Statistical properties of construction duration data
-
doi:10.1061/(ASCE)0733-9364(1992)118:3(525)
-
AbouRizk, S. M.; Halpin, D. W. 1992. Statistical properties of construction duration data, Journal of Construction Engineering and Management ASCE 118(3): 525-544. doi:10.1061/(ASCE)0733-9364(1992)118:3(525)
-
(1992)
Journal of Construction Engineering and Management ASCE
, vol.118
, Issue.3
, pp. 525-544
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
3
-
-
34249792364
-
Predicting construction productivity using situation-based simulation models
-
doi:10.1139/L06-088
-
Choy, E.; Ruwanpura, J. Y. 2006. Predicting construction productivity using situation-based simulation models, Canadian Journal of Civil Engineering NRC 33(12): 1585-1600. doi:10.1139/L06-088
-
(2006)
Canadian Journal of Civil Engineering NRC
, vol.33
, Issue.12
, pp. 1585-1600
-
-
Choy, E.1
Ruwanpura, J.Y.2
-
6
-
-
0043275938
-
Time-lapse applications for construction project management
-
doi:10.1061/(ASCE)0733-9364(1998)124:3(204)
-
Everett, J. G.; Halkali, H.; Schlaff, T. G. 1998. Time-lapse applications for construction project management, Journal of Construction Engineering and Management ASCE 124(3): 204-209. doi:10.1061/(ASCE)0733-9364(1998)124:3(204)
-
(1998)
Journal of Construction Engineering and Management ASCE
, vol.124
, Issue.3
, pp. 204-209
-
-
Everett, J.G.1
Halkali, H.2
Schlaff, T.G.3
-
7
-
-
0041304359
-
Unified modeling methodology for construction simulation
-
doi:10.1061/(ASCE)0733-9364(2002)128:2(174)
-
Hajjar, D.; AbouRizk, S. M. 2002. Unified modeling methodology for construction simulation, Journal of Construction Engineering and Management ASCE 128(2): 174-185. doi:10.1061/(ASCE)0733-9364(2002)128:2(174)
-
(2002)
Journal of Construction Engineering and Management ASCE
, vol.128
, Issue.2
, pp. 174-185
-
-
Hajjar, D.1
Abourizk, S.M.2
-
8
-
-
0003402124
-
-
John Wiley & Sons, Inc., New York, NY
-
Halpin, D. W.; Riggs, L. S. 1992. Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, NY. 381 p.
-
(1992)
Planning and Analysis of Construction Operations
, pp. 381
-
-
Halpin, D.W.1
Riggs, L.S.2
-
10
-
-
33846665985
-
The use of simulation for productivity estimation based on multiple regression analysis
-
Ed. by M. E. Kuhl, N. M. Steiger, F. B. Armstrong, J. A. Jones IEEE, Piscataway, NJ
-
Han, S.; Halpin, D. W. 2005. The use of simulation for productivity estimation based on multiple regression analysis, in Proc. of the 2005 Winter Simulation Conference, Orlan-do, Florida, 2005. Ed. by M. E. Kuhl, N. M. Steiger, F. B. Armstrong, J. A. Jones. IEEE, Piscataway, NJ. 1492-1499.
-
(2005)
Proc. of the 2005 Winter Simulation Conference, Orlan-Do, Florida 2005
, pp. 1492-1499
-
-
Han, S.1
Halpin, D.W.2
-
11
-
-
46849098451
-
Productivity prediction of conventional and GPS-based earthmoving systems using simulation and multiple regression analysis
-
doi:10.1139/L08-005
-
Han, S.; Hong, T.; Lee, S. 2008. Productivity prediction of conventional and GPS-based earthmoving systems using simulation and multiple regression analysis, Canadian Journal of Civil Engineering NRC 35(6): 574-587. doi:10.1139/L08-005
-
(2008)
Canadian Journal of Civil Engineering NRC
, vol.35
, Issue.6
, pp. 574-587
-
-
Han, S.1
Hong, T.2
Lee, S.3
-
12
-
-
33846660491
-
Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations
-
Han, S.; Lee, S.; Hong, T.; Chang, H. 2006. Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations, Canadian Journal of Civil Engineering NRC 33(9): 1005-1114.
