메뉴 건너뛰기




Volumn , Issue , 2008, Pages 667-678

Work-in-process buffer management using the rational commitment model in repetitive projects

Author keywords

Buffer; Lean production; Rational commitment model; Work in process

Indexed keywords

BUFFER; BUFFER MANAGEMENT; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; KEY FACTORS; LEAN PRODUCTION; NEGATIVE IMPACTS; OPERATIONAL LEVEL; PRACTICAL SOLUTIONS; PRODUCTION PLANNING; PRODUCTION STRATEGY; RELIABILITY INDICATORS; SHORT TERM PLANNING; WORK-IN-PROCESS;

EID: 84856668009     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (13)
  • 3
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, U.K
    • Ballard, G. (2000). The Last Planner System of Production Control. Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, U.K.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 4
    • 1642563359 scopus 로고    scopus 로고
    • Implications of even flow production methodology for U.S. Housing Industry
    • Bashford, H. H., Sawhney, A., Walsh, K. D. and Kot, K. (2003). Implications of Even Flow Production Methodology for U.S. Housing Industry. J. Const. Engr. Mgmt., ASCE, Vol. 129, No 3, pp. 330-337.
    • (2003) J. Const. Engr. Mgmt., ASCE , vol.129 , Issue.3 , pp. 330-337
    • Bashford, H.H.1    Sawhney, A.2    Walsh, K.D.3    Kot, K.4
  • 8
    • 34248579316 scopus 로고    scopus 로고
    • Multiobjective linear programming model for scheduling linear repetitive projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(417)
    • Ipsilandis, P. G. (2007). Multiobjective Linear Programming for Scheduling Linear Repetitive Projects. J. Const. Engrg. and Mgmt., ASCE, vol. 133, no 6, pp. 417-424. (Pubitemid 46753481)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 417-424
    • Ipsilandis, P.G.1
  • 11
    • 13944281790 scopus 로고    scopus 로고
    • Reliability buffering for construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:5(626)
    • Park M. and Peña-Mora, F. (2004). Reliability Buffering for Construction Projects. J. Const. Engrg. and Mgmt., ASCE, vol 130, no 5, pgs. 626-637. (Pubitemid 40265329)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.5 , pp. 626-637
    • Park, M.1    Pena-Mora, F.2
  • 13
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as lean construction principle
    • DOI 10.1061/(ASCE)0733-9364(2003)129:3(251)
    • Thomas, H. R., Horman, M. J., Minchin, R. E. and Chen, D. (2003). Improving Labor Flow Reliability for Better Productivity as a Lean Construction Principle. J. Const. Engr. Mgmt., ASCE, Vol. 129, No 3, pp. 251-261. (Pubitemid 40265467)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin Jr., R.E.3    Chen, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.