1
-
-
0013115080
-
-
A.A. Balkema, Rotterdam, The Netherlands
-
Alarcon, L. (editor) (1997). Lean Construction. A.A. Balkema, Rotterdam, The Netherlands, 497 pp.
-
(1997)
Lean Construction
-
-
Alarcon, L.1
-
5
-
-
0004011301
-
-
Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, University of Birmingham, UK
-
Ballard, G. (2000a). The Last Planner System of Production Control. Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, University of Birmingham, UK.
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
6
-
-
84856650533
-
Positive and negative iteration in design
-
Ballard, G. (2000b). "Positive and Negative Iteration in Design", Journal of Construction Engineering and Management, ASCE, 124 (1), pp. 11-17.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
-
7
-
-
85053272542
-
Lean construction tools and technique
-
Butterworth Heinemann
-
Ballard, G., Tommelein, I. D., Koskela, L., and Howell, G. (2003). Lean Construction Tools and Technique. Chapter 15 in Design and Construction: Building in Value, Butterworth Heinemann, pp. 227-255.
-
(2003)
Chapter 15 in Design and Construction: Building in Value
, pp. 227-255
-
-
Ballard, G.1
Tommelein, I.D.2
Koskela, L.3
Howell, G.4
-
8
-
-
84993044173
-
Managing work flow on design projects: A case study
-
Ballard, G (2002). "Managing Work Flow on Design Projects: A Case Study". Engineering, Construction, and Architectural Management, 9 (3), pp. 284-291.
-
(2002)
Engineering, Construction, and Architectural Management
, vol.9
, Issue.3
, pp. 284-291
-
-
Ballard, G.1
-
10
-
-
77953352463
-
-
Construction Industry Institute, The University of Texas at Austin, Texas, USA
-
Ballard, G., Kim, Y.W., Jang, J.W., and Liu, M. (2007). Road Map for Lean Implementation at the Project Level, Research Report 234-11, Construction Industry Institute, The University of Texas at Austin, Texas, USA, 426 pp.
-
(2007)
Road Map for Lean Implementation at the Project Level, Research Report 234-11
-
-
Ballard, G.1
Kim, Y.W.2
Jang, J.W.3
Liu, M.4
-
11
-
-
84856657727
-
-
nd Edition, Lean Construction Institute, San Francisco, California, USA
-
nd Edition, Lean Construction Institute, San Francisco, California, USA, 81pp.
-
(2007)
The Last Planner Production Workbook- Improving Reliability in Planning and Workflow
-
-
Ballard, G.1
Hamzeh, F.R.2
-
13
-
-
84856634237
-
Cathedral hill pulse report
-
CHPR, Cathedral Hill Hospital Project, December, San Francisco, CA
-
CHPR (2008). "Cathedral Hill Pulse Report", Integrated Project Delivery Team, Cathedral Hill Hospital Project, December, San Francisco, CA, 10 pp.
-
(2008)
Integrated Project Delivery Team
-
-
-
15
-
-
45849086928
-
Investigating the relationship between planning reliability and project performance
-
July
-
Gonzalez, V., Alarcon, L.F., and Mundaca, F. (2008). "Investigating the relationship between planning reliability and project performance", Production Planning & Control, Vol. 19, No.5, July, pp. 461-474.
-
(2008)
Production Planning & Control
, vol.19
, Issue.5
, pp. 461-474
-
-
Gonzalez, V.1
Alarcon, L.F.2
Mundaca, F.3
-
16
-
-
69949104826
-
Improving construction workflow-the connective role of lookahead planning
-
16-18 July, Manchester, UK
-
th Ann. Conf. Int'l. Group for Lean Constr., IGLC 16, 16-18 July, Manchester, UK, pp. 635-646.
-
(2008)
th Ann. Conf. Int'l. Group for Lean Constr., IGLC 16
, pp. 635-646
-
-
Hamzeh, F.R.1
Ballard, G.2
Tommelein, I.D.3
-
18
-
-
0004253213
-
-
rd Ed., Irwin/McGraw-Hill, Boston
-
Hopp, W.J., and Spearman, M.L. (2008). Factory Physics, 3rd Ed., Irwin/ McGraw-Hill, Boston, 720 pp.
