메뉴 건너뛰기




Volumn 15, Issue , 2004, Pages 529-538

Increase of capacity through optimised timetabling

Author keywords

Blocking time; Headway; Slack; Timetabling; Waiting time

Indexed keywords

INTELLIGENT CONTROL; QUALITY OF SERVICE; RAILROAD SIGNAL SYSTEMS; RAILROAD STATIONS; RAILROAD TRAFFIC CONTROL; RAILROAD TRANSPORTATION; SCHEDULING; TRANSPORTATION ROUTES;

EID: 4644238419     PISSN: 1462608X     EISSN: None     Source Type: Book Series    
DOI: None     Document Type: Conference Paper
Times cited : (13)

References (20)
  • 2
    • 0010377044 scopus 로고
    • Ableitung eines generellen Wartemodells zur Ermittlung der planmäßigen Wartezeiten im Eisenbahnbetrieb unter besonderer Berücksichtigung der Aspekte Leistungsfähigkeit und Anlagenbelastung
    • PhD thesis, H
    • Wakob, H. (1985) "Ableitung eines generellen Wartemodells zur Ermittlung der planmäßigen Wartezeiten im Eisenbahnbetrieb unter besonderer Berücksichtigung der Aspekte Leistungsfähigkeit und Anlagenbelastung", Veröffentl. verkehrswissenschaftl. Institut RWTH Aachen, PhD thesis, H.
    • (1985) Veröffentl. Verkehrswissenschaftl. Institut RWTH Aachen
    • Wakob, H.1
  • 3
    • 4544317944 scopus 로고
    • Die maximale Verkehrsleistung und die minimale Fahrplanempfindlichkeit auf Eisenbahnstrecken"
    • Hertel, G. (1992) "Die maximale Verkehrsleistung und die minimale Fahrplanempfindlichkeit auf Eisenbahnstrecken", Eisenbahntechn. Rundschau ETR, 41, H. 10, 665-672.
    • (1992) Eisenbahntechn. Rundschau ETR , vol.41 , Issue.10 , pp. 665-672
    • Hertel, G.1
  • 4
    • 4644370211 scopus 로고    scopus 로고
    • Analytische Berechnung der planmässigen Wartezeiten bei asynchroner Fahrplankonstruktion
    • PhD thesis
    • Wendler, E. (1999) "Analytische Berechnung der planmässigen Wartezeiten bei asynchroner Fahrplankonstruktion", Veröffentl. verkehrswissenschaftl. Institut RWTH Aachen, PhD thesis, H. 55.
    • (1999) Veröffentl. Verkehrswissenschaftl. Institut RWTH Aachen , Issue.55
    • Wendler, E.1
  • 5
    • 0036794824 scopus 로고    scopus 로고
    • A solvable queueing network model for railway networks and its validation and applications for the Netherlands
    • Huisman, T., Boucherie, R.J., van Dijk, N.M. (2002) "A solvable queueing network model for railway networks and its validation and applications for the Netherlands", EJOR., 142, 30-51.
    • (2002) EJOR , vol.142 , pp. 30-51
    • Huisman, T.1    Boucherie, R.J.2    Van Dijk, N.M.3
  • 6
    • 4644318416 scopus 로고
    • Modell für die asynchrone Simulation des Betriebes in Teilen des Eisenbahnnetzes
    • PhD thesis
    • Schultze, K. (1985) "Modell für die asynchrone Simulation des Betriebes in Teilen des Eisenbahnnetzes", Veröffentl. verkehrswissenschaftl. Institut RWTH Aachen, PhD thesis, H. 38.
    • (1985) Veröffentl. Verkehrswissenschaftl. Institut RWTH Aachen , Issue.38
    • Schultze, K.1
  • 7
    • 4644357412 scopus 로고    scopus 로고
    • Automatische und diskriminierungsfreie Ermittlung von Fahrplantrassen in beliebig grossen Netzen spurgeführter Systeme
    • PhD thesis, Hestra: Darmstadt
    • Hauptmann, D. (2000) "Automatische und diskriminierungsfreie Ermittlung von Fahrplantrassen in beliebig grossen Netzen spurgeführter Systeme", Wissenschaftl. Arbeiten Institut für Verkehrswesen, Eisenbahnbau u. -betrieb Universität Hannover, H. 55, PhD thesis, Hestra: Darmstadt.
    • (2000) Wissenschaftl. Arbeiten Institut für Verkehrswesen, Eisenbahnbau U. -Betrieb Universität Hannover , Issue.55
    • Hauptmann, D.1
  • 8
    • 0034396319 scopus 로고    scopus 로고
    • Testing schedule performance and reliability for train stations
    • Carey, M., Carville S. (2000) "Testing schedule performance and reliability for train stations", Journal Operational Research Society, Vol. 51, 666-682.