-
(2006)
Canadian Journal of Civil Engineering NRC
, vol.33
, Issue.9
, pp. 1005-1114
-
-
Han, S.1
Lee, S.2
Hong, T.3
Chang, H.4
-
13
-
-
77955717400
-
Estimation of earthworks execution time cost by means of artificial neural networks
-
doi:10.1016/j.autcon.2010.02.004
-
Hola, B.; Schabowicz, K. 2010. Estimation of earthworks execution time cost by means of artificial neural networks, Automation in Construction 19(5): 570-579. doi:10.1016/j.autcon.2010.02.004
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 570-579
-
-
Hola, B.1
Schabowicz, K.2
-
14
-
-
0000290973
-
Comparison of construction alternatives using matched simulation experiments
-
doi:10.1061/(ASCE)0733-9364(1996)122:3(231)
-
Ioannou, P. G.; Martinez, J. C. 1996. Comparison of construction alternatives using matched simulation experiments, Journal of Construction Engineering and Management ASCE 122(3): 231-241. doi:10.1061/(ASCE)0733- 9364(1996)122:3(231)
-
(1996)
Journal of Construction Engineering and Management ASCE
, vol.122
, Issue.3
, pp. 231-241
-
-
Ioannou, P.G.1
Martinez, J.C.2
-
15
-
-
23244452976
-
Parallel computing framework for optimizing construction planning in large-scale projects
-
doi:10.1061/(ASCE)0887-3801(2005)19:3(304)
-
Kandil, A.; El-Rayes, K. 2005. Parallel computing framework for optimizing construction planning in large-scale projects, Journal of Computing in Civil Engineering ASCE 19(3): 304-312. doi:10.1061/(ASCE)0887-3801(2005)19: 3(304)
-
(2005)
Journal of Computing in Civil Engineering ASCE
, vol.19
, Issue.3
, pp. 304-312
-
-
Kandil, A.1
El-Rayes, K.2
-
17
-
-
0031331620
-
A framework for incorporating dynamic strategies in earth-moving simulations
-
Atlanta, GA 1997. Ed. by S. Andradottir, K. J. Healy, D. H. Withers, B. L. Nelson IEEE. Piscataway, NJ, USA
-
Kannan, G.; Martinez, J. C.; Vorster, M. C. 1997. A framework for incorporating dynamic strategies in earth-moving simulations, in Proc. of the 1997 Winter Simulation Confrence, Atlanta, GA. 1997. Ed. by S. Andradottir, K. J. Healy, D. H. Withers, B. L. Nelson. IEEE. Piscataway, NJ, USA. 1119-1126.
-
(1997)
Proc. of the 1997 Winter Simulation Confrence
, pp. 1119-1126
-
-
Kannan, G.1
Martinez, J.C.2
Vorster, M.C.3
-
18
-
-
0028741632
-
General purpose simulation with STROBOCOPE
-
Lake Buena Vista, FL 1994. Ed. by J. D. Tew, S. Manivannan, D. Sadowski, A. F. Seila IEEE. Piscataway, NJ, USA
-
Martinez, J. C.; Ioannou, P. G. 1994. General purpose simulation with STROBOCOPE, in Proc. of the 1994 Winter Simulation Conference, Lake Buena Vista, FL, 1994. Ed. by J. D. Tew, S. Manivannan, D. Sadowski, A. F. Seila. IEEE. Piscataway, NJ, USA. 1159-1166.