-
(2008)
Factory Physics
-
-
Hopp, W.J.1
Spearman, M.L.2
-
19
-
-
84856634247
-
Integrated form of agreement
-
IFOA, Cathedral Hill Hospital Project, San Francisco, CA
-
IFOA (2008). "Integrated Form of Agreement", Integrated Project Delivery Team, Cathedral Hill Hospital Project, San Francisco, CA.
-
(2008)
Integrated Project Delivery Team
-
-
-
20
-
-
84866125494
-
Medium-term planning: Contributions based on field application
-
18-20 July, East Lansing, Michigan
-
th Ann. Conf. Int'l. Group for Lean Constr., IGLC 15, 18-20 July, East Lansing, Michigan, pp. 509-518.
-
(2007)
th Ann. Conf. Int'l. Group for Lean Constr., IGLC 15
, pp. 509-518
-
-
Kemmer, S.L.1
Heineck, L.F.M.2
Novaes, M.V.3
Mourao, A.M.A.4
Da Alves, T.C.L.5
-
21
-
-
77955340018
-
The integrated agreement for lean project delivery
-
Lichtig, W.A. (2006). "The Integrated Agreement for Lean Project Delivery", Construction Lawyer, No. 3, Vol. 26, 8 pp.
-
(2006)
Construction Lawyer
, vol.26
, Issue.3
-
-
Lichtig, W.A.1
-
23
-
-
0032119946
-
Building operations management theory through case and field research
-
PII S0272696398000230
-
Meredith, J. (1998) "Building Operations Management Theory through Case and Field Research." Journal of Operations Management, 16, pp. 441-454. (Pubitemid 128408887)
-
(1998)
Journal of Operations Management
, vol.16
, Issue.4
, pp. 441-454
-
-
Meredith, J.1
-
25
-
-
84856634246
-
-
OSHPD (Office of Statewide Health Planning and Development), Facilities Development Division, White Paper
-
OSHPD (Office of Statewide Health Planning and Development) (2008). "Phased Plan Review", Facilities Development Division, White Paper, 13pp.
-
(2008)
Phased Plan Review
-
-
-
26
-
-
84856629020
-
Implications of action theories to lean construction applications
-
18-20 July, East Lansing, Michigan, USA
-
Senior, B.A. (2007). "Implications of Action Theories to Lean Construction Applications", Proceedings of the 15th Annual Conference of the International Group for Lean Construction, IGLC 15, 18-20 July, East Lansing, Michigan, USA, pp. 407-416.
-
(2007)
th Annual Conference of the International Group for Lean Construction, IGLC 15
, pp. 407-416
-
-
Senior, B.A.1
-
28
-
-
0036722599
-
Effective case research in operations management: A process perspective
-
DOI 10.1016/S0272-6963(02)00022-0, PII S0272696302000220
-
Stuart, I., McCutcheon, D., Handfield, R., McLachlin, R., Samson, D. (2002) "Effective Case Research in Operations Management: A Process Perspective." Journal of Operations Management, 20, pp. 419-433. (Pubitemid 34813929)
-
(2002)
Journal of Operations Management
, vol.20
, Issue.5
, pp. 419-433
-
-
Stuart, I.1
McCutcheon, D.2
Handfield, R.3
McLachlin, R.4
Samson, D.5
-
29
-
-
13944264416
-
Look-ahead planning: Screening and pulling
-
Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA
-
Tommelein, I.D. and Ballard, G. (1997). "Look-ahead Planning: Screening and Pulling." Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA.
-
(1997)
Technical Report No. 97-9, Construction Engineering and Management Program
-
-
Tommelein, I.D.1
Ballard, G.2
-
30
-
-
84982242678
-
-
Validation Study Report, , Cathedral Hill Hospital Project, 16 July, San Francisco, CA
-
Validation Study Report (2007). Integrated Project Delivery Team, Cathedral Hill Hospital Project, 16 July, San Francisco, CA, 790 pp.
-
(2007)
Integrated Project Delivery Team
-
-
|