메뉴 건너뛰기




Volumn 1, Issue 1, 2011, Pages 1-13

A method for using stochastic blocking times to improve timetable planning

Author keywords

Blocking time theory; GPS data; Motion equation; Stochastic simulation; Timetable planning

Indexed keywords

BEHAVIORAL RESEARCH; CALIBRATION; EMPLOYMENT; EQUATIONS OF MOTION; PROBABILITY; RAILROAD TRANSPORTATION; SCHEDULING; STOCHASTIC MODELS;

EID: 84856905539     PISSN: 22109706     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jrtpm.2011.07.001     Document Type: Article
Times cited : (53)

References (26)
  • 1
    • 36148955836 scopus 로고    scopus 로고
    • Reconstruction of train trajectories from track occupation data to determine the effects of a Driver Information System
    • WIT Press, Southampton, J. Allen (Ed.)
    • Albrecht T., Goverde R.M.P., Weeda V.A., van Luipen J. Reconstruction of train trajectories from track occupation data to determine the effects of a Driver Information System. Computers in Railways X 2006, 207-216. WIT Press, Southampton. J. Allen (Ed.).
    • (2006) Computers in Railways X , pp. 207-216
    • Albrecht, T.1    Goverde, R.M.P.2    Weeda, V.A.3    van Luipen, J.4
  • 2
    • 4644247039 scopus 로고    scopus 로고
    • Konzeption einer Rechnerunterstützung für die Feinkonstruktion von Eisenbahnfahrplänen, RWTH Aachen
    • PhD Thesis.
    • Brünger, O., 1996. Konzeption einer Rechnerunterstützung für die Feinkonstruktion von Eisenbahnfahrplänen, RWTH Aachen. PhD Thesis.
    • (1996)
    • Brünger, O.1
  • 3
    • 58849167281 scopus 로고    scopus 로고
    • Development of a dwell time calculation model for timetable planning
    • WIT Press, Southampton, J. Allan, E. Arias, C.A. Brebbia (Eds.)
    • Buchmuller S., Weidmann U., et al. Development of a dwell time calculation model for timetable planning. Computers in Railways XI 2008, 525-534. WIT Press, Southampton. J. Allan, E. Arias, C.A. Brebbia (Eds.).
    • (2008) Computers in Railways XI , pp. 525-534
    • Buchmuller, S.1    Weidmann, U.2
  • 5
    • 77956308939 scopus 로고    scopus 로고
    • Identifying Dependencies among Delays
    • Georg-August-Universität zu Göttingen. PhD Thesis.
    • Conte, C., 2007. Identifying Dependencies among Delays. Georg-August-Universität zu Göttingen. PhD Thesis.
    • (2007)
    • Conte, C.1
  • 6
    • 58849133731 scopus 로고    scopus 로고
    • Automated analysis of train event recorder data to improve micro-simulation models
    • WIT Press, Southampton, J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.)
    • de Fabris S., Longo G., Medeossi G. Automated analysis of train event recorder data to improve micro-simulation models. Computers in Railways XI 2008, 575-583. WIT Press, Southampton. J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.).
    • (2008) Computers in Railways XI , pp. 575-583
    • de Fabris, S.1    Longo, G.2    Medeossi, G.3
  • 7
    • 84856848985 scopus 로고    scopus 로고
    • Automatic identification of route conflict occurrences and their consequences
    • WIT Press, Southampton, J. Allan, E. Arias, C.A. Brebbia (Eds.)
    • Goverde R.M.P., Daamen W., et al. Automatic identification of route conflict occurrences and their consequences. Computers in Railways XI 2008, 575-585. WIT Press, Southampton. J. Allan, E. Arias, C.A. Brebbia (Eds.).
    • (2008) Computers in Railways XI , pp. 575-585
    • Goverde, R.M.P.1    Daamen, W.2
  • 8
    • 0346871681 scopus 로고    scopus 로고
    • Introduction to Random Signals and Applied Kalman Filtering
    • second ed. John Wiley and Sons, NavtechGPS.
    • Grower Brown, R., Hwang, P.Y.C., 1997. Introduction to Random Signals and Applied Kalman Filtering, second ed. John Wiley and Sons, NavtechGPS.
    • (1997)
    • Grower Brown, R.1    Hwang, P.Y.C.2
  • 9
    • 4644238419 scopus 로고    scopus 로고
    • Increase of capacity through optimised timetabling
    • WIT Press, Southampton, J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.)
    • Hansen I.A. Increase of capacity through optimised timetabling. Computers in Railways IX 2004, 529-537. WIT Press, Southampton. J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.).
    • (2004) Computers in Railways IX , pp. 529-537
    • Hansen, I.A.1
  • 11
    • 4644349692 scopus 로고
    • Sperrzeiten als Grundlage für die Fahrplankonstruktion
    • In: Eisenbahntechnische Rundschau
    • Happel, O., 1959. Sperrzeiten als Grundlage für die Fahrplankonstruktion. In: Eisenbahntechnische Rundschau, vol. 8 (2), pp. 79-90.
    • (1959) , vol.8 , Issue.2 , pp. 79-90
    • Happel, O.1