    • (2000) Journal Operational Research Society , vol.51 , pp. 666-682
    • Carey, M.1    Carville, S.2
  • 10
    • 0037355373 scopus 로고    scopus 로고
    • Scheduling and platforming trains at busy complex stations
    • Carey, M., Carville S. (2003) "Scheduling and platforming trains at busy complex stations", Transportation Research, Part A, Vol. 37, 195-224.
    • (2003) Transportation Research, Part A , vol.37 , pp. 195-224
    • Carey, M.1    Carville, S.2
  • 11
    • 4644282754 scopus 로고    scopus 로고
    • Quality management in the operation planning process by means of harmonized modeling
    • paper no. 302
    • Wendler, E. (2001) "Quality management in the operation planning process by means of harmonized modeling", WCRR 25-29 Nov. Cologne, paper no. 302.
    • (2001) WCRR 25-29 Nov. Cologne
    • Wendler, E.1
  • 12
    • 4644323878 scopus 로고    scopus 로고
    • Hindrance between conflicting train movements at a level crossing
    • Allan, J. et al. (ed.) WIT: Southampton, Boston
    • Trorop, J.P.M., Hansen, I.A. (2002) "Hindrance between conflicting train movements at a level crossing", in: Allan, J. et al. (ed.) Computers in Railways VIII, WIT: Southampton, Boston, 985-993.
    • (2002) Computers in Railways VIII , pp. 985-993
    • Trorop, J.P.M.1    Hansen, I.A.2
  • 13
    • 4644258762 scopus 로고    scopus 로고
    • Propagation of train delays in stations
    • Allan, J. et al. (ed.) WIT: Southampton, Boston
    • Yuan, J., Goverde, R.M.P., Hansen, I.A. (2002) "Propagation of train delays in stations", in: Allan, J. et al. (ed.) Computers in Railways VIII, WIT: Southampton, Boston, 975-984.
    • (2002) Computers in Railways VIII , pp. 975-984
    • Yuan, J.1    Goverde, R.M.P.2    Hansen, I.A.3
  • 14
    • 27144471094 scopus 로고    scopus 로고
    • Analysis of scheduled and real capacity utilisation at a major Dutch railway station
    • Allan, J. et al. (ed.) WIT: Southampton, Boston, forthcoming
    • Yuan, J., Hansen, I.A. (2004) "Analysis of scheduled and real capacity utilisation at a major Dutch railway station", in: Allan, J. et al. (ed.) Computers in Railways VIIII, WIT: Southampton, Boston, forthcoming.
    • (2004) Computers in Railways VIIII
    • Yuan, J.1    Hansen, I.A.2
  • 15
    • 4644359827 scopus 로고    scopus 로고
    • UIC Union International des Chemins de Fer (2003) "Leaflet 405-1 Capacity".
    • (2003) Leaflet 405-1 Capacity
  • 17
    • 4644250272 scopus 로고    scopus 로고
    • Erasmus University Rotterdam, Ph.D. thesis, TRAIL Thesis series T3003/5
    • Peeters, L. (2003) "Cyclic Railway Timetable Optimization", Erasmus University Rotterdam, Ph.D. thesis, TRAIL Thesis series T3003/5.
    • (2003) Cyclic Railway Timetable Optimization
    • Peeters, L.1
  • 18
    • 0032259192 scopus 로고    scopus 로고
    • The max-plus algebra approach to railway timetable design
    • Allan, J. et al. (ed.), WIT: Southampton, Boston
    • Goverde, R.M.P. (1998) "The Max-Plus Algebra Approach to Railway Timetable Design", in: Allan, J. et al. (ed.) Computers in Railways VI, WIT: Southampton, Boston, 339-350.
    • (1998) Computers in Railways VI , pp. 339-350
    • Goverde, R.M.P.1
  • 19
    • 33644694629 scopus 로고    scopus 로고
    • Performance evaluation of network timetables using PETER
    • Allan, J. et al. (ed.), WIT: Southampton, Boston
    • Goverde, R.M.P., Odijk, M.A. (2002) "Performance evaluation of network timetables using PETER", in: Allan, J. et al. (ed.) Computers in Railways VIIII, WIT: Southampton, Boston, 731-740.
    • (2002) Computers in Railways VIIII , pp. 731-740
    • Goverde, R.M.P.1    Odijk, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.