-
4
-
-
0032649356
-
Economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future
-
Jaber, MY and M Bonney (1999). Economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future. International Journal of Production Economics, 59, 93-102.
-
(1999)
International Journal of Production Economics
, vol.59
, pp. 93-102
-
-
Jaber, M.Y.1
Bonney, M.2
-
5
-
-
84989674850
-
Production lot sizing under set-up and worker learning
-
Karwan, K, J Mazzola and R Morey (1988). Production lot sizing under set-up and worker learning. Naval Research Logistics, 35, 159-179.
-
(1988)
Naval Research Logistics
, vol.35
, pp. 159-179
-
-
Karwan, K.1
Mazzola, J.2
Morey, R.3
-
8
-
-
0030734196
-
Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies
-
Moon, I and S Choi (1997). Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies. International Journal of Production Economics, 48, 21-28.
-
(1997)
International Journal of Production Economics
, vol.48
, pp. 21-28
-
-
Moon, I.1
Choi, S.2
-
10
-
-
0032210280
-
A note on lead time and distribution assumptions in continuous review inventory models
-
Moon, I and S Choi (1998). A note on lead time and distribution assumptions in continuous review inventory models. Computers and Op. Res., 25, 1007-1012.
-
(1998)
Computers and Op. Res
, vol.25
, pp. 1007-1012
-
-
Moon, I.1
Choi, S.2
-
11
-
-
0033731023
-
The multi-item newsvendor problem with a budget constraint and fixed ordering costs
-
Moon, I and E Silver (2000). The multi-item newsvendor problem with a budget constraint and fixed ordering costs. Journal of the Operational Research Society, 51, 602-608.
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 602-608
-
-
Moon, I.1
Silver, E.2
-
13
-
-
0032156988
-
A minimax distribution free procedure for mixed inventory model with variable lead time
-
Ouyang, LY and KS Wu (1998). A minimax distribution free procedure for mixed inventory model with variable lead time. International Journal of Production Economics, 56, 511-516.
-
(1998)
International Journal of Production Economics
, vol.56
, pp. 511-516
-
-
Ouyang, L.Y.1
Wu, K.S.2
-
14
-
-
0033285739
-
Lead time and ordering cost reductions review inventory systems with partial backorders
-
Ouyang, LY, CK Chen, and HC Chang (1999). Lead time and ordering cost reductions review inventory systems with partial backorders. Journal of the Operational Research Society, 50, 1272-1279.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 1272-1279
-
-
Ouyang, L.Y.1
Chen, C.K.2
Chang, H.C.3
-
16
-
-
0024132056
-
The strategic use of smaller lot sizes through a new EOQ model
-
Replogle, SH (1988). The strategic use of smaller lot sizes through a new EOQ model. Production and Inventory Management Journal, 29, 41-44.
-
(1988)
Production and Inventory Management Journal
, vol.29
, pp. 41-44
-
-
Replogle, S.H.1
-
18
-
-
0035898993
-
The multi-item single period problem with an initial stock of convertible units
-
Silver, E and I Moon (2001). The multi-item single period problem with an initial stock of convertible units. Eur. J. of Op. Res., 132, 466-477.
-
(2001)
Eur. J. of Op. Res
, vol.132
, pp. 466-477
-
-
Silver, E.1
Moon, I.2
-
19
-
-
13444305317
-
-
Canada: Prentice-Hall
-
Trim, DW (1993). Calculus. Canada: Prentice-Hall.
-
(1993)
Calculus
-
-
Trim, D.W.1
-
20
-
-
1342266030
-
Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
-
Yang, JS and JCH Pan (2004). Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res., 42, 853-864.
-
(2004)
Int. J. Prod. Res
, vol.42
, pp. 853-864
-
-
Yang, J.S.1
Pan, J.C.H.2
|