  • 13
    • 22344439778 scopus 로고    scopus 로고
    • Objektorientierte Modellierung von Infrastrukturelementen und Betriebsvorgangen im Eisenbahnwesen
    • ETH Dissertation No. 14281 (in German).
    • Hürlimann, D., 2001. Objektorientierte Modellierung von Infrastrukturelementen und Betriebsvorgangen im Eisenbahnwesen. ETH Dissertation No. 14281 (in German).
    • (2001)
    • Hürlimann, D.1
  • 14
    • 84856917766 scopus 로고    scopus 로고
    • Stochastic micro-simulation as a timetable robustness estimation tool
    • In: Third International Seminar on Railway Operations Modelling and Analysis, Zurich.
    • Hürlimann, D., Longo, G., Medeossi, G., 2009. Stochastic micro-simulation as a timetable robustness estimation tool. In: Third International Seminar on Railway Operations Modelling and Analysis, Zurich.
    • (2009)
    • Hürlimann, D.1    Longo, G.2    Medeossi, G.3
  • 15
    • 84886994889 scopus 로고    scopus 로고
    • Capacity and Reliability on Railway Networks, A Simulative Approach
    • PhD Thesis, University of Trieste.
    • Medeossi, G., 2010. Capacity and Reliability on Railway Networks, A Simulative Approach. PhD Thesis, University of Trieste.
    • (2010)
    • Medeossi, G.1
  • 17
    • 84856934758 scopus 로고
    • Representation of track topologies with double vertex graphs
    • Computational Mechanics Publications, Washington, DC
    • Montigel M. Representation of track topologies with double vertex graphs. Computers in Railways 1992, vol. 2. Computational Mechanics Publications, Washington, DC.
    • (1992) Computers in Railways , vol.2
    • Montigel, M.1
  • 18
    • 33748713705 scopus 로고    scopus 로고
    • RailML - a standard data interface for railroad applications
    • WIT Press, Southampton, J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.)
    • Nash A., Huerlimann D., Schuette J., Krauss V.P. RailML - a standard data interface for railroad applications. Computers in Railways IX 2004, 45-54. WIT Press, Southampton. J. Allan, R.J. Hill, C.A. Brebbia, G. Sciutto, S. Sone (Eds.).
    • (2004) Computers in Railways IX , pp. 45-54
    • Nash, A.1    Huerlimann, D.2    Schuette, J.3    Krauss, V.P.4
  • 20
    • 0032260173 scopus 로고    scopus 로고
    • DYNAMIS: a model for the calculation of running times for an efficient timetable construction
    • In: Allen, J. et al., Proceedings Computers in Railways VI. WIT Press, Southampton.
    • Radtke, A., Müller, L., Schumacher, A., 1998. DYNAMIS: a model for the calculation of running times for an efficient timetable construction. In: Allen, J. et al., Proceedings Computers in Railways VI. WIT Press, Southampton, pp. 309-317.
    • (1998) , pp. 309-317
    • Radtke, A.1    Müller, L.2    Schumacher, A.3
  • 21
    • 39749160505 scopus 로고
    • Strategische Optionen für die zufällige Fahrzeit im Eisenbahnnbetrieb
    • PhD Thesis. Dresden Institure for Traffic Research (Hochschule für Verkehrswesen).
    • Steckel, J., 1991. Strategische Optionen für die zufällige Fahrzeit im Eisenbahnnbetrieb. PhD Thesis. Dresden Institure for Traffic Research (Hochschule für Verkehrswesen).
    • (1991)
    • Steckel, J.1
  • 22
    • 84869782036 scopus 로고    scopus 로고
    • UIC, International Union of Railways
    • Fiche 544-1, Brakes - Braking Power, UIC.
    • UIC, International Union of Railways, 2004, Fiche 544-1, Brakes - Braking Power, UIC.
    • (2004)
  • 23
    • 84856873272 scopus 로고    scopus 로고
    • Verwendung von Eisenbahnbetriebsdaten für die Schwachstellen- und Risikoanalyse zur Verbesserung der Angebots- und Betriebsqualität
    • ETH Zuerich. PhD Thesis.
    • Ullius, M., 2004. Verwendung von Eisenbahnbetriebsdaten für die Schwachstellen- und Risikoanalyse zur Verbesserung der Angebots- und Betriebsqualität, ETH Zuerich. PhD Thesis.
    • (2004)
    • Ullius, M.1
  • 25
    • 4644221247 scopus 로고
    • Weiterentwicklung der Sperrzeitentreppe für modern Signalsysteme
    • In: Signal und Draht
    • Wendler, E., 1995. Weiterentwicklung der Sperrzeitentreppe für modern Signalsysteme. In: Signal und Draht, vol. 87 (7/8), pp. 268-273.
    • (1995) , vol.87 , Issue.7-8 , pp. 268-273
    • Wendler, E.1
  • 26
    • 37749047801 scopus 로고    scopus 로고
    • Stochastic Modelling of Train Delays and Delay Propagation in Stations
    • Ph.D. Thesis. Delft University of Technology.
    • Yuan, J., 2006. Stochastic Modelling of Train Delays and Delay Propagation in Stations. Ph.D. Thesis. Delft University of Technology.
    • (2006)
    • Yuan, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.