메뉴 건너뛰기




Volumn 14, Issue 2, 2005, Pages 205-217

Setup time reduction for electronics assembly: Combining simple (SMED) and IT-based methods

Author keywords

Flexibility; Printed circuit board assembly; Process improvement; Setup reduction; SMED

Indexed keywords


EID: 26844524646     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2005.tb00019.x     Document Type: Article
Times cited : (63)

References (40)
  • 1
    • 26844489964 scopus 로고
    • An automated approach verifies parts placement
    • Aguayo, K., K. Tran. 1994. An automated approach verifies parts placement. Surface Mount Technology 8(1) 39-41.
    • (1994) Surface Mount Technology , vol.8 , Issue.1 , pp. 39-41
    • Aguayo, K.1    Tran, K.2
  • 3
    • 0028480771 scopus 로고
    • Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell
    • Askin, R. G., M. Dror, A. J. Vakharia. 1994. Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell. Naval Research Logistics 41 587-608.
    • (1994) Naval Research Logistics , vol.41 , pp. 587-608
    • Askin, R.G.1    Dror, M.2    Vakharia, A.J.3
  • 5
    • 10444278983 scopus 로고
    • Logistics tools: Lowering set-up costs
    • Cavinato, J. 1991. Logistics tools: Lowering set-up costs. Distribution 90(6) 52-53.
    • (1991) Distribution , vol.90 , Issue.6 , pp. 52-53
    • Cavinato, J.1
  • 6
    • 5644265165 scopus 로고    scopus 로고
    • Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production
    • Chiu, H. N., H. M. Chen, L. C. Weng. 2003. Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production. Production and Operations Management 12(1) 120-127.
    • (2003) Production and Operations Management , vol.12 , Issue.1 , pp. 120-127
    • Chiu, H.N.1    Chen, H.M.2    Weng, L.C.3
  • 7
    • 26844440263 scopus 로고    scopus 로고
    • M.S. Thesis, School of Engineering, University of California at San Diego, San Diego, California
    • Coble, S. 1996. Machine setup time reduction for electronics assembly. M.S. Thesis, School of Engineering, University of California at San Diego, San Diego, California.
    • (1996) Machine Setup Time Reduction for Electronics Assembly
    • Coble, S.1
  • 10
  • 12
    • 0032019315 scopus 로고    scopus 로고
    • Job sequencing and component set-up on a surface mount placement machine
    • Gunther, H. O., M. Gronalt, R. Zeller. 1998. Job sequencing and component set-up on a surface mount placement machine. Production Planning and Control 9(2) 201-211.
    • (1998) Production Planning and Control , vol.9 , Issue.2 , pp. 201-211
    • Gunther, H.O.1    Gronalt, M.2    Zeller, R.3
  • 13
    • 0002687992 scopus 로고
    • Impact of the setup variable on capacity and inventory decisions
    • Hahn, C. K., D. J. Bragg, D. Shin, 1988. Impact of the setup variable on capacity and inventory decisions. Academy of Management Review 13(1) 91-103.
    • (1988) Academy of Management Review , vol.13 , Issue.1 , pp. 91-103
    • Hahn, C.K.1    Bragg, D.J.2    Shin, D.3
  • 14
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood, Illinois
    • Hall, R. W. 1983. Zero inventories. Dow Jones-Irwin, Homewood, Illinois, 84.
    • (1983) Zero Inventories , pp. 84
    • Hall, R.W.1
  • 15
    • 84990602497 scopus 로고
    • Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment
    • Handfield, R. 1993. Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment. Decision Sciences 24(3) 581-585.
    • (1993) Decision Sciences , vol.24 , Issue.3 , pp. 581-585
    • Handfield, R.1
  • 16
    • 0024737593 scopus 로고
    • Driving down downtime
    • Hay, E. J. 1989. Driving down downtime. Manufacturing Engineering 103(3) 41-44.
    • (1989) Manufacturing Engineering , vol.103 , Issue.3 , pp. 41-44
    • Hay, E.J.1
  • 17
    • 0026938315 scopus 로고
    • A dynamic approach to operations management: An alternative to static optimization
    • Jaikumar, R., R. Bohn. 1992. A dynamic approach to operations management: An alternative to static optimization. International Journal of Production Economics 265-282.
    • (1992) International Journal of Production Economics , pp. 265-282
    • Jaikumar, R.1    Bohn, R.2
  • 18
    • 0030282977 scopus 로고    scopus 로고
    • Implementing setup optimization on the shop floor
    • Jain, S., M. E. Johnson, F. Safai. 1996. Implementing setup optimization on the shop floor. Operations Research 44(6) 843-851.
    • (1996) Operations Research , vol.44 , Issue.6 , pp. 843-851
    • Jain, S.1    Johnson, M.E.2    Safai, F.3
  • 20
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent setup times
    • Kim, S. C., P. M. Bobrowski. 1995. Evaluating order release mechanisms in a job shop with sequence-dependent setup times. Production and Operations Management 4(2) 163-180.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.C.1    Bobrowski, P.M.2
