-
1
-
-
26844489964
-
An automated approach verifies parts placement
-
Aguayo, K., K. Tran. 1994. An automated approach verifies parts placement. Surface Mount Technology 8(1) 39-41.
-
(1994)
Surface Mount Technology
, vol.8
, Issue.1
, pp. 39-41
-
-
Aguayo, K.1
Tran, K.2
-
2
-
-
26844449726
-
Productivity improvements in SMED placement through CAPP
-
Ammons, J. C., M. Carlyle, G. W. Depuy, K. P. Ellis, L. F. McGinnis, C. A. Tovey, H. Xu. 1992. Productivity improvements in SMED placement through CAPP. ISHM 3992 Proceedings 18-22.
-
(1992)
ISHM 3992 Proceedings
, pp. 18-22
-
-
Ammons, J.C.1
Carlyle, M.2
Depuy, G.W.3
Ellis, K.P.4
McGinnis, L.F.5
Tovey, C.A.6
Xu, H.7
-
3
-
-
0028480771
-
Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell
-
Askin, R. G., M. Dror, A. J. Vakharia. 1994. Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell. Naval Research Logistics 41 587-608.
-
(1994)
Naval Research Logistics
, vol.41
, pp. 587-608
-
-
Askin, R.G.1
Dror, M.2
Vakharia, A.J.3
-
5
-
-
10444278983
-
Logistics tools: Lowering set-up costs
-
Cavinato, J. 1991. Logistics tools: Lowering set-up costs. Distribution 90(6) 52-53.
-
(1991)
Distribution
, vol.90
, Issue.6
, pp. 52-53
-
-
Cavinato, J.1
-
6
-
-
5644265165
-
Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production
-
Chiu, H. N., H. M. Chen, L. C. Weng. 2003. Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production. Production and Operations Management 12(1) 120-127.
-
(2003)
Production and Operations Management
, vol.12
, Issue.1
, pp. 120-127
-
-
Chiu, H.N.1
Chen, H.M.2
Weng, L.C.3
-
7
-
-
26844440263
-
-
M.S. Thesis, School of Engineering, University of California at San Diego, San Diego, California
-
Coble, S. 1996. Machine setup time reduction for electronics assembly. M.S. Thesis, School of Engineering, University of California at San Diego, San Diego, California.
-
(1996)
Machine Setup Time Reduction for Electronics Assembly
-
-
Coble, S.1
-
8
-
-
0031140855
-
The assembly of printed circuit boards: A case with multiple machines and multiple board types
-
Crama, Y., O. E. Flippo, J. vandeKlundert, F. C. R. Spieksma. 1997. The assembly of printed circuit boards: A case with multiple machines and multiple board types. European Journal of Operational Research 98(3) 457-472.
-
(1997)
European Journal of Operational Research
, vol.98
, Issue.3
, pp. 457-472
-
-
Crama, Y.1
Flippo, O.E.2
Vandeklundert, J.3
Spieksma, F.C.R.4
-
9
-
-
0004292846
-
-
Harper Collins, New York, New York
-
Davidow, W. H., M. S. Malone. 1992. The virtual corporation. Harper Collins, New York, New York, 124-125.
-
(1992)
The Virtual Corporation
, pp. 124-125
-
-
Davidow, W.H.1
Malone, M.S.2
-
10
-
-
0022239491
-
The impact of reduced setup time
-
Fourth Quarter
-
Esrock, Y. P. 1985. The impact of reduced setup time. Production and Inventory Management Fourth Quarter, 94-101.
-
(1985)
Production and Inventory Management
, pp. 94-101
-
-
Esrock, Y.P.1
-
12
-
-
0032019315
-
Job sequencing and component set-up on a surface mount placement machine
-
Gunther, H. O., M. Gronalt, R. Zeller. 1998. Job sequencing and component set-up on a surface mount placement machine. Production Planning and Control 9(2) 201-211.
-
(1998)
Production Planning and Control
, vol.9
, Issue.2
, pp. 201-211
-
-
Gunther, H.O.1
Gronalt, M.2
Zeller, R.3
-
13
-
-
0002687992
-
Impact of the setup variable on capacity and inventory decisions
-
Hahn, C. K., D. J. Bragg, D. Shin, 1988. Impact of the setup variable on capacity and inventory decisions. Academy of Management Review 13(1) 91-103.
