메뉴 건너뛰기




Volumn 17, Issue 9, 2000, Pages 1003-1016

Implementing TPM in plant maintenance: Some organisational barriers

Author keywords

Barriers; Competitiveness; Maintenance; Total productive maintenance

Indexed keywords


EID: 0348164729     PISSN: 0265671X     EISSN: None     Source Type: Journal    
DOI: 10.1108/02656710010378789     Document Type: Article
Times cited : (130)

References (21)
  • 3
    • 84887270356 scopus 로고
    • Total Quality and Human Resources: An Executive Guide,Blackwell
    • Dale, B. and Cooper, G. (1992), Total Quality and Human Resources: an Executive Guide,Blackwell, Oxford.
    • (1992) Oxford
    • Dale, B.1    Cooper, G.2
  • 4
    • 84887270157 scopus 로고
    • (The) Economist, 18 April
    • The Economist (1992), 18 April.
    • (1992)
  • 6
    • 0032000192 scopus 로고    scopus 로고
    • Manufacturing Engineer, February
    • Hutchins, D. (1998), "Introducing TPM", Manufacturing Engineer, February.
    • (1998) Introducing TPM
    • Hutchins, D.1
  • 7
    • 0008539785 scopus 로고
    • IDS Study 407, April, London
    • IDS Study 407 (1988), Flexibility Working, April, London.
    • (1988) Flexibility Working
  • 8
    • 84887263314 scopus 로고    scopus 로고
    • IDS Study 610, March, London
    • IDS Study 610 (1996), Paying for Multi-skilling, March, London.
    • (1996) Paying For Multi-skilling
  • 15
    • 84928836593 scopus 로고
    • Evaluating and rethinking the case study
    • Stoecker, R. (1991), "Evaluating and rethinking the case study", Sociological Reviews, Vol. 3901, pp. 88-112.
    • (1991) Sociological Reviews , vol.3901 , pp. 88-112
    • Stoecker, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.