  • 22
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • Kreipl, S., M. Pinedo. 2005. Planning and scheduling in supply chains: An overview of issues in practice. Production and Operations Management 13(1) 77-92.
    • (2005) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 23
    • 0031627962 scopus 로고    scopus 로고
    • A comparison of setup strategies for printed circuit board assembly
    • Leon, V. J., B. A. Peters. 1998. A comparison of setup strategies for printed circuit board assembly. Computers and Industrial Engineering 34(1) 219-234.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.1 , pp. 219-234
    • Leon, V.J.1    Peters, B.A.2
  • 24
    • 0011964937 scopus 로고    scopus 로고
    • An empirical study of the setup-reduction process
    • Leschke, J. P. 1996. An empirical study of the setup-reduction process. Production and Operations Management 5(2) 121-131.
    • (1996) Production and Operations Management , vol.5 , Issue.2 , pp. 121-131
    • Leschke, J.P.1
  • 26
    • 0012011429 scopus 로고    scopus 로고
    • A comparison of rules for allocating setup-reduction investments in a capacitated environment
    • Leschke, J. P., E. N. Weiss. 1997. A comparison of rules for allocating setup-reduction investments in a capacitated environment. Production and Operations Management 6(4) 329-340.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 329-340
    • Leschke, J.P.1    Weiss, E.N.2
  • 27
    • 0346446112 scopus 로고    scopus 로고
    • Investment in setup cost, lead time, and demand predictability improvement in the EOQ model
    • Li, C. L., S. J. Erlebacher, D. H. Kropp. 1997. Investment in setup cost, lead time, and demand predictability improvement in the EOQ model. Production and Operations Management 6(4)341-352.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 341-352
    • Li, C.L.1    Erlebacher, S.J.2    Kropp, D.H.3
  • 28
    • 0035295264 scopus 로고    scopus 로고
    • Component to multi-track feeder assignment and board sequencing in printed circuit board assembly
    • Li, Y. A., S. Randhawa. 2002. Component to multi-track feeder assignment and board sequencing in printed circuit board assembly. Journal of Electronics Manufacturing 11(1) 51-68.
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.1 , pp. 51-68
    • Li, Y.A.1    Randhawa, S.2
  • 30
    • 26844466754 scopus 로고
    • Required setup reductions in JIT driven MRP systems
    • Mirza, M. A., E. M. Malstrom. 1994. Required setup reductions in JIT driven MRP systems. Computers and Industrial Engineering 27(1-4) 221-224.
    • (1994) Computers and Industrial Engineering , vol.27 , Issue.1-4 , pp. 221-224
    • Mirza, M.A.1    Malstrom, E.M.2
  • 31
    • 26844481394 scopus 로고    scopus 로고
    • Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment
    • International
    • Moxham, C., R. Greatbanks. 2001. Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. Journal of Quality and Reliability Measurement 18(4) (International) 404-414.
    • (2001) Journal of Quality and Reliability Measurement , vol.18 , Issue.4 , pp. 404-414
    • Moxham, C.1    Greatbanks, R.2
  • 32
    • 0042970350 scopus 로고
    • The principles of foolproofing and their application in manufacturing
    • Nakajo, T., H. Kume. 1985. The principles of foolproofing and their application in manufacturing. Reports of Statistical Applications Research 32(2) 10-29.
    • (1985) Reports of Statistical Applications Research , vol.32 , Issue.2 , pp. 10-29
    • Nakajo, T.1    Kume, H.2
  • 33
    • 26844439465 scopus 로고
    • Decision support system for intelligent parts/slot assignment on a SMT placement machine
    • Sadiq, M., T. L. Landers. 1991. Decision support system for intelligent parts/slot assignment on a SMT placement machine. Computers and Industrial Engineering 21(1-4), 565-574.
    • (1991) Computers and Industrial Engineering , vol.21 , Issue.1-4 , pp. 565-574
    • Sadiq, M.1    Landers, T.L.2
  • 35
    • 9744235281 scopus 로고    scopus 로고
    • SMED for high-mix assembly
    • Sharma, V. 2001. SMED for high-mix assembly. Circuits Assembly 12(1) 62, 64-66 68.
    • (2001) Circuits Assembly , vol.12 , Issue.1 , pp. 62
    • Sharma, V.1
  • 38
    • 0023437336 scopus 로고
    • Setup reduction and increased effective capacity
    • Spence, A. M., E. L. Porteus. 1987. Setup reduction and increased effective capacity. Management Science 32(10) 1291-1301.
    • (1987) Management Science , vol.32 , Issue.10 , pp. 1291-1301
    • Spence, A.M.1    Porteus, E.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.