-
(1988)
Academy of Management Review
, vol.13
, Issue.1
, pp. 91-103
-
-
Hahn, C.K.1
Bragg, D.J.2
Shin, D.3
-
14
-
-
0004102424
-
-
Dow Jones-Irwin, Homewood, Illinois
-
Hall, R. W. 1983. Zero inventories. Dow Jones-Irwin, Homewood, Illinois, 84.
-
(1983)
Zero Inventories
, pp. 84
-
-
Hall, R.W.1
-
15
-
-
84990602497
-
Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment
-
Handfield, R. 1993. Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment. Decision Sciences 24(3) 581-585.
-
(1993)
Decision Sciences
, vol.24
, Issue.3
, pp. 581-585
-
-
Handfield, R.1
-
16
-
-
0024737593
-
Driving down downtime
-
Hay, E. J. 1989. Driving down downtime. Manufacturing Engineering 103(3) 41-44.
-
(1989)
Manufacturing Engineering
, vol.103
, Issue.3
, pp. 41-44
-
-
Hay, E.J.1
-
17
-
-
0026938315
-
A dynamic approach to operations management: An alternative to static optimization
-
Jaikumar, R., R. Bohn. 1992. A dynamic approach to operations management: An alternative to static optimization. International Journal of Production Economics 265-282.
-
(1992)
International Journal of Production Economics
, pp. 265-282
-
-
Jaikumar, R.1
Bohn, R.2
-
18
-
-
0030282977
-
Implementing setup optimization on the shop floor
-
Jain, S., M. E. Johnson, F. Safai. 1996. Implementing setup optimization on the shop floor. Operations Research 44(6) 843-851.
-
(1996)
Operations Research
, vol.44
, Issue.6
, pp. 843-851
-
-
Jain, S.1
Johnson, M.E.2
Safai, F.3
-
19
-
-
10444255675
-
Scheduling hybrid flowshops in printed circuit board assembly lines
-
Jin, Z. H., K. Ohno, T. Ito, S. E. Elmaghraby. 2002. Scheduling hybrid flowshops in printed circuit board assembly lines. Production and Operations Management 11(2) 216-230.
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 216-230
-
-
Jin, Z.H.1
Ohno, K.2
Ito, T.3
Elmaghraby, S.E.4
-
20
-
-
84986946649
-
Evaluating order release mechanisms in a job shop with sequence-dependent setup times
-
Kim, S. C., P. M. Bobrowski. 1995. Evaluating order release mechanisms in a job shop with sequence-dependent setup times. Production and Operations Management 4(2) 163-180.
-
(1995)
Production and Operations Management
, vol.4
, Issue.2
, pp. 163-180
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
22
-
-
5644303213
-
Planning and scheduling in supply chains: An overview of issues in practice
-
Kreipl, S., M. Pinedo. 2005. Planning and scheduling in supply chains: An overview of issues in practice. Production and Operations Management 13(1) 77-92.
-
(2005)
Production and Operations Management
, vol.13
, Issue.1
, pp. 77-92
-
-
Kreipl, S.1
Pinedo, M.2
-
23
-
-
0031627962
-
A comparison of setup strategies for printed circuit board assembly
-
Leon, V. J., B. A. Peters. 1998. A comparison of setup strategies for printed circuit board assembly. Computers and Industrial Engineering 34(1) 219-234.
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.1
, pp. 219-234
-
-
Leon, V.J.1
Peters, B.A.2
-
24
-
-
0011964937
-
An empirical study of the setup-reduction process
-
Leschke, J. P. 1996. An empirical study of the setup-reduction process. Production and Operations Management 5(2) 121-131.
-
(1996)
Production and Operations Management
, vol.5
, Issue.2
, pp. 121-131
-
-
Leschke, J.P.1
-
26
-
-
0012011429
-
A comparison of rules for allocating setup-reduction investments in a capacitated environment
-
Leschke, J. P., E. N. Weiss. 1997. A comparison of rules for allocating setup-reduction investments in a capacitated environment. Production and Operations Management 6(4) 329-340.
