
International Journal of Production Economics
, vol.77
, pp. 299-313
-
-
Wayenbergh, G.1
Pintelon, L.2
-
44
-
-
0026953443
-
Computer-aided dynamic preventive maintenance within the manufacturing environment
-
Wu, B., Seddon, J. and Currie, W. (1992), "Computer-aided dynamic preventive maintenance within the manufacturing environment", International Journal of Production Research, Vol. 30, pp. 2683-96.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2683-2696
-
-
Wu, B.1
Seddon, J.2
Currie, W.3
|