메뉴 건너뛰기




Volumn 9, Issue 3, 2003, Pages 250-264

RCM introduction: Process and requirements management aspects

Author keywords

Case studies; Maintenance; Process management; Reliability management

Indexed keywords

COMPUTER SYSTEMS; HYDROELECTRIC POWER PLANTS; INDUSTRIAL MANAGEMENT; PERSONNEL; RELIABILITY; SCHEDULING; STRATEGIC PLANNING;

EID: 0141988591     PISSN: 13552511     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552510310493701     Document Type: Article
Times cited : (23)

References (33)
  • 2
    • 0031342126 scopus 로고    scopus 로고
    • Reliability-centered maintenance effectiveness in the power industry: How much is real - And how much hype?
    • August, J.K. (1997), "Reliability-centered maintenance effectiveness in the power industry: how much is real - and how much hype?", Proceedings of the 1997 Joint Power Generation Conference, ASME, pp. 347-60.
    • (1997) Proceedings of the 1997 Joint Power Generation Conference, ASME , pp. 347-360
    • August, J.K.1
  • 3
    • 0008705265 scopus 로고    scopus 로고
    • Reliability-centred maintenance; identification of management and organisational aspects of importance when introducing RCM
    • Licentiate thesis, Department of Business Administration and Social Sciences, Luleå University of Technology, Luleå
    • Backlund, F. (1999a), "Reliability-centred maintenance; identification of management and organisational aspects of importance when introducing RCM", Licentiate thesis, Department of Business Administration and Social Sciences, Luleå University of Technology, Luleå
    • (1999)
    • Backlund, F.1
  • 4
    • 0141964827 scopus 로고    scopus 로고
    • Will a preparation stage facilitate the implementation of RCM? A case study at a Swedish hydro power plant
    • in Schüeller, G. I. and Kafka, P. (Eds)
    • Backlund, F. (1999b), "Will a preparation stage facilitate the implementation of RCM? A case study at a Swedish hydro power plant", in Schüeller, G.I. and Kafka, P. (Eds), Proceedings of the Tenth European Conference on Safety and Reliability, ESREL '99, Balkema, Rotterdam, pp. 173-8.
    • (1999) Proceedings of the Tenth European Conference on Safety and Reliability, ESREL '99, Balkema, Rotterdam , pp. 173-178
    • Backlund, F.1
  • 6
    • 0141964826 scopus 로고    scopus 로고
    • Research Report, 2003:2, Division of Quality & Environmental Management, Luleå University of Technology, Luleå
    • Backlund, F. (2003), Managing RCM Introduction: A Literature Study, Research Report, 2003:2, Division of Quality & Environmental Management, Luleå University of Technology, Luleå.
    • (2003) Managing RCM Introduction: A Literature Study
    • Backlund, F.1
  • 9
    • 0141999616 scopus 로고
    • Reliability-centred maintenance: Profitable investment or 'venture in faith'?
    • Bowler, D. and Malcom, I. (1994), "Reliability-centred maintenance: profitable investment or 'venture in faith'?", Management Accounting: Magazine for Chartered Management, Vol. 72, pp. 52-5.
    • (1994) Management Accounting: Magazine for Chartered Management , vol.72 , pp. 52-55
    • Bowler, D.1    Malcom, I.2
  • 10
    • 0029207864 scopus 로고
    • Economic evaluation of reliability-centred maintenance (RCM): An electricity transmission industry perspective
    • Bowler, D.J., Primrose, P.L. and Leonard, R. (1995), "Economic evaluation of reliability-centred maintenance (RCM): an electricity transmission industry perspective", IEE Proceedings - Generation, Transmission and Distribution, Vol. 142, pp. 9-16.
    • (1995) IEE Proceedings - Generation, Transmission and Distribution , vol.142 , pp. 9-16
    • Bowler, D.J.1    Primrose, P.L.2    Leonard, R.3
  • 13
    • 0141999615 scopus 로고
    • Practical RCM analysis and its information requirements
    • Harris, J. and Moss, B. (1994), "Practical RCM analysis and its information requirements", Maintenance, Vol. 9, pp. 7-12.
    • (1994) Maintenance , vol.9 , pp. 7-12
    • Harris, J.1    Moss, B.2
  • 17
    • 0141964825 scopus 로고
    • Use reliability-centered maintenance to identify real-world risks
    • Jones, R.B. (1995), "Use reliability-centered maintenance to identify real-world risks", Hydrocarbon Processing, Vol. 74 No. 10, pp. 57-66.
    • (1995) Hydrocarbon Processing , vol.74 , Issue.10 , pp. 57-66
    • Jones, R.B.1
  • 18
    • 0141930303 scopus 로고    scopus 로고
    • Från system till process - Kriteria för processbestämning vid verksamhetsanalys
    • (in Swedish), PhD thesis, Linköping Studies in Information Science, Linköping University, Linköping
    • Lind, M. (2001), "Från system till process - kriteria för processbestämning vid verksamhetsanalys", (in Swedish), PhD thesis, Linköping Studies in Information Science, Linköping University, Linköping
    • (2001)
    • Lind, M.1
  • 23
  • 24
    • 0010773514 scopus 로고    scopus 로고
    • Core process management
    • Licentiate thesis, Linköping Studies in Science and Technology, Linköpings University Linköping
    • Rentzhog, O. (1996), "Core process management", Licentiate thesis, Linköping Studies in Science and Technology, Linköpings University Linköping.
    • (1996)
    • Rentzhog, O.1
  • 25
    • 0141895810 scopus 로고
    • Streamlining reliability-centered maintenance
    • Rotton, J. (1994), "Streamlining reliability-centered maintenance", Nuclear News, No. 10, pp. 48-53.
    • (1994) Nuclear News , Issue.10 , pp. 48-53
    • Rotton, J.1
  • 27
    • 0008738810 scopus 로고
    • RCM closing the loop between design and operation reliability
    • Sandtorv, H. and Rausand, M. (1991), "RCM closing the loop between design and operation reliability", Maintenance, Vol. 6 No. 1, pp. 13-21.
    • (1991) Maintenance , vol.6 , Issue.1 , pp. 13-21
    • Sandtorv, H.1    Rausand, M.2
  • 32
    • 0029341216 scopus 로고
    • Development of PM and RCM programs
    • Steibly, R.L. (1995), "Development of PM and RCM programs", AIPE Facilities, Vol. 22, No. 4, pp. 31-3.
    • (1995) AIPE Facilities , vol.22 , Issue.4 , pp. 31-33
    • Steibly, R.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.