-
(1997)
Production and Operations Management
, vol.6
, Issue.4
, pp. 329-340
-
-
Leschke, J.P.1
Weiss, E.N.2
-
27
-
-
0346446112
-
Investment in setup cost, lead time, and demand predictability improvement in the EOQ model
-
Li, C. L., S. J. Erlebacher, D. H. Kropp. 1997. Investment in setup cost, lead time, and demand predictability improvement in the EOQ model. Production and Operations Management 6(4)341-352.
-
(1997)
Production and Operations Management
, vol.6
, Issue.4
, pp. 341-352
-
-
Li, C.L.1
Erlebacher, S.J.2
Kropp, D.H.3
-
28
-
-
0035295264
-
Component to multi-track feeder assignment and board sequencing in printed circuit board assembly
-
Li, Y. A., S. Randhawa. 2002. Component to multi-track feeder assignment and board sequencing in printed circuit board assembly. Journal of Electronics Manufacturing 11(1) 51-68.
-
(2002)
Journal of Electronics Manufacturing
, vol.11
, Issue.1
, pp. 51-68
-
-
Li, Y.A.1
Randhawa, S.2
-
29
-
-
0033461451
-
Rapid changeover - A pre-requisite for responsive manufacture
-
Mileham, A. R., S. J. Culley, G.W. Owen, R. I. McIntosh, 1999. Rapid changeover - A pre-requisite for responsive manufacture. International Journal of Operations and Production Management 19(8) 785-796.
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.8
, pp. 785-796
-
-
Mileham, A.R.1
Culley, S.J.2
Owen, G.W.3
McIntosh, R.I.4
-
31
-
-
26844481394
-
Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment
-
International
-
Moxham, C., R. Greatbanks. 2001. Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. Journal of Quality and Reliability Measurement 18(4) (International) 404-414.
-
(2001)
Journal of Quality and Reliability Measurement
, vol.18
, Issue.4
, pp. 404-414
-
-
Moxham, C.1
Greatbanks, R.2
-
32
-
-
0042970350
-
The principles of foolproofing and their application in manufacturing
-
Nakajo, T., H. Kume. 1985. The principles of foolproofing and their application in manufacturing. Reports of Statistical Applications Research 32(2) 10-29.
-
(1985)
Reports of Statistical Applications Research
, vol.32
, Issue.2
, pp. 10-29
-
-
Nakajo, T.1
Kume, H.2
-
33
-
-
26844439465
-
Decision support system for intelligent parts/slot assignment on a SMT placement machine
-
Sadiq, M., T. L. Landers. 1991. Decision support system for intelligent parts/slot assignment on a SMT placement machine. Computers and Industrial Engineering 21(1-4), 565-574.
-
(1991)
Computers and Industrial Engineering
, vol.21
, Issue.1-4
, pp. 565-574
-
-
Sadiq, M.1
Landers, T.L.2
-
35
-
-
9744235281
-
SMED for high-mix assembly
-
Sharma, V. 2001. SMED for high-mix assembly. Circuits Assembly 12(1) 62, 64-66 68.
-
(2001)
Circuits Assembly
, vol.12
, Issue.1
, pp. 62
-
-
Sharma, V.1
-
37
-
-
0037741135
-
A hierarchical classification scheme for electronics assembly problems
-
Oulu, Finland
-
Smed, J., M. Johnsson, O. Nevalainen. 2000. A hierarchical classification scheme for electronics assembly problems. Proceedings of TOOLMET 2000 Symposium - Tool Environments and Developments Methods for Intelligent Systems, Oulu, Finland, 116-119.
-
(2000)
Proceedings of TOOLMET 2000 Symposium - Tool Environments and Developments Methods for Intelligent Systems
, pp. 116-119
-
-
Smed, J.1
Johnsson, M.2
Nevalainen, O.3
-
38
-
-
0023437336
-
Setup reduction and increased effective capacity
-
Spence, A. M., E. L. Porteus. 1987. Setup reduction and increased effective capacity. Management Science 32(10) 1291-1301.
-
(1987)
Management Science
, vol.32
, Issue.10
, pp. 1291-1301
-
-
Spence, A.M.1
Porteus, E.L.2
|