-
(1994)
Proc. of the 1994 Winter Simulation Conference
, pp. 1159-1166
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
19
-
-
23244432395
-
Framework for building intelligent simulation models of construction operations
-
doi:10.1061/(ASCE)0887-3801(2005) 19:3 (277)
-
Mohamed, Y.; AbouRizk, S. M. 2005. Framework for building intelligent simulation models of construction operations, Journal of Computing in Civil Engineering ASCE 19(3): 277-291. doi:10.1061/(ASCE)0887-3801(2005) 19:3(277)
-
(2005)
Journal of Computing in Civil Engineering ASCE 19
, vol.3
, pp. 277-291
-
-
Mohamed, Y.1
Abourizk, S.M.2
-
20
-
-
34249794569
-
A hybrid approach for developing special purpose simulation tools
-
doi:10.1139/L06-073
-
Mohamed, Y.; AbouRizk, S. M. 2006. A hybrid approach for developing special purpose simulation tools, Canadian Journal of Civil Engineering NRC 33(12): 1505-1515. doi:10.1139/L06-073
-
(2006)
Canadian Journal of Civil Engineering NRC
, vol.33
, Issue.12
, pp. 1505-1515
-
-
Mohamed, Y.1
Abourizk, S.M.2
-
21
-
-
0004149270
-
-
4th Ed. WCB/ McGraw Hill Boston MA
-
Neter, J.; Kutner, M. H.; Nachtsheim, C. J.; Wasserman, W. 1996. Applied linear statistical models. 4th Ed. WCB/McGraw Hill, Boston, MA. 1408 p.
-
(1996)
Applied Linear Statistical Models
, pp. 1408
-
-
Neter, J.1
Kutner, M.H.2
Nachtsheim, C.J.3
Wasserman, W.4
-
22
-
-
33847401433
-
Mathematical-neural model for assessing productivity of earthmoving machinery
-
Schabowicz, K.; Hola, B. 2007. Mathematical-neural model for assessing productivity of earthmoving machinery, Journal of Civil Engineering and Management 13(1): 47-54.
-
(2007)
Journal of Civil Engineering and Management
, vol.13
, Issue.1
, pp. 47-54
-
-
Schabowicz, K.1
Hola, B.2
-
24
-
-
0038800863
-
A neural network based system for predicting earthmoving production
-
doi:10.1080/014461999371385
-
Shi, J. J. 1999. A neural network based system for predicting earthmoving production, Construction Management and Economics 17(4): 463-171. doi:10.1080/014461999371385
-
(1999)
Construction Management and Economics
, vol.17
, Issue.4
, pp. 463-171
-
-
Shi, J.J.1
-
25
-
-
0032640764
-
Earthmoving productivity estimation using linear regression techniques
-
doi:10.1061/(ASCE)0733-9364(1999)125:3(133)
-
Smith, S. D. 1999. Earthmoving productivity estimation using linear regression techniques, Journal of Construction Engineering and Management ASCE 125(3): 133-141. doi:10.1061/(ASCE)0733-9364(1999)125:3(133)
-
(1999)
Journal of Construction Engineering and Management ASCE
, vol.125
, Issue.3
, pp. 133-141
-
-
Smith, S.D.1
-
26
-
-
0004164013
-
-
John Wiley & Sons, Inc., New York, NY. USA
-
Tsoukalas, L. H.; Uhrig, R. E. 1997. Fuzzy and neural approached in engineering. John Wiley & Sons, Inc., New York, NY. USA. 587 p.
-
(1997)
Fuzzy and Neural Approached in Engineering
, pp. 587
-
-
Tsoukalas, L.H.1
Uhrig, R.E.2
-
27
-
-
33744547729
-
Simulation modeling decision support through belief networks
-
doi:10.1016/j.simpat.2005.10.010
-
Van Tol, A. A.; AbouRizk, S. M. 2006. Simulation modeling decision support through belief networks, Simulation Modelling Practice and Theory 14(5): 614-640. doi:10.1016/j.simpat.2005.10.010
-
(2006)
Simulation Modelling Practice and Theory
, vol.14
, Issue.5
, pp. 614-640
-
-
Van Tol, A.A.1
Abourizk, S.M.2
-
28
-
-
17744365033
-
Simulation experiment for improving construction processes
-
Washington DC 2004. Ed. by R. G. Ingalls, M. D. Rossetti, J. S. Smith, B. A. Peters IEEE. Piscataway, NJ, USA
-
Wang, S.; Halpin, D. W. 2004. Simulation experiment for improving construction processes, in Proc. of the 2004 Winter Simulation Conference, Washington DC. 2004. Ed. by R. G. Ingalls, M. D. Rossetti, J. S. Smith, B. A. Peters, IEEE. Piscataway, NJ, USA. 1252-1259.
-
(2004)
Proc. of the 2004 Winter Simulation Conference
, pp. 1252-1259
-
-
Wang, S.1
Halpin, D.